Commercial Circulars 933 onward

S.No. Order Reference Download Link
  Reconstitution of Appellate authority JPR5-1078, 21.10.21
  Regarding to maintain ground clearance of the lowest conductor of overhead lines in the cases of uplifting of road level by various agencies JPR5-1077, 06.10.21
  Corrigendum order in respect to JPR51073, dt. 21.09.21 JPR5-1076, 29.09.21
  Regarding action to be taken in relation to vigilance inquiry of case related to electricity theft and misuse of electricity JPR5-1075, 25.09.21
  Amnesty scheme for connected/disconnected consumers of domestic and agriculture category for realization of outstanding dues JPR5-1074, 25.09.21
  Detailed guidelines and procedure regarding Grid Interactive Distributed Renewable Energy genearting systems JPR5-1073, 21.09.21
  For installation of LT Shunt Capacitor at new agriculture connection.   JPR5-1072, 17.09.21
  Replacement of 25 KVA burnt single phase distribution transformers  JPR5-1071, 09.09.21
  Directions for load up-gradation for existing towers and facility sites of M/s Reliance Jio in urban areas  JPR5-1070, 18.08.21
  Release of temporary connections through Pre-paid meters JPR5-1069, 12.08.21
  Recovery of Fuel Surcharge amount for Fourth Quarter of FY-2020-21.

JPR5-1068, 06.08.21

Auditors Report

FSA Calculation Sheet

  लॉकडाउन के कारण वीसीआर के प्रकरणों की राजस्व निर्धारण पुनरीक्षण समिति के समक्ष सुनवाई हेतु अवधि बढ़ाने के सम्बन्ध में। JPR5-1067, 06.08.21
  Relaxation for re-connection of HT/EHT consumers disconnected prior to issue of RERC Regulations, 2021 JPR5-1066, 27.07.21
  Regarding online applications as per "Terms and conditions for supply of Electricity- 2021 JPR5-1065, 23.07.21
  Regarding delegation of power of CA(HQ)  JPR5-1064, 12.07.21
  Installation of Oil type transformers in Residential/ Commercial buildings and their testing in Nigam's Central Testing Laboratory (CTL) prior to installation.  JPR5-1063, 12.07.21
  Regarding extension of date for depositing demand note amount due to Lockdown JPR5-1062, 08.06.21
  “Procedure for Redressal of Consumer Grievance” JPR5-1061, 08.06.21
  Installation of Dry/Oil type transformers in Residential/ Commercial building and their testing in Nigam's Central Testing Laboratory (CTL) prior to installation JPR5-1060, 04.06.21
  Standards of Performance-2021 JPR5-1059, 17.05.21
  Augmentation of Distribution Transformers JPR5-1058, 11.05.21
  Compliance of TCOS- 2021 JPR5-1057, 05.05.21
  Recovery of Fuel surcharge amount for third quarter of FY 2020-21

JPR5-1056, 23.03.2021

Auditors Report

FSA Note Rajasthan Q3

  Clarification regarding removal of isolator switch prior to metering cubical JPR5-1055, 15.03.2021
  Conductor for 11 KV overhead lines JPR5-1054, 12.03.2021
  Terms and conditions for Supply of Electricity- 2021  JPR5-1053, 27.02.2021
  Recovery of Fuel surcharge amount for second quarter of FY 2020-21

JPR5-1052, 26.02.2021

FSA Calculation

Auditors Report 

  Regarding removal of Isolator switch prior to metering cubical.  JPR5-1051. 18.02.2021
  Regarding to provide additional metering at the premises of HT supply consumers for power factor purpose. JPR5-1050, 17.02.2021
  Clarification in relation to the proceedings to be taken in connection with vigilance investigation cases related to power theft JPR5-1049, 15.02.2021
  Mode of Payment for electricity bills and other heads JPR5-1048, 12.02.2021
  Order in continuation to  guidelines issued via. JPR5-1045 JPR5-1047, 08.02.2021
  Application for new electricity connection through online system  JPR5-1046, 28.01.2021
  Action to be taken in connection with vigilance investigation cases related to power theft JPR5-1045, 27.01.2021
  Registration of the generating unit or station in the registry maintained by CEA regulations JPR5-1044, 19.01.2021
  Timeline for connection under Net Metering Regulation JPR5-1043, 13.01.2021
  Direction in the cases of unauthorised use of electricity JPR5-1042, 30.12.2020
  Recovery of Fuel Surcharge amount for first qaurter of FY 2020-21

JPR5-1041, 26.11.2020

Audit Report

Quarter 1 FSA Calculation Sheet

  Regarding the temporary tariff on electrical connections for collective decoration on Diwali 2020 in Jaipur city JPR5-1040, 09.11.2020
  Regarding ground clearance of the lowest conductor of overhead lines JPR5-1039, 28.09.2020
  Peak hours for banked solar/ Wind energy as per Rajasthan Solar energy policy 2019 & Rajasthan wind & hybrid Energy policy 2019 JPR5-1038, 08.09.2020
  Regarding providing service line for electricity connections by the Nigam JPR5-1037, 02.09.20
  Replacement of burnt single phase distribution Transformer JPR5-1036, 02.09.20
  Release of new connection/load extension/reduction of industrial / NDS/ DS connection JPR5-1035, 02.09.20
  Regarding verification of hazardous lines and shifting thereof JPR5-1034, 31.08.20
  Recovery of fuel surcharge amount for fourth quarter of FY 2019-20

JPR5-1033, 25.08.20

Auditor's Report

Calculation Sheet

  Regarding change of category before completion of one year from date of release of connection JPR5-1032, 04.08.2020 
  Reconstitution of Appellate Authority JPR5-1031 date 23.07.2020 (228 KB)
  Procedure for release of connection to individual shopkeepers in Krishi upajmandi premises JPR5-1030 date 21.07.2020 (213 KB)
  Amendment in detailed guidelines & procedure for net metering and Grid connectivity of grid connected rooftop & small solar photovoltaic systems JPR5-1029 date 08.05.2020 (326 KB)
  Guidelines regarding Energy bills for the month of April & May 2020 JPR5- 1028 date 16.04.2020 (777 KB)
  Order regarding Amnesty Scheme for disconnected consumers of domestic & agriculture categories (disconnected upto or prior to 31.03.2019) for realization of outstanding dues JPR-1027 date 03.04.2020 (608 KB)
  TARIFF FOR SUPPLY OF ELECTRICITY-2020 JPR5-1026 date 17.02.2020 (721 KB)
  Regarding the extension of the period of the voluntary load increase declaration scheme of unauthorized increased load of agricultural connections. JPR5-1025 date 27.01.2020 (218 KB)
  Partial Amendment in Order regarding Amnesty Scheme for disconnected consumers of all categories (disconnected upto or prior to 31.03.2019) for realization of outstanding dues JPR5-1024 date 27.01.2020 (332 KB)
  Reconnection of connections disconnected consequent upon vigilance checking JPR5-1023 date 07.01.2020 (561 KB)
  Simplified scheme to deposit pending bills for agriculture consumers is extended up to 31.01.2020 JPR5-1022 date 31.12.2019 (213 KB)
  Partial modification in Amnesty Scheme for disconnected consumers of all categories (disconnected upto or prior to 31.03.2019) for realization of outstanding dues JPR5-1021 date 17.12.19 (520 KB)
  Regarding simplified scheme to deposit pending bills for agriculture consumers  JPR5-1020 date 05.12.2019 (274 KB)
  Amnesty Scheme for disconnected consumers of all categories (disconnected upto or prior to 31.03.2019) for realization of outstanding dues JPR5-1019 date 04.12.2019 (878 KB)
  Regarding the extension of the period of the voluntary load increase declaration scheme of unauthorized increased load of agricultural connections. JPR5-1018 date 03.12.2019 (208 KB)
  Recovery of Fuel Surcharge amount for third quarter of the FY-2019-20

JPR5-1017 date 02.12.2019 (272 KB)

Calculation Sheet

  Terms and Conditions for Supply of Electricity - 2004 (Amended upto December 2017) JPR5-1016 date 26.11.2019 (511 KB)
  Regarding proceedings in cases of tampering with the electrical system of the Discom JPR5-1015 date 06.11.2019 (194 KB)
  Use of Thresher and Chaff Cutting Machine from agriculture connection. JPR5-1014 date 31.10.2019 (182 KB)
  Replacement of defective/ stopped meters. JPR5-1013 date 24.10.2019 (160 KB)
  Guidelines for replacement of Burnt/Defective Transformer. JPR5-1012 date 24.10.2019 (200 KB)
  Regarding the tariff rate on temporary electrical connections for mass decoration on Deepavali 2019 in Jaipur City. JPR5-1011 date 22.10.2019 (189 KB)
  Levy of Electricity Duty on consumption of self generated energy for any purpose in respect of energy generated by captive power generating plants other than Diesel Generating Sets.  JPR5-1010 date 16.10.2019 (250 KB)
  Calculation of estimated designed demand for electrification in case of Farm Houses. JPR5-1009 date 18.09.2019 (263 KB)
  Recovery of Fuel Surcharge amount for second quarter of the FY-2019-20

JPR5-1008 date 17.09.2019 (255 KB)

Calculation Sheet

  Installation of Dry/ Oil Type Transformers in Residential/Commercial buildings. JPR5-1007 date 11.09.2019 (238 KB)
  Regarding applying of "Voluntary Load Increment Declaration Scheme" of unauthorized increased load of agriculture connection JPR5-1006 date 02.09.2019 (297 KB)
  Recovery of Fuel Surcharge amount for second quarter of the FY-2019-20 JPR5-1005 date 02.09.2019 (251 KB)
  Recovery of Special Fuel Surcharge amount JPR5-1004 date 28.08.2019 (305 KB)
  Providing DO fuse link/horn Gap Fuse Set on transformers for protection JPR5-1003 date 28.08.2019 (211 KB)
  To consider third party testing of transformer. JPR5-1002 date 27.08.2019 (454 KB)
  Exemption of Electricity Duty from Solar Power for captive use as per notification dated 10.07.2019 JPR5-1001 date 24.07.2019 (192 KB)
  Regarding electrification of colonies/township developed by local authorities JPR5-1000 date 19.07.2019 (312 KB)
  Relaxation regarding payment of electricity bills through online/digital mode. JPR5-999 date 04.07.2019 (200 KB)
  Detailed Guidelines & Procedure for Net Metering and Grid Connectivity of Grid Connected Rooftop and Small Solar Photovoltaic Systems JPR5-998 date 04.07.2019 (326 KB)
  Regarding procedure of settlement of solar and wind energy from captive solar & wind plant in Rajasthan under open access JPR5-997 date 25.06.2019 (578 KB)
  Amendment in detailed guidelines & procedure for net metering and grid connectivity of grid connected rooftops and small solar photovoltaic system JPR5-996 date 25.06.2019 (331 KB)
  Recovery of fuel surcharge amount for first quarter of FY 2019-20

JPR5-995 date 24.06.2019 (201 KB)

FSA Note-I 

  Regarding charging the cost of constructin/erection of 33 KV line for providing construction power to new EHV sub-station of RVPNL JPR5-994 date 18.06.2019 (221 KB)
  Directions regarding self finance scheme JPR5-993 date 10.06.2019 (471 KB)
  Administrative approval for 33 KV works. JPR5-992 date 23.05.2019 (212 KB)
  Direction regarding notification of planned outages JPR5- 991 date 13.5.2019 (149 KB)
  Application through New Connection Management System (NCMS) module

JPR5- 990 date 13.5.2019 (156 KB)
  Direction for release and load extension of Industrial/ NDS connections upto 33 KV voltage level JPR5- 989 date 16.4.2019 (182 KB)
  Application through New Connection Management System (NCMS) module JPR5-988 date 16.04.19 (224 KB)
  Regarding recovery of Supervision charges under Deposit works of NHAI in which supervision is to be carried out by Discom JPR5-987 date 15.04.19 (158 KB)
  Charging for unauthorized Street light points from Municipalities/ Local bodies JPR5-986 date 15.04.19 (179 KB)
  Recovery of Fuel Surcharge amount for Fourth Quarter of FY 2018-19

JPR5-985 date 12.03.2019 (188 KB)

FSA Note (381 KB)

  Regarding timeline for issuing NOC and Testing of meter for connection under Net Metering Regulation JPR5-984 date 06.03.2019 (184 KB)
  Regarding New connection applications through NCMS & SWCS

JPR5-983

date 01.02.19

  Maintaining separate priority for applications received through BIJLI MITRA App for new domestic connections under 'Discom Aapke Dwar Yojna'.

JPR5-982

date 23.01.19

  Recovery of fuel surcharge amount for third quarter of FY 2018-19

JPR5-981

date 22.01.19

  Relaxation regarding payment of electricity bills through online/digital mode

JPR5-980

date 09.01.19

  Extension of period of various schemes

JPR5-979

date 31.12.18

  Guidelines regarding changing of Burnt Transformers 

JPR5-978

date 21.12.18

  Clarification regarding Computation of amount of exemption of Electricty Duty Clause 10.6.1 of RIPS-2014

JPR5-977

date 30.11.18

  Application fee for domestic connection

JPR5-976

date 27.11.18

  Tariff rates for Deepawali lightings in Jaipur City Circle

JPR5-975

date 31.10.18

  Recovery of fuel surcharges amount for second quarter of FY 2018-19

JPR5-974

FSA Calculation Sheet

  Extension of period of various schemes JPR5-973
  Payment of Electricity Bill through Online/Digital mode JPR5-972
  Terms and condition for Supply of Electricity- 2004 (Amended upto Dec 2017) JPR5-971
  Amendment in Rajasthan Electricity (Duty) Act, 1962 JPR5-970
  Preparation of cost estimates, overhead/supervision charges for deposit/ capital works and works supervised by Nigam JPR5-969
  Extension of period of various schemes JPR5-968
  Regarding Electrical rates applicable to the hostels

JPR5-967

Clarification

  Regarding Extension of period of various schemes JPR5-966
  Regarding payment of electricity bills through Online/ Digital mode JPR5-965
  Norms for electricity connections in Un-electrified areas JPR5-964
  Extension of "Amnesty Scheme" for  disconnected consumers of all categories and regular/disconnected consumer of  Domestic and Agriculture category and Government connections up to 31.07.2018 JPR5-963
  Payment of Electricity Bills through Online/Digital Mode JPR5-962
  Regarding Extension of voluntary load increment scheme and pending VCRs of Agriculture consumers JPR5-961
  Verification of Commercial/Residential complexes JPR5-960
  Maintaining separate priority for electrified and un-electrified colonies JPR5-959
  Extension of the period for disposal of pending VCR JPR5-958
  Procedure for release of connection to individual shop-keepers  in Krishi Upaj Mandi Premises. JPR5-957
  Tariff for supply of Electricity-2018 JPR5-956
  Payment of HT (LIP) Bills through online/digital mode JPR5-955
  Release/load Extension of industrial connection in prescribed time limit JPR5-954
  Electricity connections in Un-elctrified areas JPR5-953
  Campaign for releasing Pending Connections in Urban Area JPR5-952
  Regarding voluntary load increment scheme and pending VCRs of Agriculture consumers JPR5-951
  Time Period Extension for  Voluntary Load increment and category Change schemes JPR5-950
  Regarding self certification of installation JPR5-949
  Extension of "Amnesty Scheme" for  disconnected consumers of all categories and regular/disconnected consumer of  Domestic and Agriculture category and Government connections up to 30.06.2018 JPR5-948
  Disposal of pending VCRs JPR5-947
  Urban Cess in RIICO Industrial areas situated in Municipal area. JPR5-946
  Extension of the period for Disposal of pending VCRs JPR5-945
  "Amnesty Scheme" for disconnected consumers of all categories and regular / disconnected consumers of Domestic and Agriculture category Government connections. 

JPR5-944

  Regarding Voluntary Load increment and category Change schemes

JPR5-943

  Recovery of fuel surcharge amount for Fourth Quarter of FY 2018-19

JPR5-942

  Regarding providing of single phase connection to NDS and SIP category in scattered area upto 10 KW sanctioned/connected load

JPR5-941

  Regarding to consider the cases at the Consumer grievance Redressel Cum settlement Forum

JPR5-940

  Regarding disposal of excess domestic consumption in Electricity Bills

JPR5-939

  Regarding electrification of Colonies/township developed by local authorities

JPR5-938

  Regarding providing of single phase connections to NDS and SIP category in scattered area upto 10 KW sanctioned/connected load

JPR5-937

  Guidelines regarding releasing Agriculture connections

JPR5-936

  "Amnesty Scheme" for regular / disconnected consumers of Domestic and Agriculture category and Government connections for realization of outstanding dues

JPR5-935

  Regarding voluntary load increment scheme and pending VCRs of Agriculture consumers

JPR5-934

  Regarding voluntary load increment and category change schemes

JPR5-933