Pugal PH-I and PH-II

This scheme comprises of two power houses with installed capacity of one unit of 1.5MW at PH-I and One Unit of 650KW at PH-II.The power house II was commissioned in july 1992 and PH-I in Oct.1994.

SALIENT FEATURES

    Power House-1 Power House-2
1. Installed Capacity 1 x 1.5 MW 1 x 0.650 MW
2. Location of Power House Near R.D 618.825 of Indira Gandhi main canal Near R.D 49.252 Pugal branch of Indira Gandhi main canal
3. Nearest Village Sattasar Distt.. Bikaner Dandi Distt..Bikaner
4. Nearest Rly. Station Bikaner(80Km) Bikaner(95Km)
5. Suppliers of main generating equipments M/s Jyoti Ltd. M/s Jyoti Ltd.
6. Civil Contractors of PH Building M/s RSBCC M/s Shiva. Construction Co.
7. Erector of main generating equipment M/s MKS Engineers M/s MKS Engineers
8. Consultantst CEA for electrical works& WAPCOS for civil works CEA for electrical works& WAPCOS for civil works
9. Designed Discharge

17.246 Cumecs

13.994 Cumecs

10. Designed head

9.73 M

5.48 M

11. Cement Consumption

2650 MT

1330 MT

12. Steel Consumption

560 MT

380 MT

13. Commissioning month Oct.94(Expect.) July’92
14. Planned annual generation 58.72 lacs Uint 326.84 lacs Uint
15. Cost and Expenditure on Scheme (Rs.)   650.70 lacs
  Original approved cost June,80 438.12 Lacs(including PH-I,PH-II)  
Revised Cost(1986 900.30 lacs
Latest Cost(Rs.) 11021.75 lacs
Expenditure till 31.3.93(Rs.) 753.17 lacs