Circular description/Subject
|
Date |
Link for Document |
Size of Document |
Language of Document |
Regarding non requirement of electrical inspector/self certification of installation in caser ofincrease/decrease of load/demand |
04/07/2017 |
COMML.JDP/ 800 |
53 KB |
English |
ग्रामीण घेर आबादी क्षेत्र में घरेलू कनैक्शन दिये जाने के संबंध में |
30/06/2017 |
COMML.JDP/ 799 |
36.1 KB |
Hindi |
विद्युत कनैक्शन जारी करने के संबंध में दिशा निर्देश |
30/06/2017 |
COMML.JDP/ 798 |
47.5 KB |
Hindi |
Clarification of term "Occupier" |
07/06/2017 |
COMML.JDP/ 797 |
55.1 KB |
English |
Regarding Self Certification of installation |
23/06/2017 |
COMML.JDP/ 796 |
63.9 KB |
English |
Implementaions of provisions of Connectivity and Net Metering for RoofTop and small solar grid interactive syetem under Net metering Regulation 2015 |
21/06/2017 |
COMML.JDP/ 795 |
57.7 KB |
English |
Nomination of independent member at Circle level grievences redressal cum settlement forum |
20/06/2017 |
COMML.JDP/ 794 |
89.7 KB |
English |
असामान्य मीटर रीडिंग के मामलों में बिलिंग संबंधी दिषा-निर्देष। |
20/06/2017 |
COMML.JDP/ 793 |
50 KB |
Hindi |
Regarding not charging shunt capacitor surcharge from agriculture consumer |
20/06/2017 |
COMML.JDP/ 792 |
92.5 KB |
English |
नए विद्युत संबंध हेतु सर्विस लिने उपलबद्ध करवाने के संबंध में |
19/06/2017 |
COMML.JDP/ 791 |
42.5 KB |
Hindi |
Periodic testing of all catagories of Consumers ans analysing the output data provided by the meter reading agencies. |
13/06/2017 |
COMML.JDP/ 790 |
118.7 KB |
English |
Prepartion of cost estimates,overhead /supervision charges for Deosit work |
13/06/2017 |
COMML.JDP/ 789 |
208.5 KB |
English |
Amnesty Scheme for disconnected consumers in domestic category. |
06/06/2017 |
COMML.JDP/ 788 |
59.1 KB |
English |
Directions for release and load extension of Industrial /NDS Connections upto 33 Kv voltage |
02/06/2017 |
COMML.JDP/ 787 |
89.5 KB |
English |
लंबित सतर्कता जांच प्रतिवेदनो के अंतिम निस्तारण के संबंध में |
01/06/2017 |
COMML.JDP/ 786 |
94.8 KB |
Hindi |
ग्रामीण गेर आबादी क्षेत्र में घरेलू कनैक्शन दिये जाने के संबंध में |
30/05/2017 |
COMML.JDP/ 785 |
107.9 KB |
Hindi |
Revised Procedure for teh electrification of Colonies,Multistoried Buildings and Townships. |
08/05/2017 |
COMML.JDP/ 784 |
507.9 KB |
English |
Regarding release of new industrial/non-domestic connection and extension/reduction in connected load/ contract demand. |
03/05/2017 |
COMML.JDP/ 783 |
48.1 KB |
English |
लम्बित सतर्कता जांच प्रतिवेदनो के अंतिम निस्तारण के संबंध में |
02/05/2017 |
COMML.JDP/ 782 |
234 KB |
Hindi |
ग्रामीण क्षेत्र में घरेलु कनेक्शन हेतू शूल्क के सम्बन्ध में। |
24/04/2017 |
COMML.JDP/ 781 |
64.3 KB |
Hindi |
Information Regarding T&D and AT&C Losses of District Headquaters Municipal Towns & Industrial Feeder. |
21/04/2017 |
COMML.JDP/ 780 |
59.9 KB |
English |
Utilization of HT & MIP Boxes in Field |
21/04/2017 |
COMML.JDP/ 779 |
39.1 KB |
English |
Regarding approval of Metering on LT side |
12/04/2017 |
COMML.JDP/ 778 |
38.9 KB |
English |
Regarding Location of Meter /Metering Equipments |
06/04/2017 |
COMML.JDP/ 777 |
49.2 KB |
English |
ग्रामीण क्षेत्र में सरकारी विद्यालय मे कनेक्शन जारी कर के सम्बन्ध में। |
05/04/2017 |
COMML.JDP/ 776 |
63.1 KB |
Hindi |
Extension of Amnesty Scheme for Regular disconnected domestic and agriculture category connections upto 30.4.2017. |
03/04/2017 |
COMML.JDP/ 775 |
78.9 KB |
English |
कृषि श्रेणी में बढाई गई बिजली दरों को वापस लेने के संदर्भ में। |
03/04/2017 |
COMML.JDP/ 774 |
26.8 KB |
Hindi |
ग्रामीण क्षेत्र में घरेलु कनेक्शन जारी किये जाने हेतु निर्धारित दर के सम्बन्ध में। |
03/04/2017 |
COMML.JDP/ 773 |
38.4 KB |
Hindi |
Fuel surcharge amount for second ,third& fourth quarter of FY2016-17. |
03/04/2017 |
COMML.JDP/ 772 |
85.9 KB |
English |
ZIP File Calculation for fuel Surcharge for Circular 772 |
03/04/2017 |
Calculations for fuel surcharge |
146.2 KB |
English |
Regarding testing of removed defective Meter/ CT / CT PT Sets. |
30/03/2017 |
COMML.JDP/ 771 |
44.9 KB |
English |
Regarding recovery of application fee with application for activities other than new connection |
30/03/2017 |
COMML.JDP/ 770 |
42.5 KB |
English |
मीटर एवं फ्लेट रेट श्रेणी के कृषि उपभोक्ताओं के भार की जाँच के सम्बन्ध में। |
30/03/2017 |
COMML.JDP/ 769 |
39.5 KB |
Hindi |
विद्युत संबंध के नाम परिवर्तन के मामले में ली जाने वाली राषि के संबंध में। |
30/03/2017 |
COMML.JDP/ 768 |
46.1 KB |
Hindi |
Exemption of Electricity Duty from wind power for captive use as per notification dated 01.10.15. |
30/03/2017 |
COMML.JDP/ 767 |
39.5 KB |
English |
अंकेक्षण दल द्वारा उपभोक्ता से वसूली हेतु निर्धारित राषि को उपभोक्ता के बिल में जोडने के संदर्भ में। |
15/03/2017 |
COMML.JDP/ 766 |
78.6 KB |
Hindi |
कृषि श्रेणी में बढाई गई बिजली दरों को वापस लेने के संदर्भ में। |
03/03/2017 |
COMML.JDP/ 765 |
61.4 KB |
Hindi |
"Amnesty Scheme" for Government connections for realization of outsatnding dues |
01/03/2017 |
COMML.JDP/ 764 |
107 KB |
English |
Clarification on Comml/JDP/448 regarding shifting of electrical lines and other structures which are hazardous to human life |
27/02/2017 |
COMML.JDP/ 763 |
100 KB |
English |
Energy Audit at 33 KV Voltage level |
27/02/2017 |
COMML.JDP/ 762 |
164.4 KB |
English |
कृषि श्रेणी में बढाई गई बिजली दरों को वापस लेने के संदर्भ में। |
20/02/2017 |
COMML.JDP/ 761 |
87.8 KB |
Hindi |
विद्युत उपभोक्ताओं की शिकायतों के निराकरण हेतु शिविर आयोजित करने के सम्बन्ध में। |
20/02/2017 |
COMML.JDP/ 760 |
72.5 KB |
Hindi |
मीटर श्रेणी के कृषि उपभोक्ताओं के भार की जाँच के सम्बन्ध में। |
20/02/2017 |
COMML.JDP/ 759 |
69 KB |
Hindi |
Guidelines for dealing/treating cases in which the LT Supply consumers exceed their Contract Demand above 50 KVA for more than twice in a Financial Year |
16/02/2017 |
COMML.JDP/ 758 |
106.8 KB |
English |
Ratification of order no Comml.JDP/738 dtd 10.11.2016 issued by Commercial wing. |
07/02/2017 |
COMML.JDP/ 757 |
76.8 KB |
English |
ग्रामीण क्षेत्रों में घरेलू कनेक्शन जारी करने के सम्बन्ध में। |
03/02/2017 |
COMML.JDP/ 756 |
117.3 KB |
Hindi |
बिजनिस रजिस्ट्रेशन नम्बर के सम्बन्ध में। |
03/02/2017 |
COMML.JDP/ 755 |
911.2 KB |
Hindi |
मुख्यमंत्री ग्रामीण घरेलू कनेक्षन योजना। |
01/02/2017 |
COMML.JDP/ 754 |
68.7 KB |
Hindi |
कृषि कनेक्शनों के अनाधिकृत बढ़े हुये भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना‘‘ की अवधि पुनः बढाने बाबत्। |
01/02/2017 |
COMML.JDP/ 753 |
66.6 KB |
Hindi |
"Amnesty Scheme" for regular disconnected consumers for realization and outstanding dues |
01/02/2017 |
COMML.JDP/ 752 |
107.6 KB |
English |
Regarding Tariff payble to teh consumers for excess energy supplied to Discom under Net Metering regulation,2015 |
11/01/2017 |
COMML.JDP/ 751 |
116.9 KB |
English |
निवेषकों से उद्यम स्थापना पूर्व का पंजीयन/उद्यमिता ज्ञापन/उद्योग आधार मेमोरेण्डम की मांग नहीं करने बाबत्। |
03/01/2017 |
COMML.JDP/ 750 |
65.8 KB |
Hindi |
Extension of "Amnesty Scheme" for disconnected consumers for realization of outstanding dues. |
30/12/2016 |
COMML.JDP/ 749 |
94.8 KB |
English |
कृषि कनेक्षन के अनाधिकृत बढे हुए भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना’’ की अवधि बढाने बाबतें। |
30/12/2016 |
COMML.JDP/ 748 |
65.2 KB |
Hindi |
मुख्यमंत्री ग्रामीण घरेलू कनेक्षन योजना। |
30/12/2016 |
COMML.JDP/ 747 |
75.7 KB |
Hindi |
"Amnesty Scheme " for regular disconnected consumers for realization outstanding dues. |
16/12/2016 |
COMML.JDP/ 746 |
90 KB |
English |
मुख्यमंत्री ग्रामीण घरेलू कनेक्षन योजना। |
08/12/2016 |
COMML.JDP/ 745 |
73.8 KB |
Hindi |
"Amnesty Scheme"for regular disconnected consumers for realization of of outstanding dues |
29/11/2016 |
COMML.JDP/ 744 |
90.1 KB |
English |
Constitution of Working Committe |
28/11/2016 |
COMML.JDP/ 743 |
102.4 KB |
English |
कृषि कनेक्षन के अनाधिकृत बढे हुए भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना’’ की अवधि बढाने बाबतें। |
28/11/2016 |
COMML.JDP/ 742 |
63.4 KB |
Hindi |
Procedure for Installation replacement of meters. |
18/11/2016 |
COMML.JDP/ 741 |
189.1 KB |
English |
Simplification in the procedure for change in the Name of connection . |
18/11/2016 |
COMML.JDP/ 740 |
110.9 KB |
English |
मुख्यमंत्री ग्रामीण घरेलू कनेक्षन योजना। |
15/11/2016 |
COMML.JDP/ 739 |
75.9 KB |
Hindi |
Recovery of Fuel Surcharge amount for first quater of Fy 2016-17 |
10/11/2016 |
COMML.JDP/ 738 |
92.3 KB |
English |
Calculation for Circular 738 (Recovery of Fuel Surcharge amount for first quater of Fy 2016-17) |
|
Calculation |
47.8 KB |
|
Billing of consumers having and Net metering and Grid connectivity of grid connected Rooftop and SSPVs |
10/11/2016 |
COMML.JDP/ 737 |
172.2 KB |
English |
मुख्यमंत्री ग्रामीण घरेलू कनेक्षन योजना। |
28/10/2016 |
COMML.JDP/ 736 |
58.7 KB |
Hindi |
कृषि कनेक्षन के भार क्रा सघन अभियान |
26/10/2016 |
COMML.JDP/ 735 |
79.4 KB |
Hindi |
Replacement of Defective Meters |
21/10/2016 |
COMML.JDP/ 734 |
111.7 KB |
English |
ग्रामीण क्षेत्र में अनाधिकृत पेयजल योजनाओं के नियमित कनेक्षन करने हेतु दिषा निर्देष। लागू करने के संबंद्य में |
07/10/2016 |
COMML.JDP/ 733 |
110.7 KB |
Hindi |
Amnesty Scheme for disconnected consumers of all catgories for realization of outstanding dues |
29/09/2016 |
COMML.JDP/ 732 |
79.2 KB |
English |
Tariff for Supply of Electricity-2016 |
29/09/2016 |
COMML.JDP/ 731 |
2.3 MB |
English |
Procedure for replacement of burnt/failed distribution transformers in rural area |
20/09/2016 |
COMML.JDP/ 730 |
205.2 KB |
English |
Chief Minister's rural domestic connection Scheme. |
02/09/2016 |
COMML.JDP/ 729 |
102.9 KB |
English |
कृषि कनेक्षन के अनाधिकृत बढे हुए भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना’’ लागू करने के संबंद्य में। |
07/09/2016 |
COMML.JDP/ 728 |
94.9 KB |
Hindi |
Directions in respect of existing provision of clause 51(5)(6) of TCOS-2004,Redressal of Consumer grieveance. |
02/09/2016 |
COMML.JDP/ 727 |
126.5 KB |
English |
सघन वसूली अभियान |
26/08/2016 |
COMML.JDP/ 726 |
84.9 KB |
Hindi |
Clarification on Comml.JDP1713 regarding shifting of electric lines (HTILT Overhead) and other structures which are hazardous to human life & property during the campaign of "Surakshit Bijli Abhiyan". |
05/08/2016 |
COMML.JDP/ 725 |
201.7 KB |
English |
Detailed Guideline and Procedure for Net metering and Grid Connectivity of Grid Connected Roof Top and small Solar Photovoltic system. |
05/08/2016 |
COMML.JDP/ 724 |
102.7 KB |
English |
Rectification of order no 414 dated 28.06.16 issued by commercial wing regarding amnesty scheme. |
29/07/2016 |
COMML.JDP/ 723 |
112.1 KB |
English |
Reconstitution of Appellate Authority Committees. |
06/07/2016 |
COMML.JDP/ 722 |
176.3 KB |
English |
Guidelines for erection of GBM/RTT/RTP & putting up of Cellof Wheels (COW) & Micro-cells on Govt.lPSU/ULBIAutonomousBodiesl Co-operative Institutionsl Panchayati RajInstitutions Land &Buildings. |
06/07/2016 |
COMML.JDP/ 721 |
736.7 KB |
English |
Amnesty Scheme for disconnected consumers of all categories (disconnected upto or prior to 31.03.2015) for realization of outstanding dues. |
28/06/2016 |
COMML.JDP/ 720 |
368.6 KB |
English |
Simplification of procedure for obtaining new Electricity connection in view of ‘Ease of Doing Business’. |
13/06/2016 |
COMML.JDP/ 719 |
451.3 KB |
English |
Expense for obtaining new Industrial Electricity Connection under "Ease of doing Business" . |
09/06/2016 |
COMML.JDP/ 718 |
254.8 KB |
English |
Detailed Guideline & procedure for grant of availing Open Access |
02/06/2016 |
COMML.JDP/ 717 |
854.4 KB |
English |
Detailed Guideline & procedure for Net metering and Grid Connectivity of Grid Connected Rooftop & Small Photovoltic Systems. |
01/06/2016 |
COMML.JDP/ 716 |
453.9 KB |
English |
The Rajasthan sick macro & small Enterprises (Revival and Rehabilitations) scheme,2015 |
31/05/2016 |
COMML.JDP/ 715 |
275.8 KB |
English |
Simplification in the procedure of obtaining new Electricity connection in view of doing ease of business |
31/05/2016 |
COMML.JDP/ 714 |
256.3 KB |
English |
Shifting of electric lines (LT/HT overheads) and other structure which are hazardous to human life and property during the campaign of "Surakshit bijli abhiyan". |
12/05/2016 |
COMML.JDP/ 713 |
326.6 KB |
English |
Provision for single point electric supply for residential purpose. |
12/05/2016 |
COMML.JDP/ 712 |
527.3 KB |
English |
Prescribing norms for electrification of Private industrial area being developed by private investors. |
12/05/2016 |
COMML.JDP/ 711 |
448.1 KB |
English |
Recognition of "Bhamashah Card" as a valid document prrof for identity and address proof. |
12/05/2016 |
COMML.JDP/ 710 |
203.2 KB |
English |
Releasing connection to inhabitants residing in Kacchi Basties/tents/temporary structures |
11/05/2016 |
COMML.JDP/ 709 |
344.7 KB |
English |
Regarding self-certification of installation |
11/05/2016 |
COMML.JDP/ 708 |
2.3 MB |
English |
Regarding self-certification of installation of generating units |
11/05/2016 |
COMML.JDP/ 707 |
391.1 KB |
English |
Fuel Surcharge amount for all quarters of FY 2015-16. |
28/04/2016 |
COMML.JDP/ 706 |
121.4 KB |
English |
Guideline for Erection of GBM/RTT/RTP & putting up of Cell of Wheels (COW) & Micro cells on Govt./PSU/ULB/Autonomous Bodies/Co-operative Institutions/Panchayati Raj Institutions land & Buildings. |
22/03/2016 |
COMML.JDP/ 705 |
651.5 KB |
English |
Regarding recovery of Security from Agriculture Consumers |
17/03/2016 |
COMML.JDP/ 704 |
89.8 KB |
English |
कृषि कनेक्शन के अनधिकृत बढे हुए भार की "स्वेच्छिक भार वृद्धि घोषणा योजना " लागू करने के सम्बन्ध मे |
31/12/2015 |
COMML.JDP/ 703 |
106.5 KB |
Hindi |
Release of power connections to new industries without consent to establish(CTE) from RSPCB |
15/12/2015 |
COMML.JDP/ 702 |
93.9 KB |
English |
Prescribing norms for electrification of colonies/housing schemes developed by private builders/Developers/Housing Societies and releasing permanent connection therin. |
27/11/2015 |
COMML.JDP/ 701 |
218.9 KB |
English |
Ratification of order No. comml.jdp/696 dated 05.10.15 issued by Commercial wing. |
26/11/2015 |
COMML.JDP/ 700 |
124.6 KB |
English |
Tariff payable to the Grid Connected Rooftop & Small Solar Photovoltaic systems under Net Metering Regulation,2015. |
06/11/2015 |
COMML.JDP/ 699 |
282.5 KB |
English |
Recovery of compounding charges in case of Theft of Electicity. |
06/11/2015 |
COMML.JDP/ 698 |
233.7 KB |
English |
विषयः- कृषि कनेक्षन के अनाािकृत बे हुए भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना’’ लागू करने के संबंद्य में। |
12/10/2015 |
COMML.JDP/ 697 |
126.5 KB |
Hindi |
Recovery of fuel Surcharge amount for fourth quater of financial year 2014-2015. |
05/10/2015 |
COMML.JDP/ 696 |
77.5 KB |
English |
Laying of Optical Fibre based Telecom Network Cables on existing electric poles of Discoms (33 KV/11 KV/LT) for 4G communication, fixing of rental charges & interest free security amount. |
18/09/2015 |
COMML.JDP/ 695 |
567.8 KB |
English |
Implementation of provisions of Connectivity and Net Metering for Rooftop and Small Solar Grid Interactive System under Net Metering Regulation-2015. |
28/08/2015 |
COMML.JDP/ 694 |
102.8 KB |
English |
Clarification regarding provisions of Net Metering and grid connectivity of Grid Rooftop and small Photovoltaic Systems . |
28/07/2015 |
COMML.JDP/ 693 |
97.8 KB |
English |
नगरीय क्षेत्रों में नये निर्मित भवनों में स्थायी विद्युत कनेक्षन जारी करने के संबंध में। |
01/07/2015 |
COMML.JDP/ 692 |
206.3 KB |
Hindi |
Regarding Relaxation in applicability of Supply Voltage . |
29/06/2015 |
COMML.JDP/ 691 |
54.8 KB |
English |
Laying of optical fibre based telecom network cable on existing electric poles(33 KV/11 KV/LT) of Discoms for 4G communication fixing of existing rental charged & interest free security amount. |
24/06/2015 |
COMML.JDP/ 690 |
2.25 MB |
English |
Rates for compounding an offence of Theft of electricity . |
12/06/2015 |
COMML.JDP/ 689 |
476.5 KB |
English |
Procedure for Depositing defective meters in store . |
08/06/2015 |
COMML.JDP/ 688 |
236 KB |
English |
Providing Electric Connections to inhabitants of unapproved kacchi basties . |
29/05/2015 |
COMML.JDP/ 687 |
499.2 KB |
English |
Recovery of fuel surcharge amount for third quarter of financial year 2014-15 . |
28/05/2015 |
COMML.JDP/ 686 |
102.6 KB |
English |
Ratification of Order No.2507 dated 27.01.2015(comml.JDP/667),2508 dated 27.01.2015(Comml/JDP/668) and 2582 dated 23.02.2015 (Comml/JDP/670)issued by Commercial wing regarding recovery of Fuel surcharge.. |
26/05/2015 |
COMML.JDP/ 685 |
76.6 KB |
English |
Releasing of Single Phase Connection to Domestic/Non-Domestic consumers upto 10 KW connected load. |
26/05/2015 |
COMML.JDP/ 684 |
65.7 KB |
English |
Prescribing Norms for Electrification of Colonies/Housing Schemes developed by private builders/Developers/Housing Societies and releasing permanent connections therein . |
22/04/2015 |
COMML.JDP/ 683 |
335.3 KB |
English |
Detailed guidelines and procedure for Net metering & grid Connectivity of Grid connected rooftop and small solar Photovoltaic systems. |
17/04/2015 |
COMML.JDP/ 682 |
3.4 MB |
English |
Ratification of order No.Comml.JDP/672 dtd.02.03.15 issued by Commercial Wing. |
15/04/2015 |
COMML.JDP/ 681 |
58.2 KB |
English |
Prescribing Norms for Electrification of Colonies/Housing Schemes developed by private builders/Developers/Housing Societies and releasing permanent connections therein . |
15/04/2015 |
COMML.JDP/ 680 |
42.6 KB |
English |
Prescribing norms for electrification of Colonies/Housing Schemes developed by private builders/Developers/housing Societies and releasing permanent connections therein. |
10/04/2015 |
COMML.JDP/ 679 |
809 KB |
English |
Testing of the ABT meters of the consumers availing Open Access from Energy exchange/bilateral mode |
07/04/2015 |
COMML.JDP/ 678 |
108 KB |
English |
Levy of Electricity duty on consumption of Self Generated Energy for any purpose in respect of energy generated by captive power generating plants other than D.G.Sets . |
06/04/2015 |
COMML.JDP/ 677 |
448 KB |
English |
Testing of ABT meters of the consumers availing Open Access from Energy Exchange /bilateral mode. |
06/04/2015 |
COMML.JDP/ 676 |
219.9 KB |
English |
ओलावृष्टि से प्रभावित कृषकों के लिए 4 माह के बिजली के बिलों के भुगतान की राषि माफ करने बाबत्। |
06/04/2015 |
COMML.JDP/ 675 |
248.6 KB |
Hindi |
Regarding refund of Excess cost of Meter. |
13/03/2015 |
COMML.JDP/ 674 |
436.5 KB |
English |
Regarding applicability of tariff on Hostels. |
11/03/2015 |
COMML.JDP/ 673 |
106.2 KB |
English |
Reconstitution of Corporate level Grievance Redressal cum settlement forum Committee of Jodhpur Discom. |
02/03/2015 |
COMML.JDP/ 672 |
73.4 KB |
English |
Tariff for Supply of Electricity- 2015. |
02/03/2015 |
COMML.JDP/ 671 |
3.9 MB |
English |
Recovery of fuel surcharge amount for second quater of financial year 2014-15. |
23/02/2015 |
COMML.JDP/ 670 |
68.6 KB |
English |
कृषि कनेक्षन के अनाधिकृत बढे हुए भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना’’ के संबंध में। |
02/02/2015 |
COMML.JDP/- 669 |
105.7 KB |
Hindi |
Recovery of fuel surcharge amount. |
27/01/2015 |
COMML.JDP/ 668 |
885.1 KB |
English |
Recovery of fuel surcharge amount. |
27/01/2015 |
COMML.JDP/ 667 |
906.2 KB |
English |
Release of single phase connection in Rural Area to Domestic/Non-Domestic consumers upto 10KW connected load by installing meter along with AMT arrangements. |
09/01/2015 |
COMML.JDP/ 666 |
109.5 KB |
English |
Recovery of Fuel Surcharge Amount |
30/12/2014 |
COMML.JDP/ 665 |
169.6 KB |
English |
Rajasthan State Regulatory Commission (Standard of Performance of Distribution Licensee) Regulation -2014. |
16/12/2014 |
COMML.JDP/ 664 |
109.2 KB |
English |
Directive regarding following the provisions mentioned at clause-2 "Categary of consumer and character of service" of TCOS-2004 |
02/09/2014 |
COMML.JDP/ 663 |
95.7 KB |
English |
Compliance of directions issued by "Rajasthan State Pollution Control Board to disconnect the electric supply of consumer (s) for non compliance of directions issued under Section 31(A) of the "Air (Prevention & Control of Pollution) Act-1981 and Section-33 of the Water (Prevention & Control of Pollution) Act-1974 |
27/07/2014 |
COMML.JDP/ 662 |
176.6 KB |
English |
Electrification of private Industrial Area (s) to be developed by the Builder/Developers |
27/07/2014 |
COMML.JDP/ 661 |
220.6 KB |
English |
Regarding to provide additional metering equipment at the premises of HT supply Consumers for power factor purpose |
27/07/2014 |
COMML.JDP/ 660 |
106.7 KB |
English |
procedure for releasing connections on 33KV supply voltage |
18/07/2014 |
COMML.JDP/ 659 |
148.8 KB |
English |
Release of Industrial and Non-Domestic Category Connection in case of Voltage Regulation of 11 KV Feeder is more than 8% and the system improvement scheme has been sanctioned/approved |
18/07/2014 |
COMML.JDP/ 658 |
145.9 KB |
English |
खराब मीटरों को बदलने बाबत्। |
07/07/2014 |
COMML.JDP/ 657 |
186 KB |
Hindi |
Analyzing the output data's provided by meter reading agencies by M&P wing. |
07/07/2014 |
COMML.JDP/ 656 |
328 KB |
English |
Instructions regarding timely submission of reply/comment/factual report before Electricity Ombudsman,rajsathan. |
27/06/2014 |
COMML.JDP/ 655 |
257 KB |
English |
Installation of Auto Meter Reading (AMR) system on Mobile Tower Connections |
06/06/2014 |
COMML.JDP/ 654 |
166.3 KB |
English |
Releasing of single phase electric connection to domestic/Non Domestic Consumer up to 10 KW connected load |
06/06/2014 |
COMML.JDP/ 653 |
209.2 KB |
English |
Release of Industrial Connections |
06/06/2014 |
COMML.JDP/ 652 |
276.1 KB |
English |
Recovery of Fuel Surcharge amount |
06/06/2014 |
COMML.JDP/ 651 |
172.5 KB |
English |
Transfer of electric connections of M/s Wireless TT Info Services Limited and M/s QUIPPO Telecom Infrastructure Limited in the name of VIOM Networks Limited |
06/06/2014 |
COMML.JDP/ 650 |
179.5 KB |
English |
Regarding Defective ABT meters of Open Access Consumers |
06/06/2014 |
COMML.JDP/ 649 |
285.5 KB |
English |
Procedure for allotment of 33 & 11 KV CTPT set to field Officers for release of connections |
05/05/2014 |
COMML.JDP/ 648 |
199.2 KB |
English |
Constitution of Applellate Authority |
09/04/2014 |
COMML.JDP/ 647 |
430.3 KB |
English |
ओलावृष्टि से प्रभावित कृषकों के लिए 4 माह के बिजली के बिलों के भुगतान की राषि माफ करने बाबत्। |
03/04/2014 |
COMML.JDP/ 646 |
90.7 KB |
Hindi |
Amendment in detailed procedure for availing Open Access by consumers . |
21/03/2014 |
COMML.JDP/ 645 |
104.5 KB |
English |
Release of large number of connections under NDS category to various mobile tower companies/commercial entities . |
04/03/2014 |
COMML.JDP/ 644 |
115.8 KB |
English |
राजस्थान आवासन मण्डल की विभिन्न आवासीय योजनाओं में बाह्य विद्युतीकरण योजना की तकनीकी स्वीकृति के क्रम में। |
13/02/2014 |
COMML.JDP/ 643 |
64.2 KB |
Hindi |
Testing of meters of consumers availing Open access from Energy exchange/bilateral mode . |
13/02/2014 |
COMML.JDP/ 642 |
106.3 KB |
English |
Regarding Issue to Demand Notice in case of electrification of Affordable Housing Schemes under Affordable housing Policy-2009. |
13/02/2014 |
COMML.JDP/ 641 |
113.2 KB |
English |
Amendment in the procedure for allotment of 33 & 11 KV CTPT Set to field officers for release of connections . |
24/01/2014 |
COMML.JDP/ 640 |
187.2 KB |
English |
Procedure of Site Testing of Industrial/Non-Domestic Category Consumers. |
15/01/2014 |
COMML.JDP/ 639 |
215.5 KB |
English |
Instructions Regarding disposing cases timely by Settlement Forum and recovery of the amount in dispute. |
21/11/2013 |
COMML.JDP/ 638 |
125.2 KB |
English |
Amendment in detailed procedure for Availing Open Access by consumers. |
31/10/2013 |
COMML.JDP/ 637 |
57.2 KB |
English |
Transfer of Electric connections of M/s Bharti Infratel Ventures Ltd., M/s Idea Cellular Towers Infrastructure ltd. and M/s Vodafone Infrastructure Ltd. in the name of M/s Indus Towers Ltd. |
21/10/2013 |
COMML.JDP/ 636 |
119.5 KB |
English |
Procedure for allotment of 33 & 11 KV CTPT set to field officers for release of connections. |
04/10/2013 |
COMML.JDP/ 635 |
56.6 KB |
English |
Detailed Procedure for Availing Open Access by consumers. |
26/09/2013 |
COMML.JDP/ 634 |
120.1 KB |
English |
Regarding levy of Electricity Duty,Water ConservationCess,etc. on the quantum of assessment for Civil Liability. |
26/09/2013 |
COMML.JDP/ 633 |
144 KB |
English |
Amendments in "Terms & Conditions for Supply ofElectricity-2004" |
06/09/2013 |
COMML.JDP/ 632 |
253.7 KB |
English |
Recovery of Fuel Surcharge amount. |
13/08/2013 |
COMML.JDP/ 631 |
46.8 KB |
English |
Charging unauthorized Street Light Points from Municipalities/Local Bodies. |
02/08/2013 |
COMML.JDP/ 630 |
267.2 KB |
English |
Tariff For Supply Of Electrical-2013 |
29/07/2013 |
COMML.JDP/ 629 |
1.6 MB |
English |
Guideline Regarding Testing of Meter at Site. |
19/07/2013 |
COMML.JDP/ 628 |
104.5 KB |
English |
100 से कम आबादी वाली ढ़ाणियों में मुख्य मंत्री सबके लिए विद्युत योजना के अन्तर्गत घरेलू विद्युत कनेक्षन देने के क्रम में। |
24/06/2013 |
COMML.JDP/ 627 |
39.6 KB |
Hindi |
Regarding release of Large,Medium & Small industrial connections in Industrial Areas. |
20/05/2013 |
COMML.JDP/ 626 |
201.1 KB |
English |
Dealing with the cases of Energy Meters found slow/incorrect recording of consumption during checking/testing at site. |
20/05/2013 |
COMML.JDP/ 625 |
226.1 KB |
English |
Maintaining of Bill Correction Register. |
03/05/2013 |
COMML.JDP/ 624 |
2.1 MB |
English |
फार्म हाउस श्रेणी के कनेक्षनों को घरेलू सेवा से कृषि सेवा में परिवर्तन किये जाने के संबंध में। |
03/05/2013 |
COMML.JDP/ 623 |
1.4 MB |
Hindi |
यूजर चार्जेज/सफाई शुल्क (User Charges)अधिरोपित/ उद्ग्रहित करने के क्रम में। |
15/04/2013 |
COMML.JDP/ 622 |
499.4 KB |
Hindi |
Regarding meter reading of Mobile tower connections and Wedding house connections. |
15/04/2013 |
COMML.JDP/ 621 |
1.2 MB |
English |
Adequate publicity of scheduled outage period. |
14/03/2013 |
COMML.JDP/620 |
372.4 KB |
English |
ओलावृष्टि से प्रभावित कृषकों के लिए 4 माह के बिजली के बिलों के भुगतान की राषि माफ करने बाबत्। |
11/03/2013 |
COMML.JDP/ 619 |
103.3 KB |
Hindi |
Regarding annual review of security amount for open access consumer. |
11/03/2013 |
COMML.JDP/ 618 |
97.7 KB |
Hindi |
विद्युत अधिनियम-2003 में निहित प्रावधानानुसार प्रषमन राषि (Compounding Charges) एवं वैधानिक दायित्व (Civil Liability) के लिए ली जाने वाली राषि की गणना कर नोटिस जारी करने का प्रपत्र = (Format) A |
06/03/2013 |
COMML.JDP/ 617 |
135.1 KB |
Hindi |
Extension of Time Period of "Amnesty Scheme" Introduced vide order No.Comml.JDP/604 dated 08.01.2013. |
27/02/2013 |
COMML.JDP/ 616 |
173.7 KB |
English |
Sharing the cost of shifting of lines(HT/LT-O/H Lines). |
14/02/2013 |
COMML.JDP/ 615 |
227.5 KB |
English |
Recovery of Civil Liability amount as well as compunding charges in case of first offence of theft of Electricity under section-135 of the Electricity Act-2003 |
12/02/2013 |
COMML.JDP/ 614 |
236.9 KB |
English |
कृषि कनेक्षनो में अनाधिकृत बढ़े हुए भार की ’’स्वैच्छिक भार वृद्धि घोषणा योजना‘‘ |
06/02/2013 |
COMML.JDP/ 613 |
75.4 KB |
Hindi |
Regarding release of Industrial Connections. |
05/02/2013 |
COMML.JDP/ 612 |
206.3 KB |
English |
Clarification on Comml.JDP/581 regarding the fixed charges fo rAgriculture consumers. |
21/01/2013 |
COMML.JDP/ 611 |
21.8 KB |
English |
Permitting the applicant to provide their own meter/metering equipment. |
21/01/2013 |
COMML.JDP/ 610 |
29.4 KB |
English |
Regarding reliable Power supply to Railway.s |
21/01/2013 |
COMML.JDP/ 609 |
21.7 KB |
English |
Procedure for installation of main meter,check meter and stand by meter in respect of open access consumers. |
21/01/2013 |
COMML.JDP/ 608 |
86 KB |
English |
Procedure for billing of Renewable Energy generator |
14/01/2013 |
COMML.JDP/ 607 |
191.5 KB |
English |
आबादी क्षेत्र में कनेक्षन देने बाबत् (कृषि कनेक्षन के अलावा) |
14/01/2013 |
COMML.JDP/ 606 |
78.4 KB |
Hindi |
Recovery of Fuel Surcharge Amount. |
10/01/2013 |
COMML.JDP/ 605 |
174.6 KB |
English |
Extension of Time Period of "Amnesty Scheme". |
08/01/2013 |
COMML.JDP/ 604 |
86.1 KB |
English |
Non Abadi areas/agriculture land in Rural Areas. |
08/01/2013 |
COMML.JDP/ 603 |
47.3 KB |
English |
मीटर के मूवमेंट के अभिलेख ;त्मबवतकद्ध को बनाने के संबंध में। |
21/21/2012 |
COMML.JDP/ 602 |
297.7 KB |
Hindi |
Treatment to be given to the compounding charges recovered against theft of energy. |
14/12/2012 |
COMML.JDP/ 601 |
30.6 KB |
English |