Order Reference |
Download
Link |
Order issued under Section 151 of the Electricity Act,2003 (Central Act No 36 of 2003) withdrawn dated 01.06.20004. |
JPR5-200 |
Revision in cost of meter box and meter security to be recovered from the consumers dated 31.05.20004. |
JPR5-199 |
Not insisting for giving certificate to the effect that there are No Outstanding dues of previous consumer in the premises where new connection has been applied for dated 25.05.20004. |
JPR5-198 |
Approval to authorize the officers of the company to lodge complaint in writing before the court on behalf of the company under the provision of Section 151 of the Electricity Act, 2003 dated 18.05.20004. |
JPR5-197 |
Approval to authorize the person to carry out the duties assigned under the provision of Section 163 of the Electricity Act,2003 dated 19.05.20004. |
JPR5-196 |
Prescribed norms for electrification of colonies developed by private builders and other agencies dated 19.05.20004. |
JPR5-195 |
Monthly reading of MIP consumers through CMRI dated 17.05.20004. |
JPR5-194 |
Recovery of difference of stamp duty in respect of agreement etc from consumers dated 15.05.20004. |
JPR5-193 |
Refund / adjustment of cost of energy Meter recovered in lieu of security dated 11.05.20004. |
JPR5-192 |
Revision in cost of meter box and meter security to be recovered from the consumers dated 07.05.20004. |
JPR5-191 |
Expeditious release of industrial connections to be released on supply voltage of 11 KV - Delegation of Powers thereof dated 07.05.20004. |
JPR5-190 |
Expeditious processing of Large HT category connections dated 07.05.20004. |
JPR5-189 |
Billing of Consumers if the connected load / contract demand is revised (increased or decreased ) in the middle of the month dated 01.05.20004. |
JPR5-188 |
Comprising / settlement charges to be recovered from a non Consumer under Agriculture category who is committing theft of electricity dated 28.04.20004. |
JPR5-187 |
Prescribing norms for electrification of colonies being developed by private builders & other agencies dated 28.04.20004. |
JPR5-186 |
To recover the amount of additional security deposit from the industrial consumers desiring extension in Connected load / contract demand dated 21.04.20004. |
JPR5-185 |
Issue of Notice for disconnection of connection of Defaulting consumers dated 21.04.20004. |
JPR5-184 |
Levy of Power factor surcharge /incentive , in light of Power Factor Clause of tariff for Supply of Electricity-2001 dated 21.04.20004. |
JPR5-183 |
Revision cost of Meter Box and Meter Security to be recovered from the consumers dated 21.04.20004. |
JPR5-182 |
Regarding recovery of line dismantling charges from large industrial consumers being permanently disconnected and recovery of cost of releasing of service line from consumers seeking reconnection after two months from the date of disconnection dated 21.04.20004. |
JPR5-181 |
Use of ISI mark HDPE Pipes for releasing new agriculture connections dated 21.04.20004. |
JPR5-180 |
Expediting release of connections under NDS LT-2 category for loads 20KW and above dated 21.04.20004. |
JPR5-179 |
Prescribing Norms for electrification of colonies to be developed by private builders and other agencies dated 17.04.20004. |
JPR5-178 |
Reiterationof the order no 88 dated 16.01.2004 (JPR5-152 ) in respect of release of connection in premises where outstanding dues of previous consumers are lying unliquidated and the assets of the previous consumer are auctioned by State Govt's Financial Institutions like RIICO/RFC and also by Official Liuidator appointed by Rajasthan High Court dated 13.04.20004. |
JPR5-177 |
Prescribing norms for electrification of colonies to be developed by private builders and other dated 12.04.20004. |
JPR5-176 |
Requirement of NOC of RIICO for releasing new connections under industrial & other categories dated 12.04.20004. |
JPR5-175 |
Public Notice under Rules 77,79, 80 & 82 of the Indian Electricity Rules, 1956 dated 17.03.20004. |
JPR5-174 |
Information about the Incharge of the office and Controlling officers under Rajasthan Right to Information Act-2000 dated 24.03.20004. |
JPR5-173 |
Deciding cut off date for calculation of interest on outstanding dues after disconnection fot the units where assets have been taken over by RFC/RIICO dated 23.03.20004. |
JPR5-172 |
Applicability of tariff for Hospitals / Dispensaries , run by Medical & Health Department, Governemnt of Rajasthan dated 11.03.20004. |
JPR5-171 |
Installation of GO swirches and Horn Gap fuses for Connections to be released on 11 KV and higher voltage dated 11.03.20004. |
JPR5-170 |
Maintenace of separate priority for applications requiring connections on higher voltages under category of large Industrial consumer dated 11.03.20004. |
JPR5-169 |
Release of connections fomestic/ Non-Domestic purposes in the premises where one industrial connection is already existing / new industrial connection has been applied for dated 11.03.20004. |
JPR5-168 |
Change of billing of category of recognised educational institutions from "Non-Domestic service (NDS/LT-2)" to "Bulk Supply for Mixed load(ML/LT-7)" dated 08.03.20004. |
JPR5-167 |
Use of HDPE pipe in agriculture pump sets dated 08.03.20004. |
JPR5-166 (Revised) |
Use of HDPE pipe in agriculture pump sets dated 08.03.20004. |
JPR5-166 |
Laying of Service line within the premises of the Industrial Consumers dated 27.02.20004. |
JPR5-165 |
Release of connections for Domestic/Non Domestic purposes in the premises where one industrial connection is already existing / new industrial connection has been applied for. dated 27.02.20004. |
JPR5-164 |
Expediting release of industrial connections by maintaing separate priority for connections requiring installation of new distribution transformers and others dated 27.02.20004. |
JPR5-163 |
Prescribing norms for electrification of colonies to be developed by private builders dated 27.02.20004. |
JPR5-162 |
Permission to the aggrieved person to bring along an advisor/ consultant in the settlement committees of the Nigam dated 23.02.20004. |
JPR5-161 |
Regarding non clearity of proceedings of meeting of settlement committee dated 12.02.20004. |
JPR5-160 |
Laying of LT/11KV lines in Industrial Areas dated 09.02.20004. |
JPR5-159 |
Incentive in tariff to Large industrial consumers- clarification in the existing scheme issued vide Order No JPD/DyCE(C)/SE(C)F.1(32)/D3013 dt12.12.2003 (JPR5-150) dated 07.02.20004. |
JPR5-158 |
Notification issued by the State Government interms of Power conferred under various provisions of Electricity Act-2003 dated 05.02.20004. |
JPR5-157 |
Rebate of 7.5 % to be allowed to consumer under Bulk Supply for Mixed Load (Schedule ML/LT -7) for supply on 11KV or above dated 29.01.20004. |
JPR5-156 |
Procedure for redressal of consumer grievance as per RERC's directions commuincated vide notification dt 3.11.2003 dated 28.01.20004. |
JPR5-155 |
Reconstitution of Corporate Level Settlement Committee of JVVNL dated 24.01.20004. |
JPR5-154 |
Obtaining signature of the consumer on Meter change Order (MCO) and issuing bills thereof dated 17.01.20004. |
JPR5-153 |
Release of connections in premises where outstanding dues of previous consumers are lying unliquidated and the assets of the previous consumers are auctioned by State Govt's Financial Institutions like RIICO/RFC and also by Official Liuidator appointed by Rajasthan High court dated 16.01.20004. |
JPR5-152 |
Rebate of 7.5% to be allowed to consumers under Bulk Supply for Mixed Load (Schedule ML/LT -7) for supply on 11 KV or above dated 09.01.20004. |
JPR5-151 |
Incentive in tariff to Large Industrial consumers modification in the existing scheme and the extension of the modified scheme for a further period of 3 year up to 31.3.2007 dated 12.12.2003. |
JPR5-150 |
Guidelines in pursuance of the Notification No.RERC/Secy/ Reg.15 dt 3.11.2003-procedure to be followed for redressal of consumers grievances dated 11.12.2003. |
JPR5-149 |
Approval for carrying out the electrification works and shifting of existing lines by Railways themselves dated 02.12.2003. |
JPR5-148 |
Refund of cost of energy meter and Meter Box recovered in lieu of security dated 24.11.2003. |
JPR5-147 |
Appeal and review in settlement cases decided by various Settlement Committees of the Nigam dated 29.10.2003. |
JPR5-146 |
Review of amount of Security Deposit from new consumers and recovery of additional security deposit thereof dated 28.10.2003. |
JPR5-145 |
Clarification in respect of billing of connections under Medium Industrial Service (Schedule MP/LT-6) dated 24.10.2003. |
JPR5-144 |
Permission for deposting cost of CTPT sets to avoid monthly rental charges by the consumers dated 24.10.2003. |
JPR5-143 |
Remedial measures to be taken by the field officers to avoid electrical accidents of the line , sub station etc dated 16.10.2003. |
JPR5-142 |
Accepting the meter boxes from the intending consumers under large industry and MIP categories dated 16.10.2003. |
JPR5-141 |
Interest free security deposit for lying of optical fibre baes Telecom network cables on electric poles (33 KV / 11 KV/ LT ) of jaipur Discom dated 07.10.2003. |
JPR5-140 |
Expediting the sanctions for load extension in the case of large industrial consumer pending in various Industrial Areas dated 25.09.2003. |
JPR5-139 |
Replacement of meters installed at EHV Sub station at the 33/11 KV feeders emanating from the Grid Sub Station for supply to industrial areas dated 25.09.2003. |
JPR5-138 |
Element of Electricity Duty included in the charges prescribed for various categories under "Compromising/settlemet charges scheme " for theft of electricity dated 25.09.2003. |
JPR5-137 |
To permit industrial consumers for lying of 33 kv/ 11 kv / LT lines for release of connections/extension of loads dated 15.09.2003. |
JPR5-136 |
Assessment to be made when Trivector meter ceases to dispaly readings dated 12.09.2003. |
JPR5-135 |
Dispensing with the facility of depositing 50% amount of transformer back-up charges in 12 equal monthly installment dated 10.09.2003. |
JPR5-134 |
Constitution of Auction Committee (s) dated 09.09.2003. |
JPR5-133 |
Levy of minimum billing amount in case of Permanentely Disconnectedd connection under Seasonal Industrial category dated 08.09.2003. |
JPR5-132 |
Refund of cost of enery meter and meter box recoverd in lieu of security dated 29.08.2003. |
JPR5-131 |
Adjustment of back up transormer charges in the case of permanently disconnected consumers dated 22.08.2003. |
JPR5-130 |
"Amnesty Schemes" for Domestic, Non Domestic, Agriculture and Industrial consumers, Municipalities, Local Bodies and Govt. Departments - for realisation of outstanding dues thereof dated 14.08.2003. |
JPR5-129 |
Extension of line beyond RIICO Industrial Area for release of connections outside RIICO's Industrial Area dated 11.08.2003. |
JPR5-128 |
Advise to field officers to record meter reading first and then disconnect the connection dated 30.07.2003. |
JPR5-127 |
Compliance of the directions of Raj. State Pollution Control oard to disconnect the electric supply for consumers for non compliance of Section 31(A) of Air Act-1981 & Section 33 (A) Water (Prevention and Control of Pollution) Act-1974 dated 24.07.2003. |
JPR5-126 |
Charging the cost of Bay & Allied Equipments at GSS of TRANSCO for giving supply through feeder emanating from GSS dated 18.07.2003. |
JPR5-125 |
Laying of separated feeder for Industrial & Non- domestic connections situated in Rural Area(s) for connecting them from continuous supply feeders dated 18.07.2003. |
JPR5-124 |
Amendment in the "Tariff for Supply of Electricity-2001"dated 16.07.2003. |
JPR5-123 |
"Amnesty Schemes" for Domestic, Non Domestic, Agriculture and Industrial consumers, Municipalities, Local Bodies and Govt. Departments - for realisation of outstanding dues thereof dated 05.07.2003. |
JPR5-122 |
Levy of transformation losses from the consumers to whom connection were released prior to 7-8-90 under Medium Industrial category and subsequently converted to large industrial category vide order no Comml-294 dated 14.07.2003. |
JPR5-121 |
Monthly reading of H.T. consumers for billing purpose dated 05.07.2003. |
JPR5-120 |
Delegation of power for shifting and releasing of PHED connections dated 02.07.2003. |
JPR5-119 |
"Amnesty Schemes" for realisation of outstanding dues from Municipalities Local Bodies & Govt Department dated 09.06.2003. |
JPR5-118 |
"Amnesty Schemes" for industrial category of consumers for revival of indutries- realisation of outstanding dues thereof dated 09.06.2003. |
JPR5-117 |
Relaxation plan for recovery of due amounts from domestic, non-domestic and agriculture consumers dated 09.06.2003. |
JPR5-116 |
Incentive in tariff to Large Industrial consumers dated 19.05.2003. |
JPR5-115 |
Replacement of worn out / damaged service line (PVC tapping) dated 19.05.2003. |
JPR5-114 |
Prompt recovery of outstanding dues from defaulter consumers-actions warranted thereof dated 17.05.2003. |
JPR5-113 |
To permit private Housing Socities/Developers to lay electrical Infrastructure themselves in the colonies developed by them dated 13.05.2003. |
JPR5-112 |
Incentive in tariff to large Industrial consumers dated 28.04.2003. |
JPR5-111 |
To permit private Housing Societies/ Developers to lay Electrical Infrastructure themselves in the colonies developed by them dated 28.04.2003. |
JPR5-110 |
Procedural guidelines for disposing of assets dated 25.02.2003. |
JPR5-109 |
Rebate of 7.5 % to be allowed to consumer under Bulk Suplly for Mixed load (Schedule ML/LT -7) for supply on 11 KV or above dated 20.02.2003. |
JPR5-108 |
Bill collection on the basis of actual uses of electricity from agriculture consumer due to awful drought and famine dated 17.02.2003. |
JPR5-107 |
Levy of transformation losses from the Consumers under Medium Indutrial Category to whom connections were released prior to 7.8.90 dated 14.02.2003. |
JPR5-106 |
Restoration/ conversion of connections from Non-Domestic sevice where connections were originally released under domestic category and subsequently converted to Non-Domestic category and vice versa dated 10.02.2003. |
JPR5-105 |
Implementation of directions given by RERC dated 04.02.2003. |
JPR5-104 |
Clarification in respect of billing of connection under Medium INdustrial Service (Schedule MP/LT-6) dated 28.01.2003. |
JPR5-103 |
Clarification in respect of billing of connections under Medium Industrial Services (Schedule MP/LT-6) dated 13.01.2003. |
JPR5-102 |
Refund of excess cash security deposit to industrial consumers dated 06.01.2003. |
JPR5-101 |
Amendment in the scheme for settlement of cases of theft of energy & malicious interfaces with the metering equipment in lieu of cash compensation dated 19.12.2002. |
JPR5-100 |
Levy of transformer rent as well as transormation losses from the consumer having sanctioned connected load above 60 HP and contract demand more than 50KVA with supply on LT and to whom connections were released prior to 7-8-90 dated 10.12.2002. |
JPR5-99 |
Action Plan for monitoring of the implementation of disconnection orders (DCO's ) & Checking of Permanently Disconnected connections dated 20.11.2002. |
JPR5-98 |
Clarification : Procedure to be followed for release on new connection/recovery of outstanding dues of previous consumer in cases where sick industry is auctioned by State Government's Financial Institution like RIICO/RFC dated 08.11.2002. |
JPR5-97 |
Reference points to facilitate and help understanding the process of recovery under EUDR & LR Act dated 08.11.2002. |
JPR5-96 |
Procedure to be followed for release of new connection/ recovery of outstanding dues of previous consumer in cases where sick industry is auctioned by State Government's Financial Institutions like RIICO/RFC dated 28.10.2002. |
JPR5-95 |
Concessional charges for releasing connection under domestic category in Rural areas and Kachchi Basti(Urban Area) dated 24.10.2002. |
JPR5-94 |
Relaxation in recovery of due amounts due to drought dated 24.10.2002. |
JPR5-93 |
Constitution of Auction Committee dated 23.10.2002. |
JPR5-92 |
Constitution of Attachment Committee at Circle Level dated 23.10.2002. |
JPR5-91 |
Refund of balance amount of security deposit dated 22.10.2002. |
JPR5-90 |
Procedures ot be followed in case of dishonour of cheque of any consumer dated 19.10.2002. |
JPR5-89 |
Rationalisation/fixing uniform rates of rent of 11/.4 KV transformer and D.P.dated 18.010.2002. |
JPR5-88 |
Disconnection in respect of Large Industrial consumer having contract demand above 5MVA -DOP thereof dated 01.010.2002. |
JPR5-87 |
Taking over of well connection temporarily on rent by PHED dated 23.09.2002. |
JPR5-86 |
Applicability of tariff on "Old Peoples' Homes" like "Mother Terrasa Home" etc dated 29.09.2002. |
JPR5-85 |
Deciding the cases expeditiously registered with various level settlement committee dated 19.09.2002. |
JPR5-84 |
Taking over of well connection temporarily on rent by PHED dated 10.09.2002. |
JPR5-83 |
Levy of overhead charges in preparing estimates of MPs/MLAs/BADP aided development work dated 29.08.2002. |
JPR5-82 |
Laying of optical fibre cables (OFC) for Telecom N/W & coaxial T.V. cables on electric poles (33KV/11KV/LT ) of jaipur Discom (Pole Rental charges and interest free security deposit) dated 29.08.2002. |
JPR5-81 |
Grant of Stay and recovery of 50% of the amount assessed in theft of energy cases dated 28.08.2002. |
JPR5-80 |
Installation of transformer sub station required for release of new connections shifting of various categories of connections dated 12.08.2002. |
JPR5-79 |
Billing of NDS consumer whose maximum demand has exceeded 50KVA but who have not stipulated their contract demand dated 03.08.2002. |
JPR5-78 |
Exemption of security deposit from employees of erstwhile RSEB now employees of anyone of the five companies formed consequent to unbundling of erstwhile RSEB dated 22.07.2002. |
JPR5-77 |
Reconstitution of Corporate level Settlement Committee of JVVNL thereof dated 15.07.2002. |
JPR5-76 |
"Amnesty Scheme" for Domestic, Non Domestic, Agriculture and Industrial consumers, Municipalities, Local Bodies and Govt. Departments - for realisation of outstanding dues thereof dated 29.06.2002. |
JPR5-75 |
"Amnesty Scheme" for Domestic, Non Domestic, Agriculture and Industrial consumers, Municipalities, Local Bodies and Govt. Departments - for realisation of outstanding dues thereof dated 15.06.2002. |
JPR5-74 |
"Amnesty Scheme" for Domestic, Non Domestic, Agriculture and Industrial consumers, Municipalities, Local Bodies and Govt. Departments - for realisation of outstanding dues thereof dated 31.05.2002. |
JPR5-73 |
Deposit of cash security by Large Industrial Consumers dated 30.05.2002. |
JPR5-72 |
Relaxation in extra charges levied on compunding charges from 4% to 2% dated 22.05.2002. |
JPR5-71 |
Prescribing modalities for supply power on 11 kv voltage to LT-MIP consumers in cases where maximum demand exceed 50KVA dated 13.05.2002. |
JPR5-70 |
Amendment in the "Tariff for supply of electricity-2001" dated 10.05.2002. |
JPR5-69 |
"Amnesty Scheme" for realisation of outstanding dues from municipalities local bodies & govt department dated 04.05.2002. |
JPR5-68 |
"Amnesty Scheme" for industrial category of consumers for revival of industries- realisation of outstanding dues thereof . |
JPR5-67 |
"Amnesty Scheme" for realistaion of outstanding dues of domestic , non domestic and agriculture connections |
JPR5-66 |
Requirement of "No Objection Certificate" from RIICO for releasing new conncetions under industrial and other categories dated 02.05.2002 |
JPR5-65 |
Amendment in the "Tariff for the Supply of Electricity-2001"dated 11.04.2002 |
JPR5-64 |
Approval for carrying out the elecrification work and shifting of existing lines by Local Bodies/RIICO/ RUIDP dated 05.04.2002 |
JPR5-63 |
Laying of optical fibre based telecom n/w cables & coaxial TV cables on electric poles(33KV/11 KV /LT) of jaipur Discom. Fixing of pole rental charges & ineterest free security amount dated 23.03.2002 |
JPR5-62 |
Order to issue DCOs timely and implemented within 3 days of its issuance dated18.03.2002 |
JPR5-61 |
Laying of optical fibre based telecom n/w cables & coaxial TV cables on electric poles(33KV/11 KV /LT) of jaipur Discom. Fixing of pole rental charges & ineterest free security amount dated12.02.2002 |
JPR5-60 |
Antidated/over riding priority for releasing agriculture connections to physically handicapped persons dated 07.02.2002 |
JPR5-59 |
Corrigendum : Sharing the cost of shifting of existing electric lines dated 04.02.2002 |
JPR5-58 |
Sharing the cost of shifting of existing electric lines dated 24.01.2002 |
JPR5-57 |
Approval for carring out the electrification work and shifting of existing lines by the local bodies themselves dated 24.01.2002 |
JPR5-56 |
Release of new pumping sets agriculture connections in urban/rural areas dated15.01.2002 |
JPR5-55 |
Antidated/over riding priority for releasing agriculture connections to physical handicapped persons dated 08.01.2002 |
JPR5-54 |
Review of amount of security deposite from new consumer and recovery of enhanced security deposit thereof dated 20.12.2001 |
JPR5-53 |
Office order to resolve the disputes of the consumers dated 04.12.2001 |
JPR5-52 |
Switching over to monthly billing sysytem from bi-monthly billing system in case of consumers having sanctioned connected load above 25 HP (18.75) under Domestic, Non Domestic and Mixed Load categories dated 04.12.2001 |
JPR5-51 |
Rationalisation/fixing uniform rates of rents 11/.4 KV transormer to be recovered from consumer dated 20.11.2001 |
JPR5-50 |
Over riding priority for releasing connection in various categories other than agriculture dated 19.11.2001 |
JPR5-49 |
Refund of amount of security deposit in case of temporary connections dated 05.11.2001 |
JPR5-48 |
Removing meter and service lines after two months from the date of disconnection clause-30 (iii) of General condition of supply dated 05.11.2001 |
JPR5-47 |
Amendment in the "Tariff for supply of Electricity 2001" dated 27.10.2001 |
JPR5-46 |
Clarification in respect of applicability of the provision of order no comml -449 & JPR5-14 in cases of schools,dharamshalas and Godowns dated 19.10.2001 |
JPR5-45 |
Guidelines for applicability of domestic tariff for energy consumed in residential houses for commercial/industrial activity by the members of the family dated 04.10.2001 |
JPR5-44 |
"Amnesty Scheme" for realisation of outstanding dues from municipalities local bodies and govt. department dated 29.09.2001 |
JPR5-43 |
"Amnesty Scheme" for industrial category of consumers for revival of industries-realisation of outstanding dues thereof dated 29.09.2001 |
JPR5-42 |
Power cut/ restrictions in respect of HT consumers dated 28.09.2001 |
JPR5-41 |
Delegation of Powers dated 28.09.2001 |
JPR5-40 |
Withdrawal of order regarding revision in "reconnection fees" dated 15.09.2001 |
JPR5-39 |
Release of new connections for street lighting to local bodies/Govt. Departments dated 15.09.2001 |
JPR5-38 |
Instruction of billing dated 10.09.2001 |
JPR5-37 |
Billing of LT Medium Industrial consumers whose maximum demand increases to more than 50KVA-switching over to HT supply dated 10.09.2001 |
JPR5-36 |
Revision in "Reconnection fees" prescribed under miscellaneous charges in the general condition of supply dated 31.08.2001 |
JPR5-35 |
"Amnesty Scheme" for realisation of outstanding dues from municipalities local bodies and govt. department dated 23.08.2001 |
JPR5-34 |
"Amnesty Scheme" for industrial category of consumers for revival of industries-realisation of outstanding dues thereof dated 23.08.2001 |
JPR5-33 |
Cost of Meter Boxes dated17.07.2001 |
JPR5-32 |
Concession scheme for recovery of due amounts from domestic, non domestic and agriculture consumers dated 16.07.2001 |
JPR5-31 |
Scheme for settlement of cases of theft of energy and malicious interference with the metering equipments in lieu of cash compensation-Rivision of charges thereof dated 11.07.2001 |
JPR5-30 |
Corrigendum to "Tariff for supply of Electricity-2001" Booklet dated 11.07.2001 |
JPR5-29 |
Release of domestic / non domestic connections in urban & rural areas-preparation of estimates dated 10.07.2001 |
JPR5-28 |
Concession scheme for recovery of due amounts from domestic, non domestic and agriculture consumers dated 08.06.2001 |
JPR5-27 |
Extension in due dates upto 6th June,2001 of the energy bills for billing month of May,2001 in respect of SIP, MIP & Large Industrial Consumers dated 06.06.2001 |
JPR5-26 |
Adjustment of payment received from consumers-fixing priority thereof dated 16.05.2001 |
JPR5-25 |
Enhancement of financial powers of various level settlement committees for redressal of consumers' disputes/grievance dated 15.05.2001 |
JPR5-24 |
Office order regarding connections under rural domestic category released without meters should be provided with meters by 31st August 2001 dated 07.05.2001 |
JPR5-23 |
Recovery of amount of enhanced security deposit and arrears of fuel surcharge as per final rate for the year 1999-2000levied vide corporation's order no 186 dt 12-2-2001 from the consumers- clarification thereof dated 02.05.2001 |
JPR5-22 |
Providing Jaipur Discoms' distribution transformer on retail basis to consumers of all categories dated 28.04.2001 |
JPR5-21 |
Amendment in clause 29.3 (b) of "General condition of Supply & Misc. charges relating to supply of electricity" dated 26.04.2001 |
JPR5-20 |
Amendment in clause 20 (d) of "General condition of Supply & Misc. charges relating to supply of electricity" dated 18.04.2001 |
JPR5-19 |
Amendment in clause 19 (d) (vii) (1) of "General condition of Supply & Misc. charges relating to supply of electricity" dated 17.04.2001 |
JPR5-18 |
Releasing of domestic connections in rural areas dated 13.04.2001 |
JPR5-17 |
Option for deposting the amount of demand notice with the bank dated 11.04.2001 |
JPR5-16 |
Concession package to be allowed forrevival of industries disconnected during 1-3-98 to 31-3-2000 dated 11.04.2001 |
JPR5-15 |
Simplification of procedure for release of Domestic/Non Domestic connection to Multi storey /complexes/buildingssnd large buildings-Modification therefore dated 10.04.2001 |
JPR5-14 |
Fatal accident of Public man or animals due to electrocution from electric lines and poles of discoms dated 02.03.2001 |
JPR5-13 |
Deposite of cash security by various categories of industrial consumer dated 23.02.2001 |
JPR5-12 |
Rate od fuel surcharge for the year 1999-2001dated 12.02.2001 |
JPR5-11 |
Deposite of cash security by various categories of industrial consumer dated 06.01.2001 |
JPR5-10 |
Disconnection Connection without issuing seven days notice required under the provision of Section-24(i) of the Indian Electricity Act dated 05.01.2001 |
JPR5-09 |
Deposit of cash security by various categories of industrial consumers.This order date 23.12.2000 |
JPR5-08 |
Recovery of enhanced/ additional security from industrial consumers dated 23.11.2000 |
JPR5-07 |
Minimum charge recovery from agriculture meter supplied consumers dated 16.09.2000 |
JPR5-06 |
Recovery of Security Deposit from State/ Central Govt. Deptts/ Undertakings dated 31.08.2000 |
JPR5-05 |
Corporation Level Settlement Comittee dated 31.08.2000 |
JPR5-04 |
Recovery in monthly installment of increased amount from agriculture consumers dated 09.08.2000 |
JPR5-03 |
Recovery in monthly installment of increased amount from domestic consumers dated 09.08.2000 |
JPR5-02 |
Final rate of fuel surcharge for the year 1998-1999 dated 07.08.2000 |
JPR5-01 |