Sr. No |
Circular No. |
Dispatch No |
Subject |
Circular Date |
Size |
Language |
Document |
300 |
Comml AJ-301 |
AVVNL/CE(Comml.)/XEN-I/F.57(D)/2007/D.1760 |
Electricity Amendment-2007 |
20-Jun-07 |
2.5 MB |
English |
Download |
299 |
Comml AJ-300 |
AVVNL/CE(Comml.)/XEN-I/F./2007/D.1726 |
Action against a person for unathorized use of electricity & other offencess under sections 126,127,135 to 151 and compounding of offence under section -152 of the electricity Act-2003 |
18-Jun-07 |
566 KB |
English |
Download |
298 |
Comml AJ-299 |
AVVNL/CE(Comml.)/XEN-I/F. 57 (D) /2007/D.722 |
Multiply factor be also mentioned in word apart from numerical number , in joint inspection report. |
16-May-07 |
77 KB |
English |
Download |
297 |
Comml AJ-298 |
AVVNL/CE(Comml.)/XEN-I/F. 57 (D) /2007/D.721 |
Regarding procedure for release of new domestic connection connection as well as reconnection in rural areas and kachhi basties of urban areas (Comml AJ-291) |
16-May-07 |
79 KB |
English |
Download |
296 |
Comml AJ-297 |
AVVNL/CE(Comml.)/XEN-I/F. 57 /2007/D.710 |
Extension in the period of amnesty scheme introduced vide order No. Comml AJ-292 dt. 13.04.07 |
15-May-07 |
66 KB |
English |
Download |
295 |
Comml AJ-296 |
AVVNL/CE(Comml.)/XEN-I/F. 57 (D)/2007/D.489 |
To authorized circle superintending Engineer (O&M), to appoint local person /agency for taking reading of energy meters installed on super transformers |
30-Apr-07 |
1014 KB |
English |
Download |
294 |
Comml AJ-295 |
AVVNL/CE(Comml.)/XEN-(C)/F. /2007/D.382 |
To release pending PHED connection on the basis of under taking given by PHED authority |
23-Apr-07 |
95 KB |
English |
Download |
293 |
Comml AJ-294 |
AVVNL/CE(Comml.)/XEN-I/F. 57(D) /2007/D.369 |
Preparation of VCR sheet along with JIR sheet |
23-Apr-07 |
86 KB |
English |
Download |
292 |
Comml AJ-293 |
AVVNL/CE(Comml.)/XEN-I/F. 57 (D)/2007/D.281 |
Recovery of transformation losses @ 3% plus transformer rent as per TCOS-2004 |
18-Apr-07 |
103 KB |
English |
Download |
291 |
Comml AJ-292 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. 57 /2007/D.227 |
Amnesty scheme for the recovery of out standing for agriculture and other category consumers |
13-Apr-07 |
812 KB |
English |
Download |
290 |
Comml AJ-291 |
AVVNL/CE(Comml.)/XEN-I/F. 57(D) /2007/D.224 |
Procedure for release of new domestic connection as well as reconnection in rural areas and in kachhi baties of urban areas |
13-Apr-07 |
92 KB |
English |
Download |
289 |
Comml AJ-290 |
AVVNL/CE(Comml.)/XEN-I/F. 57(D) /2007/D.200 |
Power factor for the purpose of billing power factor incentive and /or surcharge |
13-Apr-07 |
694 KB |
English |
Download |
288 |
Comml AJ-289 |
AVVNL/CE(C)/XEN(C)/F. /2007/D. 124 |
Regarding exemption of electricity bills for four month (Nov, Dec-06 and Jan, Feb-07) from small marginal farm & due to Hail |
7-Apr-07 |
90 KB |
English |
Download |
287 |
Comml AJ-288 |
AVVNL/CE(Comml.)/XEN-I/F. 57 (D)/2007/D.122 |
Compliance of directions issued by “Rajasthan State Pollution Control Board” to disconnect the electric supply of consumer (S) for non compliance of directions issued under section 31 (A) of the” Air (Privention & Control of Pollution) Act-1981 and section-33A of the “Water (Prevention & Control of Pollution)Act-1974. |
7-Apr-07 |
89 KB |
English |
Download |
286 |
Comml AJ-287 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. /2006/D.4698 |
" CLARIFICATION" Amnesty Scheme was announced vide Order Comml. Ajmer dated 13.02.07. |
26-Mar-07 |
92 KB |
English |
Download |
285 |
Comml AJ-286 |
AVVNL/CE(Comml.)/XEN-I/F. /2007/D.4689 |
Insisting for production of “No Objection Certificate” (NOC) |
26-Mar-07 |
79 KB |
English |
Download |
284 |
Comml AJ-285 |
AVVNL/CE(Comml.)/XEN-I/F. 57 /2007/D.4528 |
Extensions in the period of Amnesty Scheme -2007 introduced vide Order No.Comml.AJ-276 dated 13-2-07. |
14-Mar-07 |
62 KB |
English |
Download |
283 |
Comml AJ-284 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. 57 (D)/2006/D.4512 |
Recovery of Security Deposit from the Connections of AVVNL. |
12-Mar-07 |
67 KB |
English |
Download |
282 |
Comml AJ-283 |
AVVNL/CE(Comml.)/XEN-I/F. /2007/D.4495 |
Error in billing due to change of MF on replacement of CTs/CTPT set. |
12-Mar-07 |
88 KB |
English |
Download |
281 |
Comml AJ-282 |
AVVNL/CE(Comml.)/XEN-I/F. /2007/D.4494 |
Regarding the reading of check meters along with other meters. |
12-Mar-07 |
76 KB |
English |
Download |
280 |
Comml AJ-281 |
AVVNL/CE(Comml.)/XEN-I/F. 57/2006/D.4493 |
Amnesty Scheme for all categories of consumers. |
12-Mar-07 |
93 KB |
English |
Download |
279 |
Comml AJ-280 |
अविविनिलि/मु.अ.(वा.)/अअ-(वा)/फा/2007/प्रे-4538 |
ओला वृष्टि से प्रभावित गांवो के लघु एवं सीमांत काश्तकारो को जनवरी-2007, व फरवरी-2007 के बिजली के बिलो की राशि के भुगतान मे छूट |
1-Mar-07 |
973 KB |
Hindi |
Download |
278 |
Comml AJ-279 |
AVVNL/CE(Comml.)/XEN-I/F. /2006/D.4442 |
Release of domestic connections for scattered house holds near the fields. |
24-Feb-07 |
89 KB |
English |
Download |
277 |
Comml AJ-278 |
अविविनिलि/मु.अ.(वा.)/अअ-(वा)/फा/2006/प्रे- 4274 |
कृषि श्रेणी उपभोक्ता से बिलो क भुगतान स्वीकार करने के सम्बन्ध मे |
13-Feb-07 |
683 KB |
Hindi |
Download |
276 |
Comml AJ-277 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. 57 (D)/2006/D.4259 |
Conversion of a connection from one category to another Category. |
13-Feb-07 |
575 KB |
English |
Download |
275 |
Comml AJ-276 |
अविविनिलि/मु.अ.(वा.)/अअ-(वा)/फा–57डी/2006/प्रे-4249 |
कृषि एवं अन्य श्रेणीयो के उपभोक्ता के बकाया राशि वसूली के लिये रियायती योजना |
13-Feb-07 |
1.2 MB |
Hindi |
Download |
274 |
Comml AJ-275 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. 57 (D)/2006/D.4216 |
Payment of interest on security during disconnected period. |
9-Feb-07 |
88 KB |
English |
Download |
273 |
Comml AJ-274 |
अविविनिलि/मु.अ.(वा.)/अअ-(वा)/फा–(57)डी/2006/प्रे-3789 |
विशेष श्रेणी, हरा चारा, विशेष श्रेणी, नर्सरी श्रेणी व ग्रामीण क्षेत्र के फार्म हाउस (जिन्हे 24 घंटे विद्युत आपूर्ति नही की जा रही है के कृषि कनेक्शन को सामान्य श्रेणी मे परिवर्तन करने के बारे मे |
15-Jan-07 |
1.2 MB |
Hindi |
Download |
272 |
Comml AJ-273 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. 57(D) /2006/D.3617 |
Recording the reading of check meter along with other meters provided for other individual connections in “Building Complexes”. |
2-Jan-07 |
118 KB |
English |
Download |
271 |
Comml AJ-272 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. 57 (D)/2006/D.3616 |
Monitoring of “Joint Inspection Report” (JIR) and early implementation of the observations made by the checking officers. |
2-Jan-07 |
119 KB |
English |
Download |
270 |
Comml AJ-271 |
अविविनिलि/मु.अ.(वा.)/अअ-(वा-I)/फा–57डी/2006/प्रे-3605 |
कृषि कनेक्शन को बढे हुए भार वृद्धि को माप कर नियमित करके बिलिंग करना |
30-Dec-06 |
1.1 MB |
Hindi |
Download |
269 |
Comml AJ-270 |
AVVNL/CE(Comml.)/XEN-I/F. 57/2006/D.3283 |
Recovery of security deposit equivalent to 30 days consumption from industrial consumers revived under Revival Package announced by the State Government. |
1-Dec-06 |
486 KB |
English |
Download |
268 |
Comml AJ-269 |
AVVNL/CE(Comml.)/XEN-I/F. 57/2006/D.3287 |
Limitation prescribed by Law in raising Debits as a consequence to meter found defective on testing-Debiting the assessment within 2 years. |
1-Dec-06 |
1 MB |
English |
Download |
267 |
Comml AJ-268 |
AVVNL/CE(Comml.)/XEN-I/F. /D.3281 |
Release of connection under NDS category to various Organization/ Commercial entities large number of electric connections at various locations in area of Ajmer Discom. |
1-Dec-06 |
657 KB |
English |
Download |
266 |
Comml AJ-267 |
AVVNL/CE(Comml.)/XEN-I/F. 57/2006/D.4223 |
Replace of burnt/damaged Service Lines. |
25-Nov-06 |
84 KB |
English |
Download |
265 |
Comml AJ-266 |
AVVNL/CE(Comml.)/XEN-I/F. 57/2006/D.4222 |
Replacement of burnt/ damaged Push Fit Energy Meters. |
25-Nov-06 |
91 KB |
English |
Download |
264 |
Comml AJ-265 |
अविविनिलि/मु.अ.(वा.)/अधि.अ-I/फा–57डी/प्रे-4217 |
काटे हुए कृषि श्रेणी के विद्युत कनेक्शनो को पुनः जोडने बाबत |
25-Nov-06 |
212 KB |
Hindi |
Download |
263 |
Comml AJ-264 |
AVVNL/CE(Comml.)/XEN-I/F. 57/2006/D.4216 |
Preventive measures for checking pilferage of energy by industrial consumers. Release of new SIP/MIP-LT connections. |
25-Nov-06 |
698 KB |
English |
Download |
262 |
Comml AJ-263 |
AVVNL/CE(Comml.)/XEN-I/F. 57/2006/D.4215 |
Calculation of the requirement of additional security on the basis of average consumption of electricity for the preceding twelve months. |
25-Nov-06 |
500 KB |
English |
Download |
261 |
Comml AJ-262 |
AVVNL/CE(Comml.)/XEN-I/F. 57/2006/D.4180 |
Reconstitutions of Corporate Level Settlement Committee of AVVNL. |
22-Nov-06 |
85 KB |
English |
Download |
260 |
Comml AJ-261 |
AVVNL/CE(Comml.)/XEN-I/F. 57/2006/D.4179 |
Unguarded electric lines passing over educational institutions. |
22-Nov-06 |
89 KB |
English |
Download |
259 |
Comml AJ-260 |
AVVNL/CE(Comml.)/XEN-I/F. 57/2006/D.4178 |
Laying of separate feeder for industrial and non-domestic connections situated in rural areas for connecting them from continuous supply feeders. |
22-Nov-06 |
479 KB |
English |
Download |
258 |
Comml AJ-259 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. 57 /2006/D.4126 |
ORDER:- Regarding applicability of tariff to be levied on electric connection taken under community Kitchens being set up by the State Government under Mid Day Meal Programmer. |
17-Nov-06 |
106 KB |
English |
Download |
257 |
Comml AJ-258 |
AVVNL/Dy.CE(Comml.)/XEN-IF.57/2006/D.4053 |
Modification in “Meter Reading Record “(Ajmer Discom A-10) revised vide order No- AJ-253) |
10-Nov-06 |
|
English |
Download |
256 |
Comml AJ-257 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. 57 /2006/D.2968 |
Insisting for production of “No Objection Certificate”. |
27-Sep-06 |
87 KB |
English |
Download |
255 |
Comml AJ-256 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. 245 /2006/D.2695 |
Charges to be recovered for releasing street light connections in the industrial areas of RIICO. |
6-Sep-06 |
92 KB |
English |
Download |
254 |
Comml AJ-255 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. 57 /2006/D.2542 |
Inordinate delay in allowing Credits/ relief / concessions to the consumers. |
29-Aug-06 |
113 KB |
English |
Download |
253 |
Comml AJ-254 |
AVVNL/CE(Comml.)/XEN-I/F. 57 /2006/D.2470 |
Clarification regarding tariff to be levied on electric connections taken under community Kitchens being set up for the Govt. Mid Day Meal Programme in the State. |
22-Aug-06 |
113 KB |
English |
Download |
252 |
Comml AJ-253 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. /2006/D.2423 |
Revision in “Meter Reading Record” (Ajmer Discom A-10) for recording readings of Maximum Demand. |
19-Aug-06 |
799 KB |
English |
Download |
251 |
Comml AJ-252 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. /2006/D.2263 |
Recovery of security deposit equivalent to one and half month’s consumption/ minimum billing amount from consumers who have executed supplementary agreement in lieu of fortnightly billing. |
7-Aug-06 |
103 KB |
English |
Download |
250 |
Comml AJ-251 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. /2006/D.2141 |
Rebate of 7.5% to be allowed to the consumers under Bulk supply of Mixed load (Scheme ML/LT-7) FOR supply on HT. |
1-Aug-06 |
95 KB |
English |
Download |
249 |
Comml AJ-250 |
AVVNL/CE(Comml.)/XEN-I/F. 57 /2006/D.2023 |
Treatment of domestic connections released through agriculture transformers. |
24-Jul-06 |
83 KB |
English |
Download |
248 |
Comml AJ-249 |
AVVNL/CE(Comml.)/Sr.AO/F. /2006/D.1951 |
Proper accounting of wheeled energy for calculation of T & D loss. |
24-Jul-06 |
104 KB |
English |
Download |
247 |
Comml AJ-248 |
AVVNL/CE(Comml.)/XEN-(C-I)/F. /2006/D.1143 |
Charging consumers in case of magnetic tamper. |
28-Jun-06 |
81 KB |
English |
Download |
246 |
Comml AJ-247 |
F.15($)Energy/2003/ (Energy Department) |
NOTIFICATION:- The power conferred by section 152 of the Electricity Act-2003.(Central Act No.36 of 2003) and in supersession of this departments even number of notification dated 28.2.04 . |
8-May-06 |
99 KB |
English |
Download |
245 |
Comml AJ-246 |
AVVNL/CE(Comml)/XEN-(C-I)/F.57/2006/D.1040 |
Regarding release of connections to other category of consumer (other than PHED connections) from feeders meant for water supply schemes of PHED. |
22-Jun-06 |
80 KB |
English |
Download |
244 |
Comml AJ-245 |
AVVNL/CE(Comml)/XEN-I/F.57/2006/D.774 |
Charging of supervision charges @ 15% from the Rajasthan Housing Board. |
6-Jun-06 |
62 KB |
English |
Download |
243 |
Comml AJ-244 |
AVVNL/CE(Comml)/XEN-I/F.57/2006/D.418 |
Further extension in the period of Amensty Scheme-2006 introduced vide Order No. Comml. AJ-238 dated 08.03.2006. |
6-Jun-06 |
99 KB |
English |
Download |
242 |
Comml AJ-243 |
AVVNL/CE(Comml)/XEN-I/F.57/2006/D.400 |
Instructions for Circle and Chief Engineer Level Settlement Committee(s) in deciding the cases of large industrial consumer. |
5-May-06 |
71 KB |
English |
Download |
241 |
Comml AJ-242 |
AVVNL/CE(Comml.)/XEN-I /F.57 /2006/D.207 |
Further extension in the period of Amensty Scheme-2006 introduced vide Order No. Comml. AJ-238 dated 08.03.2006. |
21-Apr-06 |
73 KB |
English |
Download |
240 |
Comml AJ-241 |
AVVNL/CE(C)/XEN(C)/F./ 2006/D.188 |
Relief in energy bile for the month of feb and march 2006 on a/c of drought for small and marginal farmers |
18-Apr-06 |
160 KB |
English |
Download |
239 |
Comml AJ-240 |
AVVNL/CE(C)/XEN(C)/F. /2006/D.6290 |
Regarding conversion of special ,fodder, Nursery, category (To whom apply is not give for 24 Hrs.) rural agricultural connection into general category connection. |
27-Mar-06 |
104 KB |
English |
Download |
238 |
Comml AJ-239 |
AVVNL/CE(Comml.)/XEN-I/F.57/2006/D.6125 |
Amensty Scheme for all categories of consumers. |
10-Mar-06 |
72 KB |
English |
Download |
237 |
Comml AJ-238 |
AVVNL/CE(Comml.)/XEN-I/F.57/2006/D.6085 |
“Amnesty Scheme” for all category of consumer-realistionof outstanding dues there of. |
8-Mar-06 |
1.2 MB |
English |
Download |
236 |
Comml AJ-237 |
AVVNL/CE(Comml.)/XEN-I/F.57/2005/D.5160 |
Compliance of the directions of Raj. State Pollution Control Board to disconnect the electric supply of consumer for non-compliance of Section 31 (A) of Air Act-1981 & section 33(A) of Water (Prevention & Control of Pollution)Act-1974. |
30-Jan-06 |
95 KB |
English |
Download |
235 |
Comml AJ-236 |
AVVNL/CE(Comml)/XEN-I/F.57/2005/D. 4667 |
"Guideline for giving electric connection to a person to whom |
29-Dec-05 |
70 KB |
English |
Download |
234 |
Comml AJ-235 |
AVVNL/CE(C)/XEN(C)/F.2005/D.4461 |
Conversion of agriculture connection of special fodder, nursery and farm house category in rural area, into general category |
14-Dec-05 |
138 KB |
English |
Download |
233 |
Comml AJ-234 |
AVVNL/CE(Comml.)/XEN(C-II/F. /2005/D.4440 |
Procedure to be followed while entertaining and disposing the cases by consumerdues Settlement committee. |
12-Dec-05 |
80 KB |
English |
Download |
232 |
Comml AJ-233 |
AVVNL/CE(Comml)/XEN-I/F./2005/D.4238 |
Regarding acceptance of amount of energy Bill of from agriculture consumer on exisiting tariff. |
24-Nov-05 |
70 KB |
English |
Download |
231 |
Comml AJ-232 |
AVVNL/CE(Comml)/XEN-I/F./2005/D.4153 |
Regarding installation of capacitor of agriculture consumers |
11-Nov-05 |
82 KB |
English |
Download |
230 |
Comml AJ-231 |
AVVNL/CE(Comml)/XEN-I/F./2005/D.4152 |
Regarding filling of V.C.R. in case meter burnt condition from agricultural consumers. |
11-Nov-05 |
72 KB |
English |
Download |
229 |
Comml AJ-230 |
AVVNL/CE(C)/XEN-(C)/F. /2005/D.4151 |
To accept the amount of agriculture consumer on existing tariff . |
11-Nov-05 |
81 KB |
English |
Download |
228 |
Comml AJ-229 |
AVVNL/CE(C)/XEN-I/F.57/D.2504 |
Regarding lift irrigation yojana. |
17-Sep-05 |
151 KB |
English |
Download |
227 |
Comml AJ-228 |
AVVNL/CE(C)/XEN(C)/F.57/2005/D.2476 |
To accept amount form agriculture consumer on existing tariff. |
15-Sep-05 |
68 KB |
English |
Download |
226 |
Comml AJ-227 |
AVVNL/CE(Comml)/XEN-I/F.171/2005/D.2474 |
Amendment in item (d) denoting “Payment” under Tariff Schedule AG/FR/LT-4 Tariff for Supply of Electricity-2004. |
15-Sep-05 |
74 KB |
English |
Download |
225 |
Comml AJ-226 |
AVVNL/MD/F./D.445 |
ORDER:- AVVNL/CE/Comml.)XEN-I/F.57/2005/D.2194 Dt.26.8.2005. |
4-Sep-05 |
48 KB |
English |
Download |
224 |
Comml AJ-225 |
AVVNL/MD/F. /D.444 |
Action against a person for unauthorized use of electricity and other offecnes under 126,127,135 to 151 and compounding of offeces under section 152 of the Electricity Act-2003. |
4-Sep-05 |
83 KB |
English |
Download |
223 |
Comml AJ-224 |
AVVNL/CE(Comml)/XEN-I/F./2005/D.2332 |
Charges to be taken for reconnection fo PDC HT consumers. |
2-Sep-05 |
94 KB |
English |
Download |
222 |
Comml AJ-223 |
AVVNL/CE(Comml)/XEN-I/F.57(D)/2005/D.2331 |
Charging 50% of energy charges plus full fixed charges of “Domestic Service (Schedule DS/LT-I)” instead of 50% of “Non-domestic Service (Schedule NDS/LT-2 of NDS/HT-2)” from GAUSHALA’s connection. |
2-Sep-05 |
93 KB |
English |
Download |
221 |
Comml AJ-222 |
AVVNL/CE(Comml)/XEN-I/F.57(D)/2005/D.2330 |
ORDER;- Testing/checking of connections under small Industrial category having sanctioned connected load from 15 HP to 25 HP and DS/NDS/Mixed load categories having sanctioned connected load from 18.65KW TO 25 KW. |
2-Sep-05 |
93 KB |
English |
Download |
220 |
Comml AJ-221 |
AVVNL/CE(Comml)/XEN-I/F.57(D)/2005/D.2194 |
ORDER;- The state Govermment vide the notification No. 1 (4) energy 2008 dated 28.02.2001 has specified appellate Authorities as mentioned below for hearing and disposal of preferred to them under section 127 of the Electricity Act. 2003. |
26-Aug-05 |
802 KB |
English |
Download |
219 |
comml AJ-220 |
AVVNL/CE(Comml)/XEN-I/F.57(D)/2005/D.1615 |
Concessional changes for releasing connections under domestic category in rural areas. |
12-Jul-05 |
64 KB |
English |
Download |
218 |
Comml AJ-219 |
AVVNL/CE(Comml)/XEN-I/F.57(D)/2005/D.798 |
Change of category from SIP to MIP when the maximum load/ demand exceeds 25HP (18.65 KW) on three occasions in a financial year. |
6-Jun-05 |
89 KB |
English |
Download |
217 |
Comml AJ-218 |
AVVNL/MD/Comml./F.57/05-06/D.686 |
Section -135 of Electricity Act-2003 deals with theft of Electricity when a consumer in checked and caught engaged in theft of electricity such a consumer has two choices. |
30-May-05 |
73 KB |
English |
Download |
216 |
Comml AJ-217 |
अविविनिलि/मु.अ.(वा.)/अधि.अ-I/फ–57/2005/प्रे- 508 |
रबी की फसल के दौरान हुई ओला वृष्टि से प्रभावित गांवो के लघु एवं सीमांत काश्तकारो को फरवरी एवं मार्च 2005 के बिजली के बिलो की राशि के भुगतान मे छुट |
11-May-05 |
|
Hindi |
Download |
215 |
Comml AJ-216 |
AVVNL/MD/CE(Comml)/XEN-I/F.57(D)/2005/D.486 |
Amnesty Scheme for domestic. Non-domestic, agricultural industrial consumer and also for Govt. department local bodies for depositing the outstanding dues. |
9-May-05 |
111 KB |
English |
Download |
214 |
Comml AJ-215 |
AVVNL/CE(Comml)/XEN-I/F.57(D)/2005/D. 235 |
Rules framed by Central Government under Electricity Act-2003 in respect of Intimation of Accidents (Form & Time of service of Notice Rules ,2004. |
21-Apr-05 |
79 KB |
English |
Download |
213 |
Comml AJ-214 |
AVVNL/CE(Comml)/XEN-I/F.57/2005/D.163 |
Security for industrial consumers opting fortnightly billing. |
15-Apr-05 |
84 KB |
English |
Download |
212 |
Comml AJ-213 |
AVVNL/CE(Comml)/XEN-I/F.57/2005/D.30 |
Preventive measures for checking pilferage of energy by industrial consumers. |
2-Apr-05 |
919 KB |
English |
Download |
211 |
Comml AJ-212 |
AVVNL/CE(Comml)/XEN-I/F.57/2005/D.6825 |
Action against a person for unauthorized use of electricity & other offences under Section 126,127,135 to 151 and Compounding of offence under Section-152 of the Electricity Act-2003. |
10-Mar-05 |
8 MB |
English |
Download |
210 |
Comml AJ-211 |
AVVNL/CE(Comml)/XEN-II/F.57/2005/D.6035 |
Regarding wattage of Air-conditioner 1/1.5 Ton. |
25-Feb-05 |
61 KB |
|
Download |
209 |
Comml AJ-210 |
AVVNL/CE(Comml)/XEN-I/F.24/2004/D.5875 |
Precautions to be taken while entertaining and disposing the cases by the Consumer Dues Settlement committees under clause 52 of “Terms and conditions for Supply of Electricity-2004” |
14-Feb-05 |
|
English |
Download |
208 |
Comml AJ-209 |
AVVNL/CE(Comml)/XEN-I/F.57(D)/2005/D.5874 |
Disposal of settlement cases. |
14-Feb-05 |
74 KB |
English |
Download |
207 |
Comml AJ-208 |
AVVNL/CE(C)/XEN-I/F.57/2005/D.5873 |
Filling of Appeal under section-127 of the electricity Act-2003, against the final assessment made under Section-126 of the Electricity Act-2003. |
14-Feb-05 |
|
English |
Download |
206 |
Comml AJ-207 |
AVVNL/CE(Comml)/XEN-I/F.57(D)/2005/D.5872 |
Allwoing NHAI to take –up the work of shifiting of electric poles/ lines. |
14-Feb-05 |
59 KB |
English |
Download |
205 |
Comml AJ-206 |
AVVNL/CE(C)/XEN-I/F.57/2005/D.5576 |
Laying of separate feeder for industrial & Non-domestic conncetions situated in Rural Areas for connections them form continuous supply feeder. |
31-Jan-05 |
75 KB |
English |
Download |
204 |
Comml AJ-205 |
AVVNL/CE(COMML)/XEN-1/F.57/2005/D. 5311 |
Including the name of Debt Recovery Tribunal (DRT) under the purview of order no. Comml AJ-154 dt. 23.01.04 and clause 42(6) of TCOS-2004 |
24-Jan-05 |
694 KB |
English |
Download |
203 |
Comml AJ-204 |
AVVNL/CE(COMML)/XEN-1/F.57/2005/D. 5310 |
Not tapping Railway feeders for supply to public |
24-Jan-05 |
92 KB |
English |
Download |
202 |
Comml AJ-203 |
AVVNL/CE(COMML)/XEN-1/F.57/2005/D. 5309 |
Taking load data through MRI in respect of large industrial consumers |
24-Jan-05 |
104 KB |
English |
Download |
201 |
Comml AJ-202 |
AVVNL/CE(COMML)/XEN-1/F.57/2005/D. 5205 |
Applicability of the provisions of clause -47(2) of the “Terms & Conditions for supply of electricity , 2004” (TCOS-2004) |
14-Jan-05 |
648 KB |
English |
Download |