Comml AJ-801 to 900
S. No | Circular No. | Dispatch No | Subject/Description | Circular Date | Size | Language | Link |
816 | Comml AJ-816 | AVVNL/ACE(H.Q.)/SE(Comml)/XEN(C-II)/(F)/2020-21/ D. 2067 dated 26.11.2020 | Directions in the cases of Unauthorized use of electricity. | 31.12.2020 | 1.4 MB | English | Download |
815 | Comml AJ-815 | AVVNL/CE(HQ)/XEN-I/F. 57(F)/2020-21/ D. 1747 dated 26.11.2020 |
Recovery of Fuel Surcharge amount For First Quarter of FY 2020-21 | 26.11.2020 | 2.41 MB 97 KB 1.37 MB |
English | |
814 | Comml_AJ-814 | AVVNL/ACE(H.Q.)/SE(Comml)/XEN(C-II)/F./2020-21/ D. 1498 dated 27.10.2020 | Regarding ground clearance of the lowest conductor of overhead lines. | 27.10.2020 | 747 KB | English | Download |
813 | Comml_AJ-813 | AVVNL/ACE(H.Q.)/SE(Comml)/XEN(C-II)/F./2020-21/ D. 1246 dated 28.09.2020 | Regarding replacement of burnt Single Phase Distribution Transformers in rural abadi area/Dhani. | 28.09.2020 | 370 KB | English | Download |
812 | Comml_AJ-812 | AVVNL/ACE(H.Q.)/SE(Comml)/XEN(C-II)/F./2020-21/ D. 1245 dated 28.09.2020 | Release of new connection/load extension/reduction of industrial/NDS/DS connection in prescribed time limit. | 28.09.2020 | 464 KB | English | Download |
811 | Comml_AJ-811 | AVVNL/ACE(H.Q.)/SE(Comml)/XEN(C-II)/F./2020-21/ D. 1244 dated 28.09.2020 | Regarding verification of hazardous lines and shifting thereof. | 28.09.2020 | 620 KB | English | Download |
810 | Comml_AJ-810 | AVVNL/ACE(H.Q.)/SE(Comml)/XEN(C-II)/F./2020-21/ D. 1184 dated 23.09.2020 | Peak hours for banked Solar/Wind energy as per Rajasthan Solar Energy Policy 2019 & Rajasthan Wind & Hybrid Energy Policy 2019 | 23.09.2020 | 760 KB | English | Download |
809 | Comml_AJ-809 | AVVNL/ACE(H.Q.)/SE(Comml)/XEN(C-II)/F./2020-21/ D. 1037 dated 02.09.2020 | Regarding change of category before completion of one year from the date of release of connection. | 02.09.2020 | 275 KB | English | Download |
Auditor Report | 741 KB | English | Download | ||||
Calculation sheet | 159 KB | English | Download | ||||
808 | Comml_AJ-808 | AVVNL/CE(HQ)/XEN-I/F.57(F)/2020-21/D. 1017 | Recovery of Fuel Surcharge amount for Fourth Quarter of FY 2019-20. | 27.08.2020 | 335 KB | English | Download |
807 | Comml_AJ-807 | AVVNL/ACE(H.Q.)/SE(Comml)/XEN(C-II)/F./2020-21/ D. 53 dated 14.05.2020 | Amendment in detailed Guidelines & procedure for Net Metering and Grid connectivity of grid connected Rooftop & Small Solar photovoltaic Systems. | 14.05.2020 | 313 KB | English | Download |
806 | Comml AJ-806 | अविविनिलि/ मु. अ. (मुख्यालय)/ अ.अ.- II/ 2020-21/ प्रे-6067 | |
16.04.2020 | 754 KB | Hindi | Download |
805 | Comml AJ-805 | AVVNL/ACE (H.Q.)/XEN(C-II)/F./ /2020-21 D.6047 | 'Amnesty Scheme' for disconnected consumers of domestic and agriculture category (disconnected upto or prior to 31.03.2019) for realization of outstanding dues. | 03.04.2020 | 731 KB | English | Download |
804 | Comml AJ-804 | AVVNL/ACE (H.Q.)/SE (C)/XEN-I/F.57(F)/ /2019-20 D.5588 | TARIFF FOR SUPPLY OF ELECTRICITY-2020 | 17.02.2020 | 406 KB | English | Download |
803 | Comml AJ-803 | AVVNL/ACE (H.Q.)/SE (Comml.)/XEN (C-II)/F. /2019-20 D.5366 | 'Amnesty Scheme' for disconnected consumers of all categories(disconnectedupto or prior to 31.03.2019) for realization of outstanding dues. | 29-01-2019 | 297 KB | English | Download |
802 | Comml AJ-802 | AVVNL/CE (H.Q.)/XEN (C-II)/F. /2019-20 D.5156 | Re-connection of connections disconnected consequent upon vigilance checking. | 14-01-2020 | 2.1 MB | English | Download |
801 | Comml AJ-801 | अविविनिलि/ मु. अ. (मुख्यालय)/ अ.अ.- II/ 2019-20/ प्रे-1612 | कृषि उपभोक्ताओं के बकाया बिलों के भुगतान हेतु सरलीकृत योजना | 01-01-2020 | 540 KB | Hindi | Download |