Chhabra Thermal Power Project is located near village Chowki Motipura in Tehsil Chabbra, Distt. Baran (Rajasthan) which is 22 Km from Chabbra Town ,10 Km from inter state border of Madya Pradesh, 147 Km from Kota. Plant site is well connected to State Highway-51 & located on Bina-Kota line of West Central Railway.


STAGE-I (Phase 1 & 2 )
|
Unit #1 (250MW) and Unit#2 (250 MW) of this project constructed under Stage-I (Phase-I) started commercial operation w.e.f. 11.06.2010 and 15.10.2011 respectively. Further Unit#3 (250 MW) constructed under under stage-I (Phase-II) started commercial operation operation w.e.f. 19.12.2013. Unit# 4(250 MW) is Commissioned on 30.06.14 and its commercial operation is expected in Dec 2014.
|
Project Highlights:
|
(1)
|
Installed Capacity
|
2X250 MW Stage- I, Phase- I
|
2X250 MW Stage- I, Phase- II
|
(2)
|
Estimated Cost
|
2820 Crores (Phase- I)
|
3033 Crores (Phase- II)
|
(3)
|
Land Acquired
|
526 Hectares (Stage-I)
|
(4)
|
Height of chimney
|
220 Meter each for Phase-I & II
|
(5)
|
ESP Efficiency
|
99.89%
|
(6)
|
Coal Requirement and Linkage
|
5.0 Million Tons per year
|
Unit-1&2- SECL, Kobra (C.G.) through washery circuit.
|
Unit-3&4- Parsa East & Kante Basen Coal Blocks through Parsa & Kante Colleries Ltd., Ambikapur (C.G.)
|
(7)
|
Water Requirement
|
800 MCFT/ Year (38500 M3/ day)(For Phase I&II from nearby Parvati, Bethali & Hinglot Dam.
|
(8)
|
Power Evacuation
|
400KV /220 kv Switchyard with Inter-connecting Transformers (ICT) through 400KV Bhilwara, 400KV Hindaun, 400KV Adani and 220 KV Jhalawar & 200 KV Kawai-Dahara feeders.
|
(9)
|
Date of COD
|
Phase -I & II
|
Unit #1- COD achieved on 11.06.2010
|
Unit #2- COD achieved on 15.10.2011
|
Unit #3- COD achieved on 19.12.2013
|
Unit #4-Commissioned on 30.06.14 & COD is expected in Dec. 2014
|
(10)
|
Environmental Features
|
Zero discharge concept adopted
|
ETP & STP established. Re-cycled water utilization for green belt development.
|
100% (Approx.) Fly Ash Utilization by cement & near-by bricks industries.
|
|
OPERATIONAL PARAMETERS
|
Year
|
Gen(MU)
|
PLF(%)
|
SPCFC COAL CONSUMPTION
|
SPCFC OIL CONSUMPTION
|
AUX. CONSUMPTION
|
2010-2011
|
971.36
|
55.07
|
0.64
|
5.38
|
11.37
|
2011-2012
|
2260.96
|
70.50
|
0.66
|
3.15
|
11.60
|
2012-2013
|
2924.17
|
66.76
|
0.64
|
1.65
|
10.69
|
2013-2014
|
3158.449
|
63.22
|
0.66
|
2.54
|
10.63
|
2018-19 |
7289.83 |
83.22 |
0.566 |
0.377 |
9.47 |
|
|
SALIENT FEATURES OF 2X660 MW SUPERCRITICAL UNIT # 5 & 6 STAGE-II, PHASE-III
|
(1)
|
Location
|
At Chowki Motipura about 22 Km from Chabbra Town in Baran District of Rajasthan. The site lies between- North Latitudes 24 degree 24 inches and East Longitude 77 Degree 03 inches.
|
(2)
|
Nearest Railway Station
|
Motipura Chowki ( Between Beena- Kota Section)
|
(3)
|
Installed Capacity
|
2X660 MW Stage-II, Phase- III
|
(4)
|
Estimated Cost
|
7920 Crores Rs.
|
(5)
|
Land Acquired
|
2361 Bigha (597.43 Hec.)
|
(6)
|
Height of Chimney
|
275 Meter (Twin Flue)
|
(7)
|
ESP Efficiency
|
99.89%
|
(8)
|
Fuel Requirement
|
Coa l- 6.5 MTPA
|
Unit # 5 - Parsa East & Kante Basan Coal Block
|
Unit # 6 - Kante Basan Extension Coal Block.
|
HSD/FO - 11563 KL/Year (for both units)
|
(9)
|
Water Requirement
|
1570 MCFT/ YEAR
|
Lhasi Irrigation Project- 300MCFT
|
Parvan Irrigation Project- 1270 MCFT
|
(10)
|
Scheduled Date of Commissioning
|
Unit#5 - September 2016
|
Unit#6 - June 2018
|
|