This scheme comprises of two power houses with installed capacity of one unit of 1.5MW at PH-I and One Unit of 650KW at PH-II.The power house II was commissioned in july 1992 and PH-I in Oct.1994.
SALIENT FEATURES
|
|
|
Power House-1 |
Power House-2 |
1. |
Installed Capacity |
1 x 1.5 MW |
1 x 0.650 MW |
2. |
Location of Power House |
Near R.D 618.825 of Indira Gandhi main canal |
Near R.D 49.252 Pugal branch of Indira Gandhi main canal |
3. |
Nearest Village |
Sattasar Distt.. Bikaner |
Dandi Distt..Bikaner |
4. |
Nearest Rly. Station |
Bikaner(80Km) |
Bikaner(95Km) |
5. |
Suppliers of main generating equipments |
M/s Jyoti Ltd. |
M/s Jyoti Ltd. |
6. |
Civil Contractors of PH Building |
M/s RSBCC |
M/s Shiva. Construction Co. |
7. |
Erector of main generating equipment |
M/s MKS Engineers |
M/s MKS Engineers |
8. |
Consultantst |
CEA for electrical works& WAPCOS for civil works |
CEA for electrical works& WAPCOS for civil works |
9. |
Designed Discharge |
17.246 Cumecs
|
13.994 Cumecs
|
10. |
Designed head |
9.73 M
|
5.48 M
|
11. |
Cement Consumption |
2650 MT
|
1330 MT
|
12. |
Steel Consumption |
560 MT
|
380 MT
|
13. |
Commissioning month |
Oct.94(Expect.) |
July’92 |
14. |
Planned annual generation |
58.72 lacs Uint |
326.84 lacs Uint |
15. |
Cost and Expenditure on Scheme (Rs.) |
|
650.70 lacs |
|
Original approved cost June,80 |
438.12 Lacs(including PH-I,PH-II) |
|
Revised Cost(1986 |
900.30 lacs |
Latest Cost(Rs.) |
11021.75 lacs |
Expenditure till 31.3.93(Rs.) |
753.17 lacs |
|