RGTPP

Ramgarh gas thermal power station is the first gas thermal power plant of Rajaisthan. The first unit was commissioned on dated 15-11-1994.

 

 

LOCATION

Ramgarh gas thermal power plant station is situated near village Ramgarh, 60 kms away from Jaisalmer. The first unit of 3 MW is not in operation now. The present installed capacity of the plant is 270.50 MW. 

Stage

Unit No.

Capacity (MW)

Cost (Rs. Crore)

Synchronising Date

I

Gas Turbine # 1

35.5

180

12.01.1996

II

Gas Turbine # 2

Unit No.

300

07.08.2002

Steam Turbine, STG # 1

37.5

25.04.2003

III

Gas Turbine # 3

110

640

20.03.2013

Steam Turbine, STG # 2

50

01.05.2014

Operational Performance of Plant

Particulars

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

 

Gross Generation (LU)

4041.440

4141.153

3486.782

3539.44

3028.85

5367.94

4979.06

6733.195

1267.83

(LU)

Plant Load Factor (%)

41.75%

42.78%

36.00%

36.57%

31.29%

55.30%

51.44%

52.92%

55.41%

Aux.Power Consumption (LU)

268.179

551.61

333.116

279.029

161.452

95.796

90.245

607.423

 

Gas Consumption (1000.SCM)

240483

248876

209782

213635

183482

297151

272967

398509

380000
                   

EXPANSION

GAS THERMAL POWER PROJECT- STAGE III

The Gas Unit of 110 MW commissioned on 20.03.2013 and the Steam Unit of 50 MW has been synchronized on dated 05.04.2014. At present activities for the COD of the 50 MW STG unit is under way. 

STAGE-III (Salient Features)

1.

Capacity

160MW

2.

Location

Ramgarh

3.

Total plant area

796 bigha,17 biswa

4.

Project cost

640 crores

5.

Fuel

GAS and HSD

6.

Source of water

Indra Gandhi canal

7.

Fuel required

9.5 lac. SCM per day

8

Water allocation

10.8 cusecs