STPS

SURATGARH THERMAL POWER STATION IS THE FIRST SUPER THERMAL PLANT OF RAJASTHAN.
IT HAS INSTALLED CAPACITY OF 1500 MW, WHICH IS HIGHEST IN THE STATE.

 

 

 

LOCATION

SURATGARH SUPER THERMAL POWER STATION IS LOCATED 27 KM FROM SURATGARH -15 KM FROM SURATGARH TO BIRADHWAL ON NH15,THEN 12KM IN EAST FROM NH15.IT IS HAVING EXTREME HOT & COLD CLIMATE AND TEMPERATURE VARIES BETWEEN -1 TO 50 ˚C

SANCTION OF SCHEMES (STAGE-I to V)

Stage

Unit No.

Capacity(MW)

Cost(Rs.Crore)

I

I & II

2x250

2300

II

III & IV

2X250

2057

III

V

1X250

753

IV

VI

1X250

1117

 

 

TOTAL

6227

COMMISSIONING TARGETS AND ACHIEVEMENTS

UNITS

ZERO DATE

TARGET

ACTUAL DATE

DATE OF COAL FIRING

DATE OF COMMERCIAL OPERATION

Remarks

UNIT-1

Jun-91

MAR-1997

10-MAY-1998

04-OCT-1998

01-FEB-1999

 

UNIT-2

Jun-91

SEP-2000

28-MAR-2000

07-JUN-2000

01-OCT-2000

COMMISSIONED 6 MONTH AHEAD OF SCHEDULE

UNIT-3

23-Jun-99

MAR-2002

29-OCT-2001

08-DEC-2001

15-JAN-2002

COMMISSIONED 6 MONTH AHEAD OF SCHEDULE

UNIT-4

23-Jun-99

SEP-2002

25-MAR-2002

17-JUN-2002

31-JUL-2002

COMMISSIONED 6 MONTH AHEAD OF SCHEDULE

UNIT-5

1-Feb-01

JUN-2003

30-JUN-2003

30-JUN-2003

19-AUG-2003

COMMISSIONED IN RECORD TIME OF 29 MONTH

UNIT-6

15-Jun-06

OCT-2008

31-MAR-2009

24-AUG-2009

30-DEC-2009

-

ACHIEVEMENTS

IT HAS ACHIEVED MANY MILESTONES SINCE COMMISSIONING OF ITS 1ST UNIT DESPITE BEING LOCATED AT PLACE WHERE CLIMATIC CONDITIONS ARE VERY ADVERSE.

1.Award

SINCE STARTING OF 1ST UNIT, IT IS GETTING AWARDS FROM GOVERNMENT OF INDIA CONSISTENTLY FOR ITS PERFORMANCE.FOR 1999-2000 SHIELD HAS BEEN GIVEN TO SSTPS FOR MERITORIOUS PRODUCTIVITY. FOR YEAR 2000-01, 2001-02, 2002-03 & 2003-04 SSTPS IS GIVEN MERITORIOUS PRODUCTIVITY GOLD SHIELD, AWARDED BY HON'BLE PRESIDENT OF INDIA DR. A. P. J. ABDUL KALAM ON 24-AUG-2004. HON'BLE PRIME MINISTER OF INDIA DR. MANMOHAN SINGH AWARDED THE SHIELD TO SSTPS ON 21-03-2007 FOR PERFORMANCE IN 2005-06.

2.Fly Ash Utilisation

SSTPS HAS ACHIEVED ALMOST 100% FLY ASH UTILIZATION IN 2010-11. WORKING MORE EFFICIENTLY AUXILIARY POWER CONSUMPTION HAS BEEN REDUCED FROM 9.16% IN 2009-10 TO 9.12% IN 2010-11. WE HAVE ALSO MANAGED TO REDUCE DEMURRAGE HOURS FOR UNLOADING OF COAL RAKES BY REMARKABLE 81% IN 2010-11 FROM 2009-10. IN 2009-10 NUMBER OF DEMURRAGE HOURS WERE 3787 WHILE FOR 2010-11 IT HAS BEEN REDUCED TO JUST 708 HOURS.

3.Mini-Micro Hydel Plant

FOR FINANCIAL YEAR 2010-11 THERE IS AN INCREASE OF 206 % IN TOTAL GENERATION BY MINI/MICRO HYDROELECTRIC PLANTS (UNDER SSTPS) FROM LAST YEAR 2009-10. GENERATION FOR 2010-11 IS 67.89 LAKH UNITS WHILE GENERATION FOR 2009-10 WAS 22.18 LAKH UNITS.

4.CSR

UNDER CORPORATE SOCIAL RESPONSIBILITY , BUS FACILITY HAS BEEN STARTED FROM SSTPS TOWNSHIP TO NEARBY VILLAGES ,ENABLING VILLAGE CHILDREN TO HAVE QUALITY EDUCATION IN KENDRIYA VIDYALAYA AND DAV SCHOOL SITUATED IN SSTPS TOWNSHIP

PERFORMANCE INDICES AT A GLANCE

Year

Total Generation (MU)

PLF (%)

% Aux. Cons.

Sp. Oil Cons. (ml/Kwh)

Sp. Coal Cons. (Kg/Kwh)

Station Heat Rate (Kcal/Kwh)

Fly Ash Utilisation

2001-2002

4112.540

85.04

9.31

1.56

0.607

2505

0.97

2002-2003

7145.676

88.94

9.18

1.07

0.614

2576

2.34

2003-2004

8186.633

80.74

9.37

0.98

0.607

2429

12.62

2004-2005

9362.319

85.50

9.30

0.83

0.635

2444

16.16

2005-2006

9951.223

90.88

9.15

0.64

0.613

2478

40.37

2006-2007

10205.589

93.20

9.16

0.53

0.624

2469

63.26

2007-2008

10222.515

93.10

9.12

0.59

0.634

2491

81.55

2008-2009

9740.606

88.96

9.19

0.77

0.669

2499

87.50

2009-2010

9192.409

79.94

9.16

1.02

0.669

2476

88.74

2010-2011

9409.777

71.61

9.12

1.340

0.665

2493

96.53

2011-2012

9735.59

81.61

8.79

0.85

0.65

2502

91.38

2012-2013

10570.321

80.44

9.05

1.06

0.645

2540

80.84

2013-2014

9409.017

71.61

9.06

0.86

0.679

2617

87.29

2014-15 10097.26 76.84 9.33 0.58 0.65     

2015-16
5902.80  44.80  10.52  1.33  0.65     

STATION PERFORMANCE

HIGHLIGHTS & ACHIEVEMENTS (2010-11)

ENVIRONMENTAL MEASURES

1. 100 % ASH UTILIZATION HAS BEEN ACHIEVED IN 2010-11 RESULTING IN CONSIDERABLE REDUCTION IN RAW WATER CONSUMPTION REQUIRED FOR DISPOSAL OF ASH.

2. DISPOSAL OF FLY ASH IS ENSURED THROUGH CLOSED CONTAINERS ONLY

3. GREEN BELT DEVELOPMENT IS BEING DONE AS PER ACTION PLAN TO ACHIEVE 33% COVER.

4. FLY ASH TRANSPORTATION IS PERMITTED IN CLOSED CONTAINERS ONLY

ENERGY CONSERVATION MEASURES

SWITCHING OF COOLING TOWER FANS & REDUCTION OF RAW WATER CONSUMPTION THROUGH UTILIZATION OF WASTE WATER FOR FLY ASH PREPARATION AND GREEN BELT DEVELOPMENT.

STRENGTHENING OF POWER EVACUATION SYSTEM

COMMISSIONING OF 400 KV STPS-BIKANER & 220 KV STPS- BHADRA FEEDERS.

DEPLOYMENT OF CISF

DEPLOYEMNT OF CISF FOR ENSURING SAFETY & SECURITY OF THE POWER STATION IN LINE WITH THE DIRECTIVES OF SECURITY AGENCIES.

CONCRETE ROAD AT RAYANWALI VILLAGE

CONSTRUCTION OF CEMENT CONCRETE ROAD AT RAYANWALI VILLAGE TAKEN UP BY CEMENT COMPANIES ON THE BEHEST OF SSTPS AUTHORITIES.

AWARDS BY G.O.I.

YEAR

Generation Award

1999-2000

MERITORIOUS PRODUCTIVITY - SHIELD & 3.74 LACS

2000-2005

MERITORIOUS PRODUCTIVITY GOLD SHIELD awarded by Hon'ble President of India Dr. A. P. J. Abdul Kalam on 24-Aug-2004

2005-2006

Shield awarded by Hon'ble Prime Minister of India Dr. Manmohan Singh on 21-3-2007

EXPANSION PLANS

SUPER CRITICAL UNITS 7 & 8

(1)

Proposed Capicity

2x660 MW

(2)

Location

SURATGARH(RAJASTHAN)

(3)

TOTAL PLANT AREA

360 HECTARES for Plant & 40 HECTARES for Colony

(4)

PROJECT COST

RS. 7920 CRORES

(5)

FUEL

PRIMARY FUEL: COAL

SECONDARY FUEL : HSD / HFO

(6)

FUEL REQUIREMENT

6.5 MTPA

(7)

SOURCE OF WATER :

INDRA GANDHI CANAL PROJECT

(8)

WATER ALLOCATION

60 CUSECS

(9)

ASH GENERATED

2.21 MTPA ON 34% ASH CONTENT COAL

(10)

ASH POND LOCATION

SOUTH WEST OF PLANT ABOUT 3.0 KM AWAY

 

(ALREADY EXISTING)

LAND SIZE : 576 HECTARES

(11)

STACK

TWIN FLUE STACK (275 METRE)

(12)

NEAREST RAILWAY STATION

BIRADHWAL