CTPP

Chhabra Thermal Power Project is located near village Chowki Motipura in Tehsil Chabbra, Distt. Baran (Rajasthan) which is 22 Km from Chabbra Town ,10 Km from inter state border of Madya Pradesh, 147 Km from Kota. Plant site is well connected to State Highway-51 & located on Bina-Kota line of West Central Railway.

STAGE-I (Phase 1 & 2 )

Unit #1 (250MW) and Unit#2 (250 MW) of this project constructed under Stage-I (Phase-I) started commercial operation w.e.f. 11.06.2010 and 15.10.2011 respectively. Further Unit#3 (250 MW) constructed under under stage-I (Phase-II) started commercial operation operation w.e.f. 19.12.2013. Unit# 4(250 MW) is Commissioned on 30.06.14 and its commercial operation achieved on 30/12/14

Project Highlights:

(1)

Installed Capacity

2X250 MW Stage- I, Phase- I

2X250 MW Stage- I, Phase- II

(2)

Estimated Cost

2820 Crores (Phase- I)

3033 Crores (Phase- II)

(3)

Land Acquired

526 Hectares (Stage-I)

(4)

Height of chimney

220 Meter each for Phase-I & II

(5)

ESP Efficiency

99.89%

(6)

Coal Requirement and Linkage

5.0 Million Tons per year

Unit-1&2- SECL, Kobra (C.G.) through washery circuit.

Unit-3&4- Parsa East & Kante Basen Coal Blocks through Parsa & Kante Colleries Ltd., Ambikapur (C.G.)

(7)

Water Requirement

800 MCFT/ Year (38500 M3/ day)(For Phase I&II from nearby Parvati, Bethali & Hinglot Dam.

(8)

Power Evacuation

400KV /220 kv Switchyard with Inter-connecting Transformers (ICT) through 400KV Bhilwara, 400KV Hindaun, 400KV Adani and 220 KV Jhalawar & 200 KV Kawai-Dahara feeders.

(9)

Date of COD

Phase -I & II

Unit #1- COD achieved on 11.06.2010

Unit #2- COD achieved on 15.10.2011

Unit #3- COD achieved on 19.12.2013

Unit #4-COD achieved on 30.12.2014

(10)

Environmental Features

Zero discharge concept adopted

ETP & STP established. Re-cycled water utilization for green belt development.

100% (Approx.) Fly Ash Utilization by cement & near-by bricks industries.

OPERATIONAL PARAMETERS

Year

Gen(MU)

PLF(%)

SPCFC COAL CONSUMPTION

SPCFC OIL CONSUMPTION

AUX. CONSUMPTION

2010-2011

971.36

55.07

0.64

5.38

11.37

2011-2012

2260.96

70.50

0.66

3.15

11.60

2012-2013

2924.17

66.76

0.64

1.65

10.69

2013-2014

3158.449

63.22

0.66

2.54

10.63

2014-2015 4583.56 64.69

10.70

2.15 10.68
2015-2016 4473.89  50.93  .65  3.84  10.45 
 

SALIENT FEATURES OF 2X660 MW SUPERCRITICAL UNIT # 5 & 6 STAGE-II, PHASE-III

(1)

Location

At Chowki Motipura about 22 Km from Chabbra Town in Baran District of Rajasthan. The site lies between- North Latitudes 24 degree 24 inches and East Longitude 77 Degree 03 inches.

(2)

Nearest Railway Station

Motipura Chowki ( Between Beena- Kota Section)

(3)

Installed Capacity

2X660 MW Stage-II, Phase- III

(4)

Estimated Cost

7920 Crores Rs.

(5)

Land Acquired

total = 2802.06 Bigha in which 2361.02(382.35hq) private land and 441.05 Bigha (71.42hq) government land,   Total land- 453.99hq

(6)

Height of Chimney

275 Meter (Twin Flue)

(7)

ESP Efficiency

99.89%

(8)

Fuel Requirement

Coa l- 6.5 MTPA

Unit # 5 - Parsa East & Kante Basan Coal Block

Unit # 6 - Kante Basan Extension Coal Block.

HSD/FO - 11563 KL/Year (for both units)

(9)

Water Requirement

1570 MCFT/ YEAR

Lhasi Irrigation Project- 300MCFT

Parvan Irrigation Project- 1270 MCFT