SAP MM Module

MM Module

S.No. Date Description
  July-2020 Record Note of Discussions held to review the working of Material Management Module of SAP-ERP on 8-9 July 2020
  FEB-2020 Scrap Material deposition process in ACOS
  JAN-2020 Process of procurement of items/services in SAP system
  DEC-2019 Survey Report Creation process in SAP ERP
  DEC-2018 T-code list related to MM module
  SEP-2018 Utilization of Vendor Bill Tracking (VBT) System
  AUG-2018 Process for entering services PR for commissioning of equipment for project
  AUG-2018 Material Receipt Recovery format “Annexure-I” 
  JUN-2018 Vendor Bill Tracking Manual for Vendor, Consignee, PV bill,  Finance
    Complete MM process cycle
  MAY-2018 Process of Consumption of Civil material for R&M works
  APR-2018 Final Closure of PO (for Monitoring of reason of pendency)
  NOV-2017 Various Movement types used in MIGO
  OCT-2017 Consumption of material at project for a period using MB51
  SEP-2017 Process of deletion of Service Entry sheet
  SEP-2017 Process to be performed through SAP system
  SEP-2017 Process for amendment in Service PO due to GST implementation
  SEP-2017 Process of searching and downloading the documents (manuals) in DMS System
  SEP-2017 Create PO with reference to RFQ
  AUG-2017 Process to know status of PO/contract
  AUG-2017 Process of final closing of PO/Contract in SAP system
  AUG-2017 GST related Format
  MAY-2017 Printing of PO from System
  MAY-2017 Create Complaint/notification against material and display complaint/notification
  MAY-2017 P&C Process for Complaint/notification against material
  FEB-2017 Generate RFQ after Bid creation
  JAN-2017 Tender /Bid process
  JAN-2017 Process of creation of material PR (Non-Project)
  JAN-2017 Indent creation process
  DEC-2016 Uploading Documents in Document Management System (DMS)
  NOV-2016 Process for cancel /force close indent
  NOV-2016 Process of removal of damaged material stock (deposited into ACOS) from own location
  NOV-2016 R&M Service PR process
  NOV-2016 Process to short close PO
  OCT-2017

Process for Consumption of material as an Asset
  OCT-2017

Process for knowing Reservation number for consumption of material at project.
  JUL-2017
GUIDELINES FOR TRANSFER/CONSUMPTION OF MATERIAL IN SAP SYSTEM
  JUL-2017
GUIDELINES FOR RECEIVING OF MATERIAL AGAINST D.I. FOR THE MONTH OF APRIL 2016 AND ONWARD IN SAP SYSTEM
  JUL-2017

GUIDELINES FOR ENTRY OF M.B. (SERVICE ENTRY SHEET) BY INDIVIDUAL OFFICE FOR MONTH OF APRIL 2016 ONWARD IN SAP SYSTEM
  JUL-2017 Transfer of material from one storage location to another storage location within same plant (TWC)
  JUL-2017 Transfer of material from one storage location to another storage location outside the plant (TOC)
  JUL-2017 Transfer of material from one storage location to project storage location within same plant (from A store to PS store)
  JUL-2017 Transfer of material from project storage location to project (from PS store to Project)