(1)
|
Location
|
At Chowki Motipura about 22 Km from Chabbra Town in Baran District of Rajasthan. The site lies between- North Latitudes 24 degree 24 inches and East Longitude 77 Degree 03 inches.
|
(2)
|
Nearest Railway Station
|
Motipura Chowki ( Between Beena- Kota Section)
|
(3)
|
Installed Capacity
|
2X660 MW Stage-II, Phase- III
|
(4)
|
Estimated Cost
|
7920 Crores Rs.
|
(5)
|
Land Acquired
|
2361 Bigha (597.43 Hec.)
|
(6)
|
Height of Chimney
|
275 Meter (Twin Flue)
|
(7)
|
ESP Efficiency
|
99.89%
|
(8)
|
Fuel Requirement
|
Coa l- 6.5 MTPA
|
Unit # 5 - Parsa East & Kante Basan Coal Block
|
Unit # 6 - Kante Basan Extension Coal Block.
|
HSD/FO - 11563 KL/Year (for both units)
|
(9)
|
Water Requirement
|
1570 MCFT/ YEAR
|
Lhasi Irrigation Project- 300MCFT
|
Parvan Irrigation Project- 1270 MCFT
|
(10)
|
COD
|
Unit#5 - 09.08.2018
|
Unit#6 - 02.04.2019
|