S.No Name Start Date End Date Description Files
1 Hiring of vehicle at various offices under Circle SE(T&C), RVPNL, Jodhpur 12 July, 2016 22 July, 2016

Hiring of vehicle at various offices under Circle SE(T&C), RVPNL, Jodhpur

  • NIT-SE-VEHICLE.PDF
  • 2 Erection / dismantaling work of 132/33 KV 40/50 MVA Transfomer at 220 KV GSS RIIICO Sri Ganganagar

    Installation of 132/33 KV 40/50 MVA Transformer  in place of 132/33 KV 20/25 MVA Transformer...

    3 Aug. of Transformer at 220 KV GSS RIICO Sri Ganganagar 14 July, 2016 20 July, 2016

    Erection/dismantaling of 132/33 KV 40/50 MVA Tr. at 220 KV GSS RIICO Sri Ganganagar

  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • page5.pdf
  • 4 Painting of Structure at 132 KV GSS Sujangarh 13 July, 2016 27 July, 2016

    Painting work at 132 KV Sujangarh

  • Painting work 132 KV Sujangarh.PDF
  • 5 Yard cleaning at 132 KV GSS Sujangarh 13 July, 2016 27 July, 2016

    Yard cleaning at 132 KV GSS Sujangarh

  • Yard_cleaning at 132 KV Sujangarh.PDF
  • 6 Hiring of vehicle under SE(T&C), Barmer 25 July, 2016 26 July, 2016

    Hiring of vehicle under SE(T&C), Barmer

  • barmer.pdf
  • 7 Hiring of Vehicle under SE (T&C), Bikaner 5 July, 2016 2 August, 2016

    Hiring of Vehicle under SE (T&C), Bikaner for SE (T&C), Bikaner and XEN 220 KV GSS Gajner...

  • NIT Vehicle SE Bikaner.pdf
  • 8 Control Room & Yard cleaning at 220 KV GSS Sujangarh 12 July, 2016 26 July, 2016

    Control Room & Yard cleaning at 220 KV GSS Sujangarh

  • Cleaning at 220 KV GSS Sujangarh.pdf
  • 9 haring of car 16 August, 2016 31 March, 2017

    Haring of Car for SE ( T&C) RVPNL Sirohi w.e.f. 16/8/2016 to 31/3/2017

    10 Hiring of vehicle at ACE(MPT&S), Jodhpur 13 July, 2016 1 August, 2016

    Hiring of vehicle at  ACE(MPT&S), Jodhpur 

  • NIT ACE MPT&S JODHPUR1.pdf
  • 11 For routine patrolling of various EHV lines associated with 220 KV GSS Bikaner 8 July, 2016 19 July, 2016

    For routine patrolling of various EHV lines associated with 220 KV GSS Bikaner

  • Routine patrolling of various EHV Lines assocaited with 220 KV GSS Bikaner.pdf
  • 12 Complete repair of Voltas make AC at 220 KV GSS Bikaner 8 July, 2016 19 July, 2016

    Complete repair of Voltas make AC at 220 KV GSS Bikaner

  • Repair of AC.pdf
  • 13 Hiring of CAR at SE(T&C),Sirohi 6 July, 2016 26 July, 2016

    Hiring vehicle at SE(T&C),sirohi for 7.5 months

  • page1.pdf
  • page2.pdf
  • page1.pdf
  • 14 General cleaning and yard cleaning at 132 KV GSS Ratangarh 11 July, 2016 20 July, 2016

    General cleaning and yard cleaning at 132 KV GSS Ratangarh

  • Yard &Genaral 132 RTGH.PDF
  • 15 Hiring_vehicle_XEN(T&C)_Div_jodhpur 14 July, 2016 25 July, 2016

    Hiring_vehicle_XEN(T&C)_Div_jodhpur

  • MKS.PDF
  • 16 Cleaning_132KV_NPH_Jodhpur 15 July, 2016 30 July, 2016

    Cleaning_132KV_NPH_Jodhpur

  • NPH.pdf
  • 17 Cleaning_Switchyard_132KV_NPH_Jodhpur 15 July, 2016 30 July, 2016

    Cleaning_Switchyard_132KV_NPH_Jodhpur

  • NPH-1.pdf
  • 18 Hiring_vechile_SE(T&C)_kankani 18 July, 2016 27 July, 2016

    Hiring_vechile_SE(T&C)_kankani

  • KANKANI.PDF
  • 19 Hiring vehicle at 220 KV GSS Sanchore 15 July, 2016 26 July, 2016

    Hiring Vehicle at 220 KV GSS sanchore for 7.5 months

  • page1.pdf
  • page2.pdf
  • 20 hiring vehicle at AEN(T&C),Jalore 15 July, 2016 26 July, 2016

    Hiring vehicle at AEN(T&C),Jalore

  • page1.pdf
  • page2.pdf
  • 21
    22 Hiring vehicle at 220 KV GSS Pindwara 15 July, 2016 26 July, 2016

    Hiring vehicle

  • page1.pdf
  • 23 Yard cleaning work at 400 KV GSS ratangarh 15 July, 2016 28 July, 2016

    Yard cleaning work at 400 KV GSS ratangarh

  • Yard cleaning.PDF
  • 24 Shifting of lines at Barmer 15 July, 2016 22 July, 2016

    Shifting of line of 220 & 132 KV line passing over proposed medical college at Barmer

  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • page5.pdf
  • 25 Yard Cleaning work at 400 KV GSS Bikaner 20 July, 2016 29 July, 2016
  • Yard cleaning at 400KV GSS Bikaner.pdf
  • 26 Yard cleaning at 220 KV GSS Gajner 20 July, 2016 29 July, 2016
  • Yard cleaning work 220 Gajner.pdf
  • 27 Supply of Drinking water 18 July, 2016 28 July, 2016

    Supply of drinking water through water tankers at 400 KV GSS RVPN Akal, Jaisalmer

  • page1.pdf
  • page1.pdf
  • 28 Strengthening work of towers of LILO of 132 KV S/C Bikaner- Dulchasar line 22 July, 2016 5 August, 2016

    strengthening work of existing towers of LILO of 132 KV SIC Bikaner-
    Dulchasar line for 132 K...

  • Strengthening work of existing tower s of LILO of 132KV Bikaner-Dulchasar line.pdf
  • 29 Erection work of Tr. 22 July, 2016 29 July, 2016

    Erection work of transformer(+132/33 KV,40/50MVA-20/25MVA)

  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • 30
    31
    32 General cleaning works at 132KV GSS Mundsar 26 July, 2016 9 August, 2016
  • Yard cleaning of 132KV GSS Mundsar.pdf
  • 33 Switch yard cleaning 26 July, 2016 2 August, 2016

    Switch yard cleaning at 132 KV GSS Sumerpur

  • page1.pdf
  • page2.pdf
  • 34 Ext_Hiring_ZCE(T&C)_Jodhpur 8 July, 2016 4 August, 2016
  • ce.PDF
  • 35 Ext_Hiring_SE(T&C)_Kankani 30 June, 2016 5 August, 2016
  • kankani.PDF
  • 36 Switchyard_Cleaning_Sumerpur 26 July, 2016 2 August, 2016
  • SUMERPUR.pdf
  • 37 Cleaning_220_Jodhpur 12 July, 2016 27 July, 2016
  • jodhpur-1.PDF
  • jodhpur-2.PDF
  • 38 Maintenance of Bay Equipments, powerTransformer at 220 kv GSS Ratangarh 27 July, 2016 5 August, 2016

    Regarding work of maintenance of Bay Equipments power Transformers and Bus -Bars at
    220KV GSS...

  • maintenancof Bay Equipments powerTransformer at 220 kv GSS Ratangarh.PDF
  • 39 Extn_Hiring_SE(T&C)_Jodhpur 26 July, 2016 4 August, 2016
  • TENDER-SE.PDF
  • 40 Extn_Hiring_XEN(T&C)_Jodhpur 25 July, 2016 8 August, 2016
  • mks.PDF
  • 41
    42 Bay_maint_132_Pipar 29 July, 2016 9 August, 2016
  • pipar-final.pdf
  • 43 Yard Cleaning work at 220KV GSS Sujangarh 29 July, 2016 4 August, 2016

    Yard cleaning work at 220 KV GSS, Sujangarh for 2016-17.

  • Yard Cleaning work of 220KV Sujangarh.pdf
  • 44 Tree cutting of EHV lines 2 August, 2016 16 August, 2016

    Tree cutting of EHV line of 132 KV GSS Ramseen

  • page1.pdf
  • page2.pdf
  • 45 General Cleaning work at 220KV GSS Sujangarh 29 July, 2016 4 August, 2016

    General Cleaning work at 220KV GSS Sujangarh

  • General Cleaning work at 220KV GSS Sujangarh.pdf
  • 46 control room claening at 132 KV GSS Ramseen 2 August, 2016 9 August, 2016

    control room cleaning at 132 KV GSS Ramseen

  • page1.pdf
  • page2.pdf
  • page3.pdf
  • 47 School mini bus/Van at 220 KV GSS colony sirohi 2 August, 2016 16 August, 2016

    School mini bus/Van at 220 KV GSS colony sirohi for children

  • page1.pdf
  • page2.pdf
  • 48 Replacement of Insulator strings of 132 KV S/C Bhinasar-Gajner line 29 July, 2016 8 August, 2016
  • Replacement of Insulator strings of 132 KV SC Bhinasar-gajner line.pdf
  • 49 Extn_Hiring_SE(T&C)_Jodhpur 12 July, 2016 11 August, 2016
  • SE(T&C)ju.pdf
  • 50 Upkeeping_132_MBM_Jodhpur 1 August, 2016 8 August, 2016
  • MBM.pdf
  • 51 Yard Cleaning Work at 132KV GSS Sardarshahar 9 August, 2016 23 August, 2016

    Yard Cleaning Work at 132KV GSS Sardarshahar

  • Yard Cleaning Work 132KV Sardarshahar.pdf
  • 52 Modification_Tinwari_SSR_Line 8 August, 2016 15 August, 2016
  • tinwari.pdf
  • 53 Extn_NIT_Hiring_ZCE_T&C_JU 8 July, 2016 23 August, 2016
  • jodhpur.PDF
  • 54 Cleaning work at 132 KV GSS Sherara 8 August, 2016 19 August, 2016

    Regarding Control Room, Office Building and Rest
    Room Cleaning Work at 132 kV GSS, RVP ,Shere...

  • cleaning at 132 KV Sherara.pdf
  • 55 Dismentling & erection Bus Bar 12 August, 2016 26 August, 2016

    Dismentling & Erection work of 33 KV Bus Bar at 132 KV GSS Aburoad

  • page1.pdf
  • 56 Hiring of vehicle for 220KV Suratgarh 12 August, 2016 19 August, 2016

    Providing Taxi Permit Diesel Vehicle (Bolero/Jeep) with driver & Diesel

  • Vechile NIT Suratgarh.pdf
  • 57 Yard Cleaning work at 132 KV GSS Salasar (Churu) 12 August, 2016 27 August, 2016

    Yard Cleaning at 132 KV GSS Salasar (Churu) on CLRC rate as per G Schedule

  • Yard cleaning at 132KV GSS Salasar.pdf
  • 58 Const_Bay_220 KV GSS Bhawad 11 August, 2016 18 August, 2016
  • mittal.PDF
  • 59 General cleaning work at 220 KV GSS Tehndesar 16 August, 2016 25 August, 2016

    General cleaning work of control room & Associated Area at 220 KV GSS Tehndesar

  • General cleaning work at 220KV GSS Tehndesar.pdf
  • 60 Hiring of vehicle at XEN C&M Barmer 14 August, 2016 26 August, 2016

    Hiring of vehicle at XEN(C&M), Barmer

  • page1.pdf
  • page2.pdf
  • 61 Consultancy service for forest clearance case submission online of 132KV S/C Chhattargarh-Khajuwala line as per requirement MOEF 10 August, 2016 17 August, 2016

    Forest Clearance consultancy service for Establishing and measurement of Coordinate of boundary, ...

  • forest clearance case submission online .pdf
  • 62 Painting work at 132 KV GSS Aburoad 17 August, 2016 31 August, 2016

    Structures and Equipments Painting Work at 132 KV GSS Abu Road on CLRC

  • page1.pdf
  • page1.pdf
  • 63 Replacement of disc insulator change work at 132KV Gajner-Nokha Daiya-Pugal Road line 17 August, 2016 31 August, 2016

    Regarding Replacement of disc insulator change work at 132KV Gajner-Nokha Daiya-Pugal Road line o...

  • disc insulator change work .pdf
  • 64 Line_Patrolling_132_Sojat_City 19 August, 2016 29 August, 2016
  • sojat1-line.pdf
  • 65 Bay_Maint_132_Sojat_City 19 August, 2016 28 August, 2016
  • sojat1-bay.pdf
  • 66 Yard Cleaning work at 132 KV GSS Patlisar Fanta 20 August, 2016 3 September, 2016

    Yard Cleaning work at 132 KV GSS Patlisar Fanta for the Yr.2016-17

  • Yard Cleaning Patlisar.pdf
  • 67 Hiring of Vehicle under SE (MPT&S), Bikaner 17 August, 2016 27 August, 2016
  • Hiring of Vehicle SE MPT&S.pdf
  • 68 Hiring of Vehicle under XEN (MPT&S), Bikaner 17 August, 2016 27 August, 2016
  • Hiring of Vehicle XEN MPT&S.pdf
  • 69 Patrolling of EHV Lines at 220 KV GSS Bikaner 19 August, 2016 29 August, 2016
  • Patrolling 220 BKn.pdf
  • 70 Cleaning work at 220 KV GSS Hanumangarh 23 August, 2016 6 September, 2016
  • 220 hanumangarh.pdf
  • 71 Bay Maint at 132 KV GSS Mundsar 23 August, 2016 1 September, 2016
  • Bay maint.at Mundsar.pdf
  • 72 Replacement of Insulator String of 132 KV Bhinasar Gajner line 23 August, 2016 2 September, 2016
  • Bhinasar.pdf
  • 73
    74 CONTROL ROOM CLEANING_132 JAITARAN 23 August, 2016 7 September, 2016
  • Control room.PDF
  • 75 PATROLLING_LINE_132_JAITARAN 23 August, 2016 7 September, 2016
  • EHV Patrolling.PDF
  • 76 Transportation of material 26 August, 2016 2 September, 2016

    Transporation of material

  • Transportation of material at 400 KV GSDS BKN.pdf
  • 77 Hiring_vehicle_ZCE(T&C)_Jodhpur 26 August, 2016 31 August, 2016
  • consent.pdf
  • 78 Bay maintenance work at 220 KV GSS Sujangarh 30 August, 2016 9 September, 2016

    Maintenance work of Bay,Equipment,Transformer & Busbar at 220KV GSS Sujangarh

  • Bay_MTC_2016-17 220 Sujangarh.pdf
  • 79 Yard cleaning at 220 KV GSS Pindwara 2 March, 2018 5 September, 2016

    Yard cleaning and trenches cleaning at 220 KV GSS Pindwara

  • page1.pdf
  • 80 HIRING OF SCHOOL BUS AT 400 KV GSS BIKANER 1 September, 2016 7 September, 2016

    providing vehicle Minibus/MinivaniTATA magic having minimum capacity of 10 Seats for school
    g...

  • Vehicle for school children at 400 KV GSS BKN.pdf
  • 81 Hiring_vehicle_Sirohi_Circle 31 August, 2016 5 September, 2016
  • Sirohi.PDF
  • 82 Cleaning_132_Pratapnagar_Jodhpur 30 August, 2016 14 September, 2016
  • p.nagar.PDF
  • 83 Maintenance of Rest House at 220 Kv GSS Suratgarh 1 September, 2016 8 September, 2016

    Running & Maintenance of Rest House at220KV GSS Suratgarh

  • Rest House 220 KV GSS Suratgarh.pdf
  • 84 Hiring of Vehicle at 220 KV GSS hanumangarh 1 September, 2016 8 September, 2016
  • NIT Hiring of Vehicle at 220 KV GSS Hanumangarh.pdf
  • 85 Cleaning work at 132 KV GSS Churu 1 September, 2016 8 September, 2016
  • Cleaning work at 132 KV GSS Churu.pdf
  • 86 Bay Maintainence at 132 KV GSS Anoopgarh 1 September, 2016 9 September, 2016
  • Bay maint. at 132 KV GSS Anoopgarh.pdf
  • 87 Yard cleaning at 220 KV GSS Ratangarh 2 September, 2016 12 September, 2016
  • Yard cleaning at 220 KV GSS ratangarh.pdf
  • 88 General cleaning at 132 KV GSS Sri Ganganagar 1 September, 2016 14 September, 2016
  • General cleaning at 132 KV GSS Sriganganagar.pdf
  • 89 Yard Cleaning at 132 KV GSS Ratangarh 5 September, 2016 15 September, 2016
  • yard cleaning at 132 KV GSS ratangarh.PDF
  • 90 Yard Cleaning at 132 KV GSS sadulpur 5 September, 2016 12 September, 2016
  • Yard Cleaning at 132 KV GSS Sadulpur.docx2016.pdf
  • 91 NIT for transportation 5 September, 2016 19 September, 2016
  • NIT for tank transportation.pdf
  • 92 Yard Cleaning at 132 KV GSS Chandgoti 6 September, 2016 13 September, 2016
  • Yard cleaning at 132 KV GSS Chandgoti.pdf
  • 93 Repairing work of canter at 220 KV GSS Suratgarh 2 September, 2016 8 September, 2016
  • NIT Canter at 220 KV GSS Suratgarh.pdf
  • 94 Nit of Vehicle at 220 KV GSS Suratgarh 7 September, 2016 14 September, 2016
  • Vechile NIT 220 KV GSS Suratgarh.pdf
  • 95 Upkeeping_220KV GSS Bhadla 5 September, 2016 15 September, 2016
  • Upkeeping Tender-3.docx
  • 96 Shifting_Lines_220 KV Jhalamand 9 September, 2016 16 September, 2016
  • const_lilo_line_220-kv-gss-jahalamand
  • 97 Dismentelling_132/33 KV, 20/25 MVA TRF_Setrawa 9 September, 2016 19 September, 2016
  • dismentalling_132-33-kvtrf-sanwreej
  • 98 Aug. work at 220 KV GSS Dhorimanna 8 September, 2016 15 September, 2016
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • page5.pdf
  • 99 Installation capacitor bank at 132 KV GSS Juna mitha khera 8 September, 2016 15 September, 2016
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • page5.pdf
  • page6.pdf
  • page7.pdf
  • 100 Installation of capacitor bank at 132 KV GSS gadra 8 September, 2016 15 September, 2016
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • page5.pdf
  • page6.pdf
  • 101 Bay maintanance at 132 kv gSS manadawala 9 September, 2016 19 September, 2016
  • page1.pdf
  • page1.pdf
  • page1.pdf
  • 102 Corrigendum of school vehicle Bikaner 9 September, 2016 16 September, 2016

    Corrigendum of school vehicle for 400KV GSS Residential Colony Bikaner  

  • scan0884.pdf
  • 103 Restringing of earthwire work 9 September, 2016 23 September, 2016
  • NIT restringing earthwire.pdf
  • 104 Cleaning work at 132 KV GSS Sadulsahar 14 September, 2016 29 September, 2016
  • Cleaning work at 132 KV GSS Sadulsahar.pdf
  • 105 Bay Maintenance work at 132 KV GSS Bagra 8 September, 2016 19 September, 2016
  • Bay maintenace work at 132 KV GSS bagra.pdf
  • 106 Cleaning works at 132 KV GSS Rajiasar 12 September, 2016 26 September, 2016
  • Cleaning work at 132 KV GSS Rajiasar.pdf
  • 107 Painting work at 132 KV GSS Sadulpur 16 September, 2016 25 September, 2016
  • painting work at 132 KV GSS Sadulpur.pdf
  • 108 Consent for maintenance work at 400 KV GSS, Bikaner 15 September, 2016 29 September, 2016

    Consent for maintenance work at 400 KV GSS, Bikaner

  • scan0896.pdf
  • 109 Road_Light_Solar_Park_Bhadla 19 September, 2016 19 October, 2016
  • road_light_solarparkbhadla
  • 110 Maint_220_KV_GSS_Tinwari 15 September, 2016 22 September, 2016
  • maint_220_kv_gsstinwari
  • 111 Bay Maintainence work at 132 KV GSS lalamdesar 15 September, 2016 21 September, 2016
  • Lalamdesar.pdf
  • 112 Hiring of vehicle at 220 KV GSS Suratgarh 15 September, 2016 21 September, 2016
  • Hiring of Vehicle at 220 Suratgarh NIT.pdf
  • 113 NIT 33 KV Bay work at 132 KV GSS Bajju 20 September, 2016 26 September, 2016
  • NIT 33 kv bay work at 132 KV GSS Bajju.pdf
  • 114 Attending oil leakage at 132 KV GSS Jaisalmer 19 September, 2016 26 September, 2016

    Attending oil leakage at 132 KV GSS Jaisalmer

  • oil leakage12.pdf
  • 115 Maintainence work at 400 KV GSS Bikaner 20 September, 2016 5 October, 2016
  • Maintainence work at 400 KV GSS Bikaner.pdf
  • 116 Yard_Cleaning_132_KV_GSS_Bhopalgarh 16 September, 2016 26 September, 2016
  • BHOPALGARH.rar
  • 117 Patrolling_132_KV_GSS_Pali 15 September, 2016 25 September, 2016
  • pali-line.rar
  • 118 Bay_Maint_132 KV GSS Pali 15 September, 2016 25 September, 2016
  • pali-maint.rar
  • 119 Maint_220_KV_GSS_BHawad 21 September, 2016 1 October, 2016
  • BHAWAD.rar
  • 120 Bay maintenance at 220 KV GSS Jalore 15 September, 2016 30 September, 2016

    Bay maintenance at 220 KV GSS Jalore

  • Bay Maint. Work 220Jalore.pdf
  • 121 Cleaning works at 200 KV GSS Suratgarh 21 September, 2016 27 September, 2016
  • Cleaning works at 220 KV GSS Suratgarh.pdf
  • 122 Hiring_vehicle_ACE_MPTS_Jodhpur 20 September, 2016 30 September, 2016
  • prot.pdf
  • 123 Dismentelling_132_kalau 20 September, 2016 27 September, 2016
  • kalau.PDF
  • 124 Yard_Cleaning_132 KV GSS Pali 15 September, 2016 25 September, 2016
  • pali-1.Pdf
  • 125 Hiring of Vehicle at XEN ( T&C) RVPN Sirohi 23 September, 2016 28 September, 2016
  • XEN ( T&C) SRO.pdf
  • 126 Bay maintenance at 220 KV GSS sirohi 23 September, 2016 4 October, 2016
  • 324.pdf
  • 127 220 KV Line maintanance at 220 KV GSS sirohi 23 September, 2016 4 October, 2016
  • 325.pdf
  • 128 132 KV line maintenance at 220 KV GSS sirohi 23 September, 2016 4 October, 2016
  • 326.pdf
  • 129 Hiring_Air_Drier_Plant_400 KV GSS Jodhpur 18 September, 2016 26 September, 2016
  • NIB-2.pdf
  • 130 Transportation_Drier_400 KV GSS Jodhpur 18 September, 2016 26 September, 2016
  • NIB-3.pdf
  • 131 Corrigendum Hiring of Vehicle at SE (T&C), Bikaner 27 September, 2016 4 October, 2016
  • corrigendum vehicle bkn.pdf
  • 132
    133 Painting works at 400 KV GSS Bikaner 26 September, 2016 11 October, 2016
  • Paintaing work at 400 kv gss Bikaner.pdf
  • 134 Cleaning works at 220 KV GSS Hanumangarh 27 September, 2016 12 October, 2016
  • Cleaning works at 220 KV GSS hanumangarh.pdf
  • 135 Hiring_Vehicle_XDEN_RPM_Ju 27 September, 2016 3 October, 2016
  • 1.PDF
  • 136 Hiring_Vehicle_AEN_RPM_Ju 26 September, 2016 3 October, 2016
  • 2.PDF
  • 137 Hiring_Vehicle_AEN_RPN_Bkn 26 September, 2016 3 October, 2016
  • 3.PDF
  • 138 Bay_Maint_132_KV_GSS_Sumerpur 26 September, 2016 3 October, 2016
  • 4.1.pdf
  • 139 Maint_220_KV_GSS_Bali 27 September, 2016 4 October, 2016
  • bali.pdf
  • 140 Cleaning_132_KV_GS_Kharchi 28 September, 2016 13 October, 2016
  • KHARCHI.pdf
  • 141
    142 Hiring of Vehicle at SE (T&C), Bikaner 28 September, 2016 5 October, 2016
  • Hiring of Vehicle SE (T&C)
  • Bikaner.pdf
  • 143 Hiring of Vehicle at 220 KV GSS Gajner 28 September, 2016 5 October, 2016
  • NIT vehicle 220 KV Gajner 16-17.pdf
  • 144 Patrolling works of EHV Lines at 400 KV GSS Bikaner 28 September, 2016 5 October, 2016
  • Patrolling works of EHV Lines 400 KV GSS Bikaner.pdf
  • 145 Patrolling works of EHV Lines at 220 KV GSS Bikaner 28 September, 2016 5 October, 2016
  • Patrolling work of EHV Lines 220 KV GSS Bikaner.pdf
  • 146 Revised Tender for bay work at 132 KV GSS Bajju 26 September, 2016 3 October, 2016
  • Revised Tender Notice AEN II T&C BKN.pdf
  • 147 Cleaning works at 220 KV GSS ratangarh 28 September, 2016 6 October, 2016
  • General cleaning at 220 KV GSS Ratangarh.PDF
  • 148 Cleaning works at 132 KV GSS ratangarh 28 September, 2016 7 October, 2016
  • Cleaning works at 132 KV GSS Ratangarh.PDF
  • 149 Cleaning_220_KV_GSS_BHOPALGARH 30 September, 2016 10 October, 2016
  • Bhopalgarh.docx
  • 150 Augmentation work at Dhorimanna 27 September, 2016 6 October, 2016
  • AUG DHN.pdf
  • 151 NIT Transportation XEN T&C Hanumangarh 3 October, 2016 13 October, 2016
  • NIT-2(Transportation) .pdf
  • 152 NIT Vehicle 220 KV GSS padampur 1 October, 2016 7 October, 2016
  • NIT Vehicle Padampur.pdf
  • 153 NIT for Vehicles under SE (T&C), Kakani 30 September, 2016 13 October, 2016
  • NIT for Vehicles.pdf
  • 154 NIT Vehicle 220 KV GSS Nokha 5 October, 2016 13 October, 2016
  • NIT Vehicle 220 Nokha.pdf
  • 155 NIT for Vehicle ZCE (T&C), Jodhpur 3 October, 2016 10 October, 2016
  • 031016-3214.PDF
  • 156 Yard Cleaning at 132 KV GSS Bhopalgarh 6 October, 2016 17 October, 2016
  • yard cleaning at 132 KV GSS Bhopalgarh.pdf
  • 157 NIT for transportation of TR SE (T&C), Ratangarh 9 October, 2016 25 October, 2016
  • NIB and spec.pdf
  • 158 Cleaning works at 132 KV GSS Bhadra 29 September, 2016 21 October, 2016
  • General cleaning works at 132 KV GSS Bhadra.pdf
  • 159 Removal of Soil/sand from below EHV line 10 October, 2016 17 October, 2016
  • NIT.pdf
  • 160 Patrolling of 400 KV EHV line at 400 KV GSS Barmer 10 October, 2016 17 October, 2016
  • NIT2.pdf
  • 161 Limited Tender SE T&C Bikaner 7 October, 2016 14 October, 2016
  • Linited tender SE Bikaner.pdf
  • 162 Limited Tender 400 KV GSS Bikaner 7 October, 2016 14 October, 2016
  • Limited tender 400 kv Bikaner.pdf
  • 163 Transportation_of_Transformer_from_reodar_to_sirohi 10 October, 2016 21 October, 2016
  • transtport.pdf
  • 164 Ext_Hiring_vehicle_SE(T&C),Kankani 10 October, 2016 18 October, 2016
  • kankani.pdf
  • 165 CORRIGENDUM_HIRING_VEHICLE_SE(T&C)KANKANI 1 October, 2016 13 October, 2016
  • kankani-new.pdf
  • 166 LED NIT at 220 KV GSS Pindwara 13 October, 2016 19 October, 2016
  • page1.pdf
  • 167 Cleaning_132__Piparcity 13 October, 2016 20 October, 2016
  • PIPAR-CITY.pdf
  • 168 control room cleaning at 132 KV GSS Mandawala 10 October, 2016 17 October, 2016
  • NIT 01.pdf
  • 169 Hiring_Vehicle_RPM_Jodhpur 13 October, 2016 20 October, 2016
  • rpm-1.pdf
  • 170 Bay_Maint_220_KV_Bhopalgarh 13 October, 2016 3 November, 2016
  • BHOPALGARH.pdf
  • 171 Switchyard_Cleaning_Pipaliyakalan 13 October, 2016 20 October, 2016
  • subassets
  • 172 supply of raw water at 400 jaisalmer 13 October, 2016 21 October, 2016
  • 532.pdf
  • 173 gseneral cleaning work at 400 kv gss jaisalmer 13 October, 2016 21 October, 2016
  • 533.pdf
  • 174 NIT Vehicle AEN RPM Bikaner 17 October, 2016 25 October, 2016
  • AEN RPM BKN Vehicle NIT.pdf
  • 175 Bay_Maint_132 KV GSS CHB 18 October, 2016 25 October, 2016
  • Bay-Maint.pdf
  • 176 General_Cleaning_132 KV GSS CHB 18 October, 2016 25 October, 2016
  • Cleaning.pdf
  • 177 Yard_Cleaning_132 KV GSS CHB 18 October, 2016 25 October, 2016
  • Switch Yard.pdf
  • 178 Dismentelling_Shunt_reactor_220 KV GSS BASNI 18 October, 2016 28 October, 2016
  • Reactor.pdf
  • 179 Supply of yard light items at 400 KV GSS Bikaner 18 October, 2016 24 October, 2016
  • Supply of yard lights at 400 Bikaner.pdf
  • 180 Transportation_Shunt_Reactor_220 KV GSS Basni 18 October, 2016 3 November, 2016
  • Transportation.doc
  • 181 NIT 80 and 81 of Sirohi Circle 18 October, 2016 7 November, 2016
  • Transportation.pdf
  • 182 General cleaning work at 132 KV GSS Chandan 17 October, 2016 24 October, 2016
  • combinepdf (1).pdf
  • 183 Transportation of Transformer Accessories 19 October, 2016 27 October, 2016
  • Transportation of Tr. Accesories.pdf
  • 184 Transportation of Transformer 19 October, 2016 27 October, 2016
  • Transp. of Transformer.pdf
  • 185 General Cleaning works at 132 KV Jokhasar 19 October, 2016 31 October, 2016
  • Yard cleaning jokhasar.pdf
  • 186 Supply & Paintaing of Structure and equipment at 400 KV Bikaner 21 October, 2016 3 November, 2016
  • Supply & Painting of structure at 400 KV GSS Bikaner.pdf
  • 187 General Cleaning works at 400 KV GSS Ratangarh 21 October, 2016 27 October, 2016
  • Cleaning work at 400 Kv GSS Ratangarh.pdf
  • 188 Oil filtration of transformer at 132 KV GSS Reodar 21 October, 2016 28 October, 2016
  • oil.pdf
  • 189 patrolling of line 20 October, 2016 3 November, 2016
  • nit.pdf
  • 190 Hiring of Vehicle at 220 KV GSS Badnu 20 October, 2016 27 October, 2016
  • Hiring Vehicle 220 Badnu.pdf
  • 191 Hiring_Air_Dryer_Jodhpur 26 October, 2016 2 November, 2016
  • J-1.pdf
  • 192 Cleaning_Switch Yard_132KV GSS PS-8 26 October, 2016 2 November, 2016
  • J-2.pdf
  • 193 Hiring_vehicle_Bhadla_Circle 27 October, 2016 3 November, 2016
  • bhadla.docx
  • 194 Tender for 132 KV GSS Kitasar and associated lines 26 October, 2016 3 November, 2016
  • Kitasar Tender.pdf
  • 195 Hiring vehicle for SE(T&C) Sirohi 27 October, 2016 6 November, 2016
  • Consent.pdf
  • 196 Extn_Dismentaling_Reactor_220 KV GSS BASNI 28 October, 2016 10 November, 2016
  • TN-13.pdf
  • 197 Hiring of Vehicle at 220 KV GSS Padampur 27 October, 2016 3 November, 2016
  • Limited Tender for Vehicle Padampur (1).pdf
  • 198 Hiring_Vehicle_RCAO_Jodhpur 27 October, 2016 4 November, 2016
  • HIRING-RCA0.pdf
  • 199 Tender for Const of 132 KV GSS Kitasar 28 October, 2016 11 November, 2016
  • Tender 132 KV GSS Kitasar.pdf
  • 200 Tender for LILO Line for 132 KV GSS Kitasar 28 October, 2016 11 November, 2016

    LILO of 132 Sri Dungargarh-Ratangarh line for 132 KV GSS Kitasar

  • Tender for LILO SRI Dungargarh-Ratanagrah line for 132 KV GSS Kitasar.pdf
  • 201 Const._132 KV GSS Sangar 2 November, 2016 11 November, 2016
  • GSS.pdf
  • 202 Line_for 132 KV GSS Sangar 2 November, 2016 11 November, 2016
  • LINE.pdf
  • 203 Painting of structures & equipments at 220 KV GSS Sri Ganganagar 3 November, 2016 18 November, 2016
  • painting case SGNR.pdf
  • 204 NIT Hiring of Vehicle SE 400 KV GSS Ratangarh 3 November, 2016 11 November, 2016
  • Hiring of Vehicle 03.11.20160001.pdf
  • 205 Ext_NIT_SE(T&C)Bhadla 8 November, 2016 8 November, 2016
  • ext_NIT.jpg
  • 206 Structure_Painting_220 KV GSS Bhopalgarh 4 November, 2016 14 November, 2016
  • BHOP....docx
  • 207 Yard Cleaning work at 132 KV GSS Salasar 7 November, 2016 13 November, 2016
  • Yard Cleaning Salasar.pdf
  • 208 GSS and Line Maintenance at 220 KV GSS Amarsagar 7 November, 2016 17 November, 2016
  • Maintenance of GSS.pdf
  • Mintenance of lines.pdf
  • 209 Upkeeping_132 KV GSS Mathania 7 November, 2016 17 November, 2016
  • MATHANIA.pdf
  • 210 Yard Cleaning at 132 KV GSS khajuwala 10 November, 2016 17 November, 2016
  • yard cleaning khajuwala.pdf
  • 211 NIT Vehicle 220 KV GSS padampur 17 November, 2016 28 November, 2016
  • Limited Tender No. 3 for Vehicle Padampur .pdf
  • 212 Purchase_Batteries_DG_Set 18 November, 2016 25 November, 2016
  • NIT 15.PDF
  • 213 Supply_HPSV Ballast_Cap_Tube Light 18 November, 2016 28 November, 2016
  • NIT 16.PDF
  • 214 Yard cleaning & 132 KV CB replacement work at 132 KV GSS Pokran 17 November, 2016 28 November, 2016
  • yard.pdf
  • CB.pdf
  • 215 Office cleanig work at 132 GSS Jaisalmer 17 November, 2016 27 November, 2016
  • mail 132kv gss jsm.pdf
  • 216 Yard Cleaning at 132 KV GSS Sri Vijaynagar 22 November, 2016 30 November, 2016
  • yard cleaning Vijaynagar.pdf
  • 217 Hiring_Vehicle_RCAO_Jodhpur 18 November, 2016 28 November, 2016
  • vehicle-rcao.PDF
  • 218 Attending_Oil_Leakage_220 KV GSS Bhawad 21 November, 2016 8 December, 2016
  • leakage.PDF
  • 219 Yard_Cleaning_132 KV GSS Osiya 21 November, 2016 1 December, 2016
  • yard cleaning 2016-17.pdf
  • 220 General_Cleaning_Sadul_Shahar 22 November, 2016 3 December, 2016
  • GEN-CLEAN.pdf
  • 221 Yard_Cleaning_Sadul_Shahar 22 November, 2016 3 December, 2016
  • YARD-CLEAN.pdf
  • 222 Attending_Oil_Leakage_Padampur 23 November, 2016 1 December, 2016
  • OL-2.pdf
  • OL-1.pdf
  • 223 Hiring of Vehicle at 220 KV GSS hanumangarh 24 November, 2016 2 December, 2016
  • NIT Vehicle 220 Hanumangarh.pdf
  • 224 Yard cleaning at 132 KV GSS Raisinghnagar 21 November, 2016 30 November, 2016
  • Yard cleaning Raisinghnagar.pdf
  • 225 Extension of NIT 220 KV Padampur 29 November, 2016 6 December, 2016
  • Extension of NIT No. 3 FY 2016-17 220 Padampur.pdf
  • 226 Oil Filtration work at 132 KV Parasneu 22 November, 2016 1 December, 2016
  • Oil filtartion work at 132 KV Parasneu.pdf
  • 227 Yard_Cleaning_220 KV GSS Bhawad 28 November, 2016 9 December, 2016
  • bhawad-1.pdf
  • bhawad-2.pdf
  • 228 TRANSPORTATION OF MATERIAL FROM ACOS JODHPUR TO 132 KV GSS SANGAD 28 November, 2016 7 December, 2016
  • 381.pdf
  • 229 PATROLLING & TREE CUTTING AT 400 KV GSS BARMER 30 November, 2016 5 December, 2016
  • patrolling & tree cutting.pdf
  • 230 GENARAL & YARD CLEANING AT 400 KV GSS BARMER 29 November, 2016 6 December, 2016
  • GENERAL CLEAN.pdf
  • YARD CLEAN.pdf
  • 231 NIT Hiring of Vehicle at 220 KV GSS Nokha 1 December, 2016 7 December, 2016
  • tender of Hiring of vehicle at 220 Nokha.pdf
  • 232 Yard Cleaning at 220 KV GSS Bhadra 1 December, 2016 10 December, 2016
  • Covering & G schedule For Yard Ceaning Works at bhadra.pdf
  • 233 CR cleaning woek at 220 KV GSS Pindwara 2 December, 2016 12 December, 2016
  • CR Cleaning tendar notice.pdf
  • 234 Cleaning works at 132 KV GSS Pugal Road 2 December, 2016 9 December, 2016
  • Cleaning work at 132 KV GSS Pugal Road.pdf
  • 235 Tr oil filtration work at 132 KV GSS parasneu 2 December, 2016 9 December, 2016
  • Tr. Oil Filteration at Parasneu.pdf
  • 236 Corrigendum_Oil Leakage_Trf_220 KV GSS BHAWAD 21 November, 2016 9 December, 2016
  • bhawad-letter.jpg
  • 237 yard cleaning work at 132 KV GSS Ajasar 5 December, 2016 13 December, 2016
  • New Doc 43.pdf
  • 238 Extension of NIT Hiring of Vehicle Ratangarh 2 December, 2016 9 December, 2016
  • Extension of Hiring of Vehicle .pdf
  • 239 General Cleaning works at 132 KV GSS Sadul Sahar 5 December, 2016 12 December, 2016
  • NIT FOR GENERAL CLEANING Sadul Sahar.pdf
  • 240 General Cleaning_132 KV GSS Tagorenagar 30 November, 2016 11 December, 2016
  • tagorenagar.pdf
  • 241 Hiring Vehicle 220 KV GSS Bali 7 December, 2016 21 December, 2016
  • BALI.pdf
  • 242 Yard Cleaning at 132 KV GSS Jokhasar 8 December, 2016 22 December, 2016
  • Yard Cleaning at Jokhasar.pdf
  • 243 General Cleaning at 220 KV GSS Bhadla 6 December, 2016 17 December, 2016
  • BHADLA-1.pdf
  • 244 Bay Maint at 220 KV GSS Bhadla 6 December, 2016 17 December, 2016
  • BHADLA-2.pdf
  • 245 Hiring of Vehicle NIT XEN MPT&S Hanumangarh 9 December, 2016 19 December, 2016
  • Hiring of Vehicle NIT XEN MPTS Hanumangarh.pdf
  • 246 NIT Vehicle Ratangarh 9 December, 2016 16 December, 2016
  • NIT No. 07-2016-17 Ratangarh.pdf
  • 247 Cancellation of NIT 9 December, 2016 9 December, 2016
  • NIB no 04 Cancellation.pdf
  • 248 Refiling of Fire Fightning Equipments at 400 KV GSS Ratangarh 13 December, 2016 22 December, 2016
  • fire fighting 400KV RTGH.pdf
  • 249 Const_33KV Bay_132 KV GSS Tagore Nagar 15 December, 2016 30 December, 2016
  • kak-kan.pdf
  • 250 supply of Double pole change over switch disconnector 13 December, 2016 22 December, 2016
  • NIT pind.pdf
  • Corrigendum.pdf
  • 251 NIT 08 (2016-17) 13 December, 2016 4 January, 2017
  • NIT 08.pdf
  • 252 NIT 09(2016-17) 13 December, 2016 4 January, 2017
  • NIT 09.pdf
  • 253 NIT 06(2016-17) 13 December, 2016 4 January, 2017
  • NIT 06.pdf
  • 254 NIT 07(2016-17) 13 December, 2016 4 January, 2017
  • NIT 07.pdf
  • 255 132 KV Bay at 220 KV GSS Bhawad 13 December, 2016 24 December, 2016
  • NIT 16 Bay Bhawad.pdf
  • bay bhawad.pdf
  • 256 Extension of NIT for Hiring of Vehicle 16 December, 2016 26 December, 2016
  • Ext of date for Hiring of vehicle.pdf
  • 257 General Cleaning works at 132 KV GSS Khajuwala 16 December, 2016 23 December, 2016
  • g schedule 132 khajuwala.pdf
  • 258 Trf Erection at 132 KV GSS Sankad 16 December, 2016 29 December, 2016
  • j-1.pdf
  • j-2.pdf
  • 259 Attending Oil Leakage at 220/132 KV 50 MVA Trf at 220 KV GSS Bhopalgarh 16 December, 2016 29 December, 2016
  • bh-1.jpg
  • bh-2.jpg
  • 260 Str. & Equipt. painting work at 220 KV GSS Bhopalgarh 16 December, 2016 27 December, 2016
  • b-1.jpg
  • b2.jpg
  • b3.jpg
  • 261 Attending oil leakage of transformer at 132 KV GSS Ranasar 16 December, 2016 22 December, 2016
  • NIT IMG_20161216_0003.pdf
  • 262 NIT Hiring of Vehicle 220 kv GSS Suratagrh 16 December, 2016 23 December, 2016
  • Vehicle Consent Suratgarh.pdf
  • 263 Hiring of Vehicle at 220 KV GSS Bhadra 16 December, 2016 23 December, 2016
  • Hiring Of Vehicle 220 Bhadra.pdf
  • 264 NIT for restringing work at 132 KV GSS Rajiasar 19 December, 2016 28 December, 2016
  • pdf EW.pdf
  • 265 NIT for fixing vibration damper 19 December, 2016 28 December, 2016
  • pdf VD.pdf
  • 266 Erection work at 220 KV GSS Pali 21 December, 2016 6 January, 2017
  • ka-1.pdf
  • 267 Erection work at 132 KV GSS Sojat City 21 December, 2016 6 January, 2017
  • ka-2.pdf
  • 268 Painting work at 400 KV GSS Barmer 19 December, 2016 26 December, 2016
  • New Doc 35.pdf
  • 269 Printing Logsheet at 220 KV GSS Pindwara 20 December, 2016 27 December, 2016
  • 2. NIT.pdf
  • 270 Attending oil leakagae at 132 KV GSS sadul sahar 21 December, 2016 28 December, 2016
  • NIT FOR ATTEND OIL LEAKAGE.pdf
  • 271 NIT For Vehicle AEN T&C Hanumnangarh 20 December, 2016 27 December, 2016
  • NIT vehicle hiring under aen(T&C) hmh.pdf
  • 272 NIT Hiring of Vehicle SE (T&C) Hanumangarh 21 December, 2016 27 December, 2016
  • D 995.pdf
  • 273 Purchase Stationery Items XEN(T&C), Jodhpur 21 December, 2016 30 December, 2016
  • NIT stationery.JPG
  • 274 Erection of 33 KV Bays (2 nos) at 132 KV GSS Sanwreej 21 December, 2016 30 December, 2016
  • NIT sanwareej.JPG
  • G schedule-1.JPG
  • G Schedule-2.JPG
  • G Schedule-3.JPG
  • 275 NIT for Vehicle at 220 KV GSS Suratagrh 26 December, 2016 2 January, 2017
  • 220 suratgrah.pdf
  • 276 Extension of NIT Vehicle at XEN (MPT&S), Hanumangarh 26 December, 2016 3 January, 2017
  • Ext of date for Hiring of Vehicle.pdf
  • 277 Printing of Logsheet at 132 KV GSS Swroopganj 26 December, 2016 4 January, 2017
  • NIT SWG.pdf
  • 278 NIT Hiring of Vehicle at AEN-I (T&C), Ratangarh 24 December, 2016 30 December, 2016
  • NIT Hiring of Vehicle AEN C&M Ratngarh.pdf
  • 279
    280 Yard Cleaning at 132 KV GSS PALI 26 December, 2016 4 January, 2017
  • page1.pdf
  • page1.pdf
  • 281 NIT for Hiring of Vehicle at 220 KV GSS Bhadra 27 December, 2016 3 January, 2017
  • NIT 01 hiring vehicle at 220 Bhadra.pdf
  • 282 Painting work at 132 KV GSS Amarpurathedi 28 December, 2016 11 January, 2017
  • Amarpura thedi.pdf
  • 283 General cleaning works at 132 KV GSS Sri Ganganagar 28 December, 2016 11 January, 2017
  • yard cleaning at 132 SGNR.pdf
  • 284 NIT Vehicle AEN (T&C), Hanumangarh 28 December, 2016 4 January, 2017
  • NIT 01 of AEN TnC HMH for Hiring vehicle.pdf
  • 285 NIt 11 & 12 at 400 KV GSS Jaisalmer 26 December, 2016 4 January, 2017
  • NIt 11.pdf
  • nit 12.pdf
  • 286 General work at 132 KV GSS BArmer 29 December, 2016 4 January, 2017
  • 132 barmer.pdf
  • Barmer.pdf
  • 287 Hiring of Vehicle for AEN(MPT&S) RVPN Sirohi 3 January, 2017 10 January, 2017
  • NIT Hiring of Vehicle.pdf
  • 288 Hirirng of vehicle for AEN(MPT&S) RVPN Barmer 3 January, 2017 11 January, 2017
  • Tender Hiring BMR.pdf
  • 289 Maintenance work at 220 KV GSS Ramgarh 2 January, 2017 12 January, 2017
  • Scan10002.PDF
  • 290 hiring of vehicle AEN(cluster) Ramseen & Sanakd 4 January, 2017 11 January, 2017
  • Vehicle cluster.pdf
  • 291 Transportation of GSS Structure material from 220KV GSS Pindwara (Sirohi), to AEN (M&F), RVPNL, Heerapura, Ajmer Road, Jaipur (approx. 450 KM. 4 January, 2017 13 January, 2017
  • NIT & H-schedule.pdf
  • 292 Hiring of Vehicle at 220 KV GSS Nokha 4 January, 2017 11 January, 2017
  • Tender Hiring of vehicle 04.01.17 nokha.pdf
  • 293 Supply of HPSV Lamps,Ballast......at 400 KV GSS JODHPUR 6 January, 2017 14 January, 2017
  • NIT1.pdf
  • 294 Painting of 400/220/132 KV, 315 MVA Trf at 400 KV GSS Jodhpur 6 January, 2017 14 January, 2017
  • NIT-19.pdf
  • 295 Fabrication of Cross Arm (AEN-T&C-Dechu) 9 January, 2017 26 January, 2017
  • AEN-DECHU-1.pdf
  • 296 Erection of 220 KV Shunt Reactor at 220 KV GSS Ramgarh 9 January, 2017 20 January, 2017
  • Scan1.PDF
  • 297 Oil filtration of Tr. at 132 KV GSS Sankad 10 January, 2017 16 January, 2017
  • NIT No. 3 for filteration at sankad.pdf
  • 298 NIT Hiring of Vehicle SE (T&C), Bikaner 10 January, 2017 18 January, 2017
  • NIT Vehicle SE.pdf
  • 299 Fixing work of vibration damper 9 January, 2017 20 January, 2017
  • d391.pdf
  • 300 Restringing work of Earth wire 9 January, 2017 20 January, 2017
  • d390.pdf
  • 301 Painting work at 132 KV GSS Sri Ganganagar 11 January, 2017 25 January, 2017
  • painting case.pdf
  • 302 Supply of pole and spare part of CGL make of SF6 at 132 KV GSS Undoo 11 January, 2017 19 January, 2017
  • pole cg.pdf
  • spare cg.pdf
  • 303 Emergency stringing work for const. of LILO 220 KV D/C Ramgar-dechu 11 January, 2017 16 January, 2017
  • Scan10005.PDF
  • 304 Painting work at 132 KV GSS Salasar 11 January, 2017 21 January, 2017
  • Yard Painting.pdf
  • Paint Structure Consent1.pdf
  • 305 yard cleaning at 132 KV GSS Salasar 16 January, 2017 26 January, 2017
  • Yard Cleaning.pdf
  • 306 General cleaning at 132 KV GSS Sheo & Undoo 13 January, 2017 21 January, 2017
  • New Doc 68.pdf
  • New Doc 69.pdf
  • 307 Installation of Trf at 132 KV GSS Napasar 17 January, 2017 31 January, 2017
  • BIKANER.pdf
  • 308 Hiring of vehicle for XEN(T&C),Hanumangarh 17 January, 2017 23 January, 2017
  • NIT 03 2016-17 (1).pdf
  • 309 Supply of spare parts (Arewa Make & Spare) at 400 KV GSS Barmer 18 January, 2017 24 January, 2017
  • New Doc 7.pdf
  • 310 General cleaning at 132 KV GSS Mahloo 19 January, 2017 26 January, 2017
  • mahloo clrc pdf.pdf
  • 311 Bay maint at 400 KV GSS AKAL 20 January, 2017 27 January, 2017
  • NIT 15 AKAL.pdf
  • 312 Const of 2*33 kv bay at 132 KV GSS Pugal Road 18 January, 2017 30 January, 2017
  • 33 kv bay work.pdf
  • 313 Transportation of steel structures 18 January, 2017 30 January, 2017
  • tensporttation.pdf
  • 314 NIB No 5 23 January, 2017 10 February, 2017
  • Spec NIB 05(2016-17).pdf
  • 315 NIB No 6 23 January, 2017 10 February, 2017
  • Spec NIB 06(2016-17).pdf
  • 316 Cleaning works at 132 KV GSS Raisinghnagar 16 January, 2017 31 January, 2017
  • opentender.pdf
  • 317 NIT For Vehicle XEN T&C Hanumangarh 24 January, 2017 31 January, 2017
  • NIT 03 2016-17.pdf
  • 318 Yard cleaning works at 220 KV GSS Udyogvihar 25 January, 2017 31 January, 2017
  • Acceptance for yard cleaning works at 220 KV GSS Riico SGNR.pdf
  • 319 General cleaning works at 220 KV GSS Udyog Vihar 25 January, 2017 31 January, 2017
  • Acceptance for general cleaning works at 220 KV GSS Riico SGNR.pdf
  • 320 132 KV Bay work at 220 KV GSS AAU 25 January, 2017 2 February, 2017
  • A1.JPG
  • A2.JPG
  • A3.JPG
  • A4.JPG
  • 321 Bay maintenance at 132 GSS Mahaloo 25 January, 2017 1 February, 2017
  • mahloo maintenance clrc pdf.pdf
  • 322 NIT 13 27 January, 2017 6 February, 2017
  • NIT13.pdf
  • 323 NIT 14 27 January, 2017 6 February, 2017
  • NIT14.pdf
  • 324 NIT 15 27 January, 2017 6 February, 2017
  • NIT 15.pdf
  • 325 NIT AEN T&C Hanumangarh 24 January, 2017 1 February, 2017
  • aen tnc hmgh.pdf
  • 326 Emergency Stringing worl< for Const of One Circuit LILO from 220Ky D/C Ramgarh-Dechu line at 220KV GSS Amarsagar 27 January, 2017 6 February, 2017
  • Scan10001.PDF
  • 327 NIT Hiring of Vehicle SE (T&C), Hanumangarh 30 January, 2017 14 February, 2017
  • d 1166 NIT.pdf
  • 328 Hiring of Vehicle for AEN(Cluster), Dechu 25 January, 2017 2 February, 2017
  • m-1.JPG
  • m-2.JPG
  • m-3.JPG
  • 329 Yard Cleaning at 132 KV Sojat City
  • page1.pdf
  • page1.pdf
  • 330 Mainatainence of Erector Hostel at 400 KV GSS Bikaner 13 January, 2017 2 February, 2017
  • NIT Hostel.pdf
  • 331 Cleaning work at 132 KV GSS Salasar 31 January, 2017 9 February, 2017
  • General Cleaning salasar.pdf
  • 332 Extension of NIT for Hiring of Vehicle of XEN (T&C), Hanumnagarh 31 January, 2017 6 February, 2017
  • Office Order for Extension Date and Time Of NIT 03 2016 17.pdf
  • 333 Extension of NIT Vehicle SE (T&C), Bikaner 1 February, 2017 10 February, 2017
  • NIT extension of vehicle.pdf
  • 334 Steel Structure Painting at 132 KV GSS Banar 27 January, 2017 13 February, 2017
  • ban-1.pdf
  • ban-2.pdf
  • 335 NIT Vehicle 220 KV GSS Hanumangarh 1 February, 2017 3 March, 2017
  • NIT 04 (2016-17) hanumangarh .pdf
  • 336 Cleaning works at 132 KV GSS Sadulsahar 1 February, 2017 7 February, 2017
  • NIT FOR GENERAL CLEANING Sadul Sahar.pdf
  • 337 NIT Vehicle 220 KV GSS Bhadra 31 January, 2017 12 February, 2017
  • Consent for Hiring of vehicle at 220 KV GSS Bhadra.pdf
  • 338 Yard Cleaning at 220 KV GSS Udyogvihar 2 February, 2017 8 February, 2017
  • NIT No. 04 Yard cleaning at 220 KV GSS SGNR.pdf
  • 339 Cleaning works at 220 KV GSS Udyogvihar 2 February, 2017 8 February, 2017
  • NIT No. 03 General cleaning work at 220 KV GSS SGNR.pdf
  • 340 Extension of NIT No.10 T&C Bikaner 2 February, 2017 13 February, 2017
  • NIT Extension Hostel.pdf
  • 341 Re-stringing work of earth wire of line at 132 KV GSS Rajiasar 2 February, 2017 9 February, 2017
  • Earth wire Rajiasar.pdf
  • 342 Fixing work of vibration damper of line at 132 KV GSS Rajiasar 2 February, 2017 9 February, 2017
  • Vibration damper rajiasar.pdf
  • 343 NIT for Vehicle at 220 KV GSS Suratgarh 3 February, 2017 10 February, 2017
  • hiring of vehicle 03.02.2017.pdf
  • 344 Hiring Vehicle at XEN(220 KV GSS), BHADLA 3 February, 2017 9 February, 2017
  • image1.jpeg
  • 345 Supply of Stationary at AEN CLUSTER DECHU 4 February, 2017 14 February, 2017
  • ST-2.JPG
  • 346 Painting work at 132 KV GSS Sri Ganganagar 6 February, 2017 14 February, 2017
  • NIT Painting_0001.pdf
  • 347 NIT Hiring of vehicle AEn Cluster Bhinasar 6 February, 2017 15 February, 2017
  • NITNo.01 For Hiring of Vehicle.pdf
  • 348 orrigendum in NIT Vehicle at 220 KV GSS Suratgarh 6 February, 2017 13 February, 2017
  • IMG_20170207_0005.pdf
  • 349 NIT for REST HOUSE at 220 KV GSS Suratgarh 8 February, 2017 18 February, 2017
  • rest house suratgrah.pdf
  • 350 Restringing work of 220 KV line at 220 KV GSS Suratgarh 8 February, 2017 28 February, 2017
  • NIT restringing suratarh.pdf
  • 351 NIT for Vehicle AEN (Cluster), Napasar 13 February, 2017 22 February, 2017
  • NIT .pdf
  • 352 Hiring of vehicle for Circle SE(T&C), Bhadala 10 February, 2017 23 February, 2017
  • B-2.pdf
  • 353 Const of 132 KV Bay at 132 KV GSS PS-5 14 February, 2017 28 February, 2017
  • b-1.pdf
  • 354 Limited Tender Notice AEn I T&C Bikaner 10 February, 2017 16 February, 2017
  • scan_132819_0001.pdf
  • 355 HIRING OF VEHICLE UNDER SE(T&C),RVPN,RAMGARH 14 February, 2017 23 February, 2017
  • ramgarh.pdf
  • 356 HIRING OF VEHICLE UNDE SE(T&C),JAISALMER 13 February, 2017 22 February, 2017
  • vehicle 13022017.pdf
  • 357 Transformer painting work at 220 KV GSS Suratgarh 13 February, 2017 20 February, 2017
  • Transformers Painting work at Suratgarh.pdf
  • 358 NIT for Vehicle XEN T&C Hanumangarh 14 February, 2017 21 February, 2017
  • Documments_0011.pdf
  • 359 NIT for Vehicle AEN (T&C), Hanumangarh 14 February, 2017 21 February, 2017
  • aen tc hanumangarh.pdf
  • 360 Extn of NIT of Purchase of Stationary items 13 February, 2017 17 February, 2017
  • extn-new.JPG
  • 361 NIT Hiring of Vehicle at 220 KV GSS Padampur 15 February, 2017 23 February, 2017
  • Acceptance letter for Vehicle 2017-18 padampur.pdf
  • 362 Quatation for accesaries of SF6 Breaker at 132 KV GSS Sheo 16 February, 2017 24 February, 2017
  • sheopdf.pdf
  • 363 QUATATION FOR ACCESARIES OF VCB BREAKER AT 132 KV GSS UNDOO 16 February, 2017 24 February, 2017
  • undoo.pdf
  • 364 NIT Hiring of Vehice XEN (MPT&S), hanumangarh 16 February, 2017 23 February, 2017
  • Hiring of vehicle FY xen mpts 17-18.pdf
  • 365 Painting work at 132 KV GSS SAWA 7 February, 2017 22 February, 2017
  • SAWA.pdf
  • 366 NIT for Vehicle at 220 KV GSS Hanumangarh 17 February, 2017 17 March, 2017
  • NIT 05 Veh 220 HMGH .pdf
  • 367 Extension of NIT No.6 at 220 KV GSS Suratgarh 17 February, 2017 7 March, 2017
  • IMG_20170218_0005.pdf
  • 368 Erection work of Sub-station structure, Bus-Bar, Equipments and Earthing work for Installation of 33 KV, 5.43 MVAR Cap. Bank at 132 KV GSS Gadra Road 17 February, 2017 27 February, 2017
  • NIT 05 2016-17.PDF
  • 369 Erection work of Sub-station structure, Bus-Bar, Equipments and Earthing work for Installation of 33 KV, 5.43 MVAR Cap. Bank at I32 KV GSS Juna Mitha Khera 17 February, 2017 27 February, 2017
  • NIT 06 2016-17.PDF
  • 370 Erection work of Sub-station structure, Bus-Bar, Equipments and Earthing work for Const. of 33 KV bay at 132 KV GSS Undoo. 17 February, 2017 27 February, 2017
  • NIT 07 2016-17.PDF
  • 371 Hiring of Vehicle under SE(T&C), Jodhpur for F.Y- 2017-18 20 February, 2017 7 March, 2017
  • nit-hiring.pdf
  • 372 Maintenance at 132 KV GSS SAWA 17 February, 2017 25 February, 2017
  • Maintenance sawa.pdf
  • 373 General Cleaning At 132 KV GSS Barmer 17 February, 2017 25 February, 2017
  • Barmer2 (2).pdf
  • 374 NIT Hiring of Vehicle at 220 KV GSS Suratgarh 22 February, 2017 23 March, 2017
  • NIT for Hiring of Vehicle Suratgarh.pdf
  • 375 Hiring of vehicle under SE(MPT&S), Jodhpur 16 February, 2017 4 March, 2017
  • M-1.pdf
  • 376 Hiring of vehicle under ACE(MPT&S), Jodhpur 20 February, 2017 7 March, 2017
  • M-2.pdf
  • 377 Hiring of vehicle under SE(T&C), Kankani 22 February, 2017 8 March, 2017
  • K-1.pdf
  • 378 NIT Transportation of Tr. AEN (T&C), Sri Ganganagar 22 February, 2017 6 March, 2017
  • IMG_20170222_0014.pdf
  • 379 NIT 81 to 88 for Hiring vehicle under T&C,Sirohi 22 February, 2017 6 March, 2017
  • NIT hiring.pdf
  • 380 General Cleaning at 220 KV GSS Baithwasia 21 February, 2017 7 March, 2017
  • ba-1.pdf
  • 381 Hiring of vehicle under XEN(MPT&S), Jodhpur 20 February, 2017 1 March, 2017
  • X-1.pdf
  • 382 MAINTENANCE & GENERAL CLEANING AT 400 KV JAISLMER 23 February, 2017 15 March, 2017
  • jaislmer1.pdf
  • jaislmer2.pdf
  • 383 HIRING VEHICLE FOR SE(T&C) RAMGARH 24 February, 2017 3 March, 2017
  • ramgrgh.PDF
  • 384 REFILING OF FIRE FIGHTING UNDER SE(T&C),BARMER 23 February, 2017 4 March, 2017
  • Barmer.pdf
  • 385 NIT for Vehicle under XEN (MPT&S), Hanumangarh 6 March, 2017 23 March, 2017
  • NIT Hiring of vehicle.pdf
  • 386 Supply of Stationery items at AEN(OTL),Jodhpur 23 February, 2017 4 March, 2017
  • rim.pdf
  • 387 General Cleaning at 220 KV GSS Bhawad 25 February, 2017 13 March, 2017
  • B-1.jpg
  • B-2.jpg
  • B-3.jpg
  • 388 Extention of NIT no.5 at XEN(T&C),Barmer 27 February, 2017 6 March, 2017
  • EXT NIT No. 05.PDF
  • 389 EXTENTION OF NIT NO.6 AT XEN(T&C),BARMER 27 February, 2017 6 March, 2017
  • EXT NIT No-06.PDF
  • 390 EXTENTION OF NIT NO.7 AT XEN(T&C),BARMER 27 February, 2017 6 March, 2017
  • EXT NIT No-07.PDF
  • 391 NIT NO03 AT SE(T&C) JAISALMER 24 February, 2017 6 March, 2017
  • akal.pdf
  • 392 NIT For Vehicle at AEN (T&C), Hanumangarh 28 February, 2017 30 March, 2017
  • Vehicle NIT Of AEN (T&C) HMH for 2017-18.pdf
  • 393 NIT for Vehicle SE (MPT&S) Bikaner 27 February, 2017 8 March, 2017
  • dn 282 consent 2017-02-28.pdf
  • 394 NIT for Vehicle at XEN (T&C) Hanumangarh 28 February, 2017 30 March, 2017
  • NIT 04 Hiring of Inspection Vehicle.pdf
  • 395 NIT Vehicle XEN 220 KV GSS Bhadra 28 February, 2017 28 March, 2017
  • Hiring of Vehicle NIT-02 of XEN(220 KV GSS) Bhadra.pdf
  • 396 HIRING OF VEHICLE FOR AEN(MPT&S) RVPN SIROHI 1 March, 2017 15 March, 2017
  • tender hiring of Jeep.pdf
  • 397 HIRING OF VEHICLE FOR XEN(MPT&S) RVPN JAISALMER 1 March, 2017 15 March, 2017
  • XEN JSL hiring of Jeep 2017-18.pdf
  • 398 HIRING OF VEHICLE FOR AEN(MPT&S) RVPN JAISALMER 1 March, 2017 15 March, 2017
  • consent for hiring of vehicle 2017-18 AEN OFFICE.pdf
  • 399 Dismentaling of 220/132,160 MVA Trf. at 220 KV GSS Ramgarh 1 March, 2017 11 March, 2017
  • W.O.0001.PDF
  • 400 Const of 132 KV GSS Nathrau & 132 KV GSS Bana Ka Bas 3 March, 2017 24 March, 2017
  • 12345.pdf
  • 401 Various Construction activities at 132 KV GSS Khetusar, Bhadla 2 March, 2017 16 March, 2017
  • bhadla-12.pdf
  • bhadla-11.pdf
  • 402 11 KV Yard Dismentalling work at 132 KV GSS Jaitaran 2 March, 2017 18 March, 2017
  • 11 kv.PDF
  • 403 NIT for Vehicle under AEN (RPM), Bikaner 2 March, 2017 10 March, 2017
  • rpm bikaner.pdf
  • 404 Transformer Painting work at 132 KV GSS Rajiasar 2 March, 2017 15 March, 2017
  • sacn painting xmer.pdf
  • 405 Structure Painting work at 132 KV GSS Jaitaran 3 March, 2017 19 March, 2017
  • nit-jaitaran.PDF
  • 406 Hiring of vehicle under ZCE (T&C), Jodhpur 28 February, 2017 11 March, 2017
  • nit-zce.PDF
  • 407 Hiring of Vehicle under SE(T&C), Jaisalmer 3 March, 2017 16 March, 2017
  • nit-jsm.pdf
  • 408 Const_33 KV Bay_132 KV GSS Falna 4 March, 2017 16 March, 2017
  • kank-1.pdf
  • 409 Hiring of vehicle under AEN (MPT&S), Phalodi 3 March, 2017 15 March, 2017
  • Vehicle Hiring AEn(MPTS) Phalodi.pdf
  • 410 Overhauling of Breaker at 132 KV GSS NPH, Jodhpur 6 March, 2017 14 March, 2017
  • NPH-7.pdf
  • 411 Extension of NIT 81 to 88 at SE(T&C),Sirohi 6 March, 2017 14 March, 2017
  • NIT Extention.pdf
  • 412 Consent of Hiring vehicle for AEN(MPT&S) 6 March, 2017 15 March, 2017
  • aen mpts HOV.pdf
  • 413 NIT NO.2,3 &4 AT 132 KV GSS JAISALMER 6 March, 2017 18 March, 2017
  • nit3.pdf
  • nit4.pdf
  • nit2.pdf
  • 414 NIT Hiring of Vehicle at 220 KV GSS Padampur 1 March, 2017 30 March, 2017
  • NIT Padampur.pdf
  • 415 Hiring of Vehicle under SE(T&C), Bhadla 8 March, 2017 18 March, 2017
  • bhadla-new.pdf
  • 416 Extention of NIT no. 09 at SE(T&C),Barmer 7 March, 2017 16 March, 2017
  • NIT Extention Notice.pdf
  • 417 NIT no. 03 & 04 at 220 KV GSS Ramgarh 7 March, 2017 17 March, 2017
  • NIT 03 & 04 2016-17.PDF
  • 418 NIT NO.03 EXTENSION AT 400 KV GSS JAISALMER 7 March, 2017 15 March, 2017
  • Ext NIT 03 Akal.pdf
  • 419 CONSENT OF MAINTENANCE AT 132 KV GSS BARMER 7 March, 2017 15 March, 2017
  • New Doc 2017-03-07.pdf
  • 420 CONTROL ROOM CLEANING AT 220 KV GSS PINDWARA 6 March, 2017 15 March, 2017
  • control room cleaning.pdf
  • 421 Limited Tender for repair of Vehicle 7 March, 2017 15 March, 2017
  • limited tender.pdf
  • 422 NIT for Fixing of Vibration Damper of various 132 Kv Lines under XEN (220 KV GSS), Suratgarh Division 8 March, 2017 17 March, 2017
  • NIT No. 09 Fixing Vibration Damper.pdf
  • 423 Structure Painting Work at 132 KV GSS NPH, Jodhpur 7 March, 2017 15 March, 2017
  • NPH-PAINTING.pdf
  • 424 General cleaning works at 220 KV GSS Sujangarh 9 March, 2017 24 March, 2017
  • G Schedul Control Room Cleaning 220 Sugh (1).pdf
  • 425 Hiring of vehicle under SE (T&C), Jodhpur 11 March, 2017 24 March, 2017
  • v2.pdf
  • 426 Limited Tender for sports items SE (T&C), Bikaner 9 March, 2017 16 March, 2017
  • Limited Tender sports items.pdf
  • 427 VARIOUS NITS AT 220 KV GSS AMARSAGAR 8 March, 2017 21 March, 2017
  • Amarga3.pdf
  • amargs5.pdf
  • Amargar7f.pdf
  • Amarsagar.pdf
  • 428 NIT FOR LOGSHEET PRITING AT 132 KV GSS GUDAMALANI 8 March, 2017 17 March, 2017
  • logsheetguda.pdf
  • 429 NIT FOR CUNSULTANCY SERVICE FOR FOREST CLEARANCE OF 220KV PINDWAR-SIROHI LINE 9 March, 2017 20 March, 2017
  • tender forest new.pdf
  • 430 Hiring of vehicle under SE(T&C), Kankani 9 March, 2017 29 March, 2017
  • KAA-2.pdf
  • 431 Construction of 132 KV Bay at 132 KV GSS Dechu for 132 KV Nathrau feeder 10 March, 2017 20 March, 2017
  • nath-2.jpg
  • nath-3.jpg
  • nath-4.jpg
  • nath-5.jpg
  • nath-1.jpg
  • 432 Purchase of Stationary items under SE(T&C),Bhadla 10 March, 2017 21 March, 2017
  • bhadla-st.pdf
  • 433 Extension of NIT-02 (2016-17) of XEN(220 KV GSS), Ramgarh 10 March, 2017 17 March, 2017
  • nit02 (1).PDF
  • 434 Cleaning works at 220 KV GSS Sujangarh 9 March, 2017 24 March, 2017
  • G-Schedul Genral Cleaning control room 220 Sujangarh.pdf
  • 435 NIT Hiring of Vehicle under SE (MPT&S), Bikaner 24 March, 2017 30 March, 2017
  • nit22017-03-09.pdf
  • 436 NIT No.9 Cancellation 220 KV GSS Suratgarh 10 March, 2017 10 March, 2017
  • Cancellation of NIT No.9.pdf
  • 437 NIT No.10 220 KV GSS Suratgarh 10 March, 2017 20 March, 2017
  • NIT No. 10.pdf
  • 438 Cleaning work at 132 KV GSS Sawa(Barmer) 14 March, 2017 22 March, 2017
  • sawa.pdf
  • 439 General Cleaning work at 132 KV GSS Kuri Bhagtasni Jodhpur 14 March, 2017 30 March, 2017
  • prb-2.jpg
  • prb-1.jpg
  • K-1.jpg
  • 440 Cleaning Work at 220 KV GSS Jodhpur 15 March, 2017 30 March, 2017
  • JO-3.PDF
  • JO-4.PDF
  • 441 Extension of NIT of various works under SE(T&C), Bhadla 15 March, 2017 23 March, 2017
  • BHAA-1.jpg
  • 442 Cleaning work at 220 KV GSS Sujangarh 15 March, 2017 20 March, 2017
  • control room cleaning at 220 sujangarh.pdf
  • 443 Hiring of vehicle at various offices under ZCE (T&C),Jodhpur 15 March, 2017 29 March, 2017
  • ZCE.PDF
  • 444 Yard Cleaning at 132 KV GSS Tagore Nagar, Pali 15 March, 2017 30 March, 2017
  • tagore.pdf
  • 445 Hiring of vehicle at various offices under SE(MPT&S), Jodhpur 18 March, 2017 31 March, 2017
  • 641.pdf
  • 446 Checking & refiling of Split A.C. at 400 KV GSS Jodhpur 17 March, 2017 28 March, 2017
  • refiling.pdf
  • 447 NIT for hiring vehicle under SE(T&C),Sirohi 17 March, 2017 28 March, 2017
  • hiring.pdf
  • 448 Extn. of Opening date of Tender NIT-04 (2016-17) 18 March, 2017 25 March, 2017
  • R-1.jpeg
  • 449 Extn. of Opening date of Tender NIT-03 (2016-17) 18 March, 2017 25 March, 2017
  • R-3.jpeg
  • 450 Extn. of Opening date of Tender NIT-02 (2016-17) 18 March, 2017 25 March, 2017
  • R-2.jpeg
  • 451 NIT Hiring of Vehicle AEN (T&C), Ratangarh 17 March, 2017 27 March, 2017
  • NIT 02 for Hiring of Vehicle.pdf
  • 452 NIT for printing of Log Sheet at 400 KV GSS Ratangarh 21 March, 2017 28 March, 2017
  • revised NIT No.09-2016-17.pdf
  • 453 NIT FOR GENERAL CLEANING AT 220 KV GSS JALORE 22 March, 2017 3 April, 2017
  • NIT -for General cleaning.pdf
  • 454 NIT FOR SUPPLY OF WATER IN FIRE FIGHTING TANK JAISALMER 21 March, 2017 28 March, 2017
  • 923.pdf
  • 455 General Cleaning work at 132 KV GSS Rani 21 March, 2017 29 March, 2017
  • RANI.pdf
  • 456 EXTENSION OF NIT NO 4 TO 6 AT SE(T&C),JAISALMER 9 March, 2017 10 April, 2017
  • 905.pdf
  • 457 NIT FOR SUPPLY DRINKING WATER AT 220 KV GSS BALOTRA 22 March, 2017 31 March, 2017
  • NIT BALOTRA 2017-18.pdf
  • 458 Refilling of Fire Extinguisher at 132 KV GSS Banar 20 March, 2017 1 April, 2017
  • BAN-2.pdf
  • 459 General Cleaning work at 132 KV GSS Kuri Bhagtasni (Retender) 24 March, 2017 1 April, 2017
  • K-2.jpg
  • K-3.jpg
  • 460 NIT Yard cleaning at 132 KV GSS Raisinghnagar 24 March, 2017 7 April, 2017
  • nit yard raisinghnagar.pdf
  • 461 PREPARATION OF FOREST DIVERSION CASE FOR 400 KV D/C BARMER-BHINMAL TR. LINE 27 March, 2017 6 April, 2017
  • BarmerPDF.PDF
  • 462 TN-38 & TN-39 under SE(T&C), Jodhpur 30 March, 2017 19 April, 2017
  • NIT-GSS.pdf
  • 463 Hiring of School Bus & Inspection vehicle under SE(T&C), Jodhpur 31 March, 2017 11 April, 2017
  • VEHICLE-NEW.pdf
  • 464 NIT FOR DRINKING WATER AND REFILLING OF FIRE FIGHTING AT 400 KV GSS BARMER 24 March, 2017 31 March, 2017
  • NIT fire.pdf
  • NIT Barmer.pdf
  • 465 VARIOUS NITS AT SE(T&C),JAISALMER 27 March, 2017 10 April, 2017
  • 945.pdf
  • 466 NIT for hiring of Vehicle AEN (Cluster), Bhinasar 30 March, 2017 6 April, 2017
  • NIT Complete.pdf
  • 467 GENERAL CLEANING 132 KV GSS MAHLOO 30 March, 2017 5 April, 2017
  • cleaning work at 132 kv gss mahloo 30.03.2017.pdf
  • 468 GENERAL CLEANING WORK AT 220 KV GSS SAYALA 30 March, 2017 5 April, 2017
  • consent letter for genral cleaning at 220 KV GSS Sayala.pdf
  • 469 PAINTING WORK AT 132 KV GSS ABUROAD 28 March, 2017 7 April, 2017
  • Painting NIT.pdf
  • 470 General Cleaning work at 220 kV GSS Jodhpur 30 March, 2017 7 April, 2017
  • J-1.PDF
  • J-2.PDF
  • 471 NIT for Hiring of Vehicle XEN MPTS Bikaner 30 March, 2017 15 April, 2017
  • niMPTS.pdf
  • 472 RE-CONSENT FOR HIRING OF VEHICLE FOR AEN(MPT&S) SIROHI
  • Consent Hiring of Vehicle.pdf
  • 473 Aug. of Transformer at 220 KV GSS Badisid 4 April, 2017 19 April, 2017
  • NIT 01 for Aug of 220 KV Badisid.pdf
  • 474 General Cleaning works at 132 Kv GSS Salasar 4 April, 2017 8 April, 2017
  • General Cleaning salasar.pdf
  • 475 Bay maint work at 132 KV GSS Sojat City 5 April, 2017 16 April, 2017
  • n-1.pdf
  • 476 Line Patrolling & tree Cutting works at 132 KV GSS Sojat City 5 April, 2017 16 April, 2017
  • n-2.pdf
  • 477 NIT Hiring of Vehicle o/o AEN (Cluster) Napasar 5 April, 2017 12 April, 2017
  • hiring cluster napasar.pdf
  • 478 Extension of NIT-Const of 132 KV GSS Bera 6 April, 2017 16 April, 2017
  • bera-ext.pdf
  • 479 Hiring of vehicle at 220 KV GSS Bali 6 April, 2017 13 April, 2017
  • nib bid bali.pdf
  • 480 General Cleaning work at 220 KV GSS PHALODI 6 April, 2017 12 April, 2017
  • Control room cleaning NIT.pdf
  • 481 NIT Hiring of Vehicle o/oAEN (RPM) Bikaner 6 April, 2017 13 April, 2017
  • 06.04.2017 scan_0001.pdf
  • 482 Yard Cleaning work at 220 KV GSS Phalodi 7 April, 2017 13 April, 2017
  • Yard cleaning NIT.pdf
  • 483 Corrigendum in Consent Hiring of Vehicle AEN RPM Bikaner 6 April, 2017 17 April, 2017
  • corrigendum.pdf
  • 484 Genaral Cleaning work at 220 KV GSS Bhawad 6 April, 2017 18 April, 2017
  • bha-1.pdf
  • 485 Construction of 132 KV S/C line From 220 KV GSS Dechu to 132 KV GSS Nathrau 20 March, 2017 12 April, 2017
  • PRO.pdf
  • 486 Const of 132 KV D/C line for 132 KV GSS Bana Ka Bas 20 March, 2017 21 April, 2017
  • PRO.pdf
  • 487 NIT No. 1 132 KV GSS Churu 6 April, 2017 17 April, 2017
  • Tender No.-01 FY- 2017-18 -1-.pdf
  • 488 NIT No.2 132 KV GSS Churu 6 April, 2017 17 April, 2017
  • Tender No.-02 FY- 2017-18.pdf
  • 489 Extension-General Cleaning work at 220 KV GSS Jodhpur (NIT-2/2016-17) 7 April, 2017 14 April, 2017
  • extend time.PDF
  • 490 NIT FOR HIRING OF VEHICLE AT XEN(T&C),BARMER 7 April, 2017 19 April, 2017
  • NIT 2 ( 2017-18).PDF
  • NIT 01 (2017-18).PDF
  • 491 TIME EXTENTION OF NIT NO 03 AT 132KV GSS SAWA 7 April, 2017 17 April, 2017
  • IMG_20170407_105624.jpg
  • 492 NIT FOR SUPPLY OF RAW WATER FOR FILLING FIGHTING TANK AT 400 GSS BARMER 5 April, 2017 14 April, 2017
  • NIT RAW WATER BARMER.pdf
  • 493 NIT NO 92 FOR CONSULTANCY SERVICE FOR FOREST CLEARANCE OF 220 KV S/C SIROHI-PINDWARA 7 April, 2017 17 April, 2017
  • NIT 92.pdf
  • 494 NIT NO 93 TO 95 FOR HIRING VEHICLE UNDER SE(T&C),SIROHI 7 April, 2017 17 April, 2017
  • NIT93 to 95.pdf
  • 495 Corrigendum regarding Processing Fee (Tn-35 & Tn-36) 10 April, 2017 12 April, 2017
  • corrigendum-1.pdf
  • 496 Transformer Painting work at 132 KV GSS Rajiasar 10 April, 2017 17 April, 2017
  • painting xmer.pdf
  • 497 Cleaning work at 132 KV GSS Mandore 10 April, 2017 22 April, 2017
  • MANDORE-1.pdf
  • 498 NIT Hiring of Vehicle o/o XEn 220 KV GSS Badnu 11 April, 2017 21 April, 2017
  • vehicle tender badnu.pdf
  • 499 Extn_NIT_TN-1/2017-18 _ 220 KV GSS PHALODI 12 April, 2017 26 April, 2017
  • NIT Extension.pdf
  • 500 BAY MAINTENANCE AT 132 KV GSS UNDOO 8 April, 2017 17 April, 2017
  • bay maintenance undoo.pdf
  • 501 NIB No.1 2017-18 SE (T&C), Hanumangarh 13 April, 2017 15 May, 2017
  • NIT Hanumangarh.pdf
  • 502 NIT Cancellation at 220 KV GSS PHALODI 13 April, 2017 13 April, 2017
  • NIT CANCEL yard .pdf
  • 503 BAY AND PAINTING WORK AT 132 KV GSS SHEO 17 April, 2017 25 April, 2017
  • painting work sheo.pdf
  • bay maintenance at Sheo.pdf
  • 504 TIME EXTENSION OF NIT NO. 19 AT 400 KV GSS BARMER 14 April, 2017 24 April, 2017
  • NIT_02.pdf
  • 505 CONSENT OF HIRING OF VEHICLE AT AEN(MPT&S),BARMER 17 April, 2017 24 April, 2017
  • consent for hiring of vehicle.pdf
  • 506 Extn_Aug_220 KV GSS Badisid(160 MVA Trf.) 19 April, 2017 25 April, 2017
  • 84.02.pdf
  • 507 Painting work of Fire Fighting equipments under SE(T&C), Bikaner 19 April, 2017 28 April, 2017
  • 120_Firefighting.pdf
  • 120_Firefighting_G-Schedule.pdf
  • 508 Cleaning work at 400 KV GSS Bikaner 19 April, 2017 28 April, 2017
  • 121_Cleaning_STN.pdf
  • 121_Cleaning_G-Schedule.pdf
  • 509 Oil Filtration work at 220 KV GSS Badnu 19 April, 2017 26 April, 2017
  • oil filtration work at 220 KV GSS Badnu.pdf
  • 510 Purchase of Battries for DG set at 400 KV GSS JODHPUR 20 April, 2017 2 May, 2017
  • 42.pdf
  • 511 Purchase of Batteries for Jeep & Canter at 400 KV GSS JODHPUR 20 April, 2017 2 May, 2017
  • 43.pdf
  • 512 Repair works of Air Conditioner at 400 KV GSS Bikaner 21 April, 2017 28 April, 2017
  • 149_nit.pdf
  • 513 Construction & Reconstruction work at 220 KV GSS Bali under SE(T&C), Kankani 23 April, 2017 11 May, 2017
  • bali-1.pdf
  • bali-2.pdf
  • 514 CONSENT OF HIRING OF VEHICLE FOR T&C CIRCLE SIROHI 21 April, 2017 5 May, 2017
  • Consent for hiring.pdf
  • 515 NIT FOR PRINTING LOGSHEET AT 132 KV GSS JAISALMER 17 April, 2017 26 April, 2017
  • LOGSHEET.pdf
  • 516 Bay maint work at 400 KV GSS Jodhpur 24 April, 2017 5 May, 2017
  • BAY-JODHPUR.pdf
  • 517 Bay maint work at 132 KV GSS Mandore 24 April, 2017 5 May, 2017
  • BAY-MANDORE.pdf
  • 518 General Cleaning work at 132 KV GSS Mandore 24 April, 2017 5 May, 2017
  • CLEAN-MANDORE.pdf
  • 519 General Cleaning work at 400 KV GSS Jodhpur 24 April, 2017 5 May, 2017
  • CLEAN-JODHPUR.pdf
  • 520 NIT FOR OIL FILTRATION AT 220 KV GSS JALORE 24 April, 2017 4 May, 2017
  • NIT of 100 MVA Trans Filtration work.pdf
  • 521 General Cleaning work at 220 KV GSS Badisid 24 April, 2017 2 May, 2017
  • BADISID-1.pdf
  • 522 Yard Cleaning work at 220 KV GSS Badisid 24 April, 2017 2 May, 2017
  • BADISID-2.pdf
  • 523 General Cleaning work at 220 KV GSS Bap 24 April, 2017 2 May, 2017
  • BAP-1.pdf
  • 524 Yard Cleaning work at 220 KV GSS Bap 24 April, 2017 2 May, 2017
  • BAP-2.pdf
  • 525 General Cleaning work at 220 KV GSS Kanasar 24 April, 2017 2 May, 2017
  • kaka.pdf
  • 526 BAY WORK AT 132 KV GSS GALIFA 26 April, 2017 12 May, 2017
  • NIT c&m.pdf
  • 527 Cancellation of NIT (Bay maint work at 400 KV GSS Jodhpur) 26 April, 2017 26 April, 2017
  • CANCEL.pdf
  • 528 Bay Maint work at 400 KV GSS Jodhpur (Revised) 26 April, 2017 12 May, 2017
  • jodhpur-1.pdf
  • jodhpur1.1.pdf
  • 529 Maint of Switch Yard & bay equipments at 132 KV GSS NPH Jodhpur 26 April, 2017 12 May, 2017
  • NPH-1.PDF
  • NPH-2.PDF
  • 530 Hiring of vehicle under XEN (RPM), Jodhpur 26 April, 2017 6 May, 2017
  • zce-rvpn.pdf
  • 531 Cleaning works at 400 KV GSS Bikaner 26 April, 2017 3 May, 2017
  • G sch.pdf
  • 532 Cancellation of Tender (Bay maint work at 132 KV GSS NPH, Jodhpur) 27 April, 2017 27 April, 2017
  • cancellation of tender.pdf
  • 533 Yard cleaning at 132 KV GSS Mandore 27 April, 2017 7 May, 2017
  • MANDORE-NEW.pdf
  • 534 Yard cleaning at 400 KV GSS Jodhpur 27 April, 2017 12 May, 2017
  • YARD-CLEAN-FINAL-400.pdf
  • 535 Patrolling of lines under 400 KV GSS Jodhpur 27 April, 2017 12 May, 2017
  • PATROLLING-FINAL.pdf
  • 536 Yard cleaning at 220 KV GSS Tinwari 27 April, 2017 14 May, 2017
  • TINWARI-YARD.PDF
  • 537 Bay maint work at 220 KV GSS Tinwari 27 April, 2017 15 May, 2017
  • RTPP-TIN-MAINT.PDF
  • RTPP-TIN-RTPP.PDF
  • 538 Bay maint. at 132 KV GSS NPH, Jodhpur 27 April, 2017 12 May, 2017
  • maintenance 2017.pdf
  • 539 General Cleaning work at 220 KV GSS Jodhpur 28 April, 2017 5 May, 2017
  • CLEANING-220 JODHPUR.pdf
  • 540 Control room cleaning works at 400 Kv GSS Bikaner 28 April, 2017 4 May, 2017
  • control room cleaning 400 bkn.pdf
  • 541 Hiring of vehicle at various offices under SE(T&C),Sirohi 29 April, 2017 16 May, 2017
  • Sirohi Hiring of Vehicle.pdf
  • 542 General Cleaning at 220 KV GSS Bhawad 29 April, 2017 7 May, 2017
  • bho-2 (1).jpg
  • bho-2 (2).jpg
  • bho-3.jpg
  • 543 Extn of TENDER (Yard cleaning work at 220 KV GSS Badisid) 1 May, 2017 11 May, 2017
  • badi-1.jpg
  • 544 Extn of TENDER (General cleaning work at 220 KV GSS Badisid) 1 May, 2017 11 May, 2017
  • badi-2.jpg
  • 545 Extn of TENDER (General cleaning work at 220 KV GSS Bap) 1 May, 2017 11 May, 2017
  • bap22.PDF
  • 546 Extn of TENDER (Yard cleaning work at 220 KV GSS Bap) 1 May, 2017 11 May, 2017
  • bap-11.PDF
  • 547 Bay maint work at 132 KV GSS Sojat City 1 May, 2017 8 May, 2017
  • Bay Maint. work.pdf
  • 548 Tree cutting under 132 KV GSS Sojat 1 May, 2017 8 May, 2017
  • Line Petrolling and tree cutting Work.pdf
  • 549 Dismantelling of 11 KV Switch Yard at 132 KV GSS Sojat City 1 May, 2017 8 May, 2017
  • Dismentaling work.pdf
  • 550 Extn of date:- General cleaning work at 220 KV GSS KANASAR 1 May, 2017 11 May, 2017
  • KANASAR-1.jpg
  • 551 Purchase of Tyre/Tube at 400 KV GSS Barmer 27 April, 2017 4 May, 2017
  • page1.pdf
  • 552 Extn. of NIT-Supply of Water Tank at 400 KV GSS Barmer 24 April, 2017 5 May, 2017
  • page1.pdf
  • 553 Maint work at 220 KV GSS Bhawad 1 May, 2017 11 May, 2017
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • 554 General Cleaning work at 132 KV GSS Kuri Bhagtasni Housing Board, Jodhpur 3 May, 2017 10 May, 2017
  • page1.pdf
  • page2.pdf
  • 555 Bay maint work at 220 KV GSS Dechu 4 May, 2017 18 May, 2017
  • page1.pdf
  • page1.pdf
  • page2.pdf
  • 556 General cleaning work at 220 KV GSS Dechu 3 May, 2017 10 May, 2017
  • DECHU-CL-1.JPG
  • DECHU-CL-2.JPG
  • DECHU-CL-3.JPG
  • 557 Extension of NIT for Yard cleaning at 400 KV GSS Bikaner 3 May, 2017 11 May, 2017
  • extension 400.pdf
  • 558 Yard Cleaning work at 220 KV GS Bali 5 May, 2017 12 May, 2017
  • page1.pdf
  • page2.pdf
  • 559 Printing of Log Sheet at 220 KV GSS Amarsagar 4 May, 2017 15 May, 2017
  • page1.pdf
  • 560 Structure painting work at 220 KV GSS Tinwari 8 May, 2017 25 May, 2017
  • page1.pdf
  • page1.pdf
  • page2.pdf
  • 561 Purchase of Stationary items at O/o ZCE(T&C), Jodhpur 3 May, 2017 15 May, 2017
  • nit TO ZCE.jpg
  • 562 TIME EXTENTION OF NIT 3 & 4 8 May, 2017 16 May, 2017
  • NIT_3_4
  • 563 Bay maint work at 220 KV GSS Jodhpur 9 May, 2017 24 May, 2017
  • page1.pdf
  • page1.pdf
  • page2.pdf
  • 564 Control room building cleaning work at 400 KV GSS Bikaner 9 May, 2017 15 May, 2017
  • control room cleaning 400 kv bikkn.pdf
  • 565 Bay maint work at 132 KV GSS Banar 10 May, 2017 26 May, 2017
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • page5.pdf
  • 566 Const.work of 132 KV GSS Tatarsar 10 May, 2017 13 June, 2017
  • NIT 5 Pages.pdf
  • 567 Revetment of 132 KV S/C TTB tower of 132 KV S/C Boranada-Pali line 15 May, 2017 12 June, 2017
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • page5.pdf
  • page6.pdf
  • 568 Bay maint. work at 132 KV GSS Soorsagar 9 May, 2017 16 May, 2017
  • sb-1.jpg
  • sb-2.jpg
  • 569 General Cleaning work at 132 KV GSS Soorsagar 9 May, 2017 16 May, 2017
  • sg-1.jpg
  • sg-2.jpg
  • 570 Yard Cleaning work at 132 KV GSS Soorsagar 9 May, 2017 16 May, 2017
  • sy-1.jpg
  • sy-2.jpg
  • 571 NIT FOR LOGSHEET PRINTING AT 400 KV GSS BARMER 8 May, 2017 15 May, 2017
  • logsheet.pdf
  • 572 Bay maint work at 132 KV GSS Mathania 10 May, 2017 20 May, 2017
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • 573 Upkeeping work at 132 KV GSS Mathania 10 May, 2017 20 May, 2017
  • page1.pdf
  • page2.pdf
  • 574 Painting work at 400 KV GSS Bikaner 10 May, 2017 18 May, 2017
  • painting work at 400 BKN.pdf
  • 575 NIT No.1 to 4 for work of installation of capacitor banks 12 May, 2017 18 May, 2017
  • nit xen i bkn.pdf
  • 576 Erection Of 22O/I32KV,160MVA Transformer at 220kv GSS Ramgarh. 12 May, 2017 22 May, 2017
  • NIT 01 (17-18).PDF
  • 577 Tree Cutting work at 220 KV GSS Lines under 220 KV GSS Dechu 12 May, 2017 19 May, 2017
  • dd-1.JPG
  • dd-2.JPG
  • 578 Bay maint work at 220 KV GSS BAITHWASIA 15 May, 2017 25 May, 2017
  • page1.pdf
  • page1.pdf
  • page1.pdf
  • page1.pdf
  • 579 NIT Hiring of Vehicle AEN (Cluster) Bhinasar 15 May, 2017 25 May, 2017
  • Nit Bhinasar.pdf
  • 580 NIT No.5 XEN (T&C) Bikaner 16 May, 2017 23 May, 2017
  • momasar nit.pdf
  • 581 NIT No.1(2017-18) XEN (MPT&S), Bikaner 22 May, 2017 7 June, 2017
  • nit xen bkn 1.pdf
  • 582 NIT FOR HIRING VEHICLE AT 220 KV GSS DHORIMANNA 16 May, 2017 29 May, 2017
  • tender1.pdf
  • 583 NIT FOR OIL FILTRATION OF 100 MVA TR AT 220 KV GSS JALORE 16 May, 2017 5 June, 2017
  • NIT 100 MVA Tr. filtration.pdf
  • 584 SUPPLY OF SF-6 GAS CYLINDER AT 220 KV GSS DHORIMANNA 16 May, 2017 29 May, 2017
  • sf-6.pdf
  • 585 CONSENT OF SCHOOL BUS /VAN AT 220 KV GSS COLONY 16 May, 2017 31 May, 2017
  • School bus.pdf
  • 586 NIT FOR CLEANING WORK AT 220 KV GSS DHORIMANNA 16 May, 2017 29 May, 2017
  • claening dmn 1.pdf
  • cleaning dmn3.pdf
  • 587 Log sheet printing works at 132 KV GSS Salasar 18 May, 2017 25 May, 2017
  • log sheet 18-May-2017 11-26-34(1).pdf
  • 588 Emergency Repair work of 2 nos Towers of 132 KV D/C LILO Balesar line 18 May, 2017 18 May, 2017
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • 589 NIT FOR PRINTING OF LOGSHEET AT 132 KV GSS RAMSEEN 18 May, 2017 29 May, 2017
  • NIT Logsheet Ramseen Cluster.pdf
  • 590 NIT FOR PRINTING OF LOGSHEET AT 132 KV GSS SALASAR 18 May, 2017 25 May, 2017
  • log sheet 18-May-2017 11-26-34(1).pdf
  • 591 Extension of NIT for supply of Stationary items at ZCE (T&C), Jodhpur 19 May, 2017 25 May, 2017
  • page1.pdf
  • 592 Corrigendum Log sheet printing at 132 KV GSS Salasar 19 May, 2017 25 May, 2017
  • log sheet(1) 19-May-2017 10-50-00 Page 1.pdf
  • 593 Hiring of vehicle at 220 KV GSS Balotra 19 May, 2017 31 May, 2017
  • page1.pdf
  • page2.pdf
  • 594 Structure Painting work at 220 KV GSS Balotra 19 May, 2017 29 May, 2017
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • 595 NIT Hiring of Vehicle for o/o SE (T&C), Ratangarh 19 May, 2017 8 June, 2017
  • Ratanagrah hiring.pdf
  • 596 NIT Hiring of Vehicle o/o XEN 220 KV GSS Nokha 17 May, 2017 25 May, 2017
  • Tender hiring vehicle nokha.pdf
  • 597 NIB No.3 (2017-18) SE (T7C), Hanumangarh 22 May, 2017 12 June, 2017
  • BID Specification Tatarsar Line.pdf
  • 598 Bay maint work at 132 KV GSS Pali 23 May, 2017 7 June, 2017
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • 599 Line Patrolling & Tree Cutting work under 132 KV GSS Pali 23 May, 2017 2 June, 2017
  • page1.pdf
  • page2.pdf
  • 600 Hiring of Vehicle at 220 KV GSS BAP 24 May, 2017 5 June, 2017
  • page1.pdf
  • 601 NIT FOR HIRING VEHICLE BOLERO UNDER XEN T&C SIROHI 25 May, 2017 6 July, 2017
  • NIT C&M.pdf
  • 602 NIT FOR PAINTING AND YARD CLEANING AT 132 KV GSS JALORE 22 May, 2017 2 June, 2017
  • G.Yard cleaning.pdf
  • G.Painting.pdf
  • 603 Hiring of Vehicle at 220 KV GSS Badisid 23 May, 2017 5 June, 2017
  • NIT Badisid.jpg
  • 604 INSTALLATION OF CAPACITOR BANKS AT VARIOUS GSS'S UNDER SE(T&C), JODHPUR 24 May, 2017 2 June, 2017
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • page5.pdf
  • page6.pdf
  • page7.pdf
  • page8.pdf
  • page9.pdf
  • page10.pdf
  • page11.pdf
  • page12.pdf
  • page13.pdf
  • page14.pdf
  • page15.pdf
  • page16.pdf
  • page17.pdf
  • page18.pdf
  • page19.pdf
  • page20.pdf
  • page21.pdf
  • page22.pdf
  • page23.pdf
  • page24.pdf
  • page25.pdf
  • page26.pdf
  • page27.pdf
  • 605 Construction of 132 KV Bay at 220 KV GSS PHALODI 28 May, 2017 8 June, 2017
  • page1.pdf
  • page2.pdf
  • 606 Corrigendum ragarding TN-02(2017-18) TO TN-09(2017-18) UNDER SE(T&C) JODHPUR 25 May, 2017 2 June, 2017
  • page1.pdf
  • 607 Bay maint work at 220 KV GSS AAU 26 May, 2017 2 June, 2017
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • page5.pdf
  • 608 Trf. Augmentation work at 220 KV GSS Badisid 28 May, 2017 13 June, 2017
  • page1.pdf
  • page2.pdf
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • 609 Structure painting work at 132 KV GSS NPH, Jodhpur 26 May, 2017 2 June, 2017
  • page1.pdf
  • page2.pdf
  • 610 CORROGENDUM of 132 KV Bay at 220 KV GSS PHALODI 27 May, 2017 13 June, 2017
  • page1.pdf
  • 611 CONSENT FOR VARIOUS WORK AT 220 KV GSS JALORE 25 May, 2017 6 June, 2017
  • Yard Cleaning work.pdf
  • Line Petrolling and Tree Cutting of 220 KV Jalore.pdf
  • Bay Maintenance at 220 Jalore.17-18.pdf
  • 612 Construction of 132 KV Bay at 132 KV GSS PS-2 28 May, 2017 13 June, 2017
  • page1.pdf
  • page2.pdf
  • page1.pdf
  • subassets
  • page3.pdf
  • 613 CONSENT FOR YARD CLEANING AND LINE MAINTENANCE AT 220 KV GSS SAYALA 25 May, 2017 5 June, 2017
  • CONSENT OF YARD.pdf
  • line consent.pdf
  • 614 NIT Hiring of Vehicle at 220 Kv GSS Tehendesar 30 May, 2017 6 June, 2017
  • vehicle hir tehendesare.pdf
  • 615 Const. of 132 KV Bay (1 no) at 220 KV GSS Dechu 1 June, 2017 9 June, 2017
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • page4.pdf
  • page5.pdf
  • page7.pdf
  • page8.pdf
  • page6.pdf
  • 616 NIT FOR HIRING VEHICLE AT 220 KV GSS DHORIMANNA 30 May, 2017 9 June, 2017
  • hiring of vehicle 1.pdf
  • 617 NIT for Hiring of Vehicle AEN (Cluster), Bhinasar 1 June, 2017 15 June, 2017
  • nit 31 mar 2017 bhinasar.pdf
  • 618 NIT 1 (2017-18) SE (T&C), Bikaner 7 June, 2017 22 June, 2017
  • NIB 1.pdf
  • 619 NIT 2 (2017-18) SE (T&C), Bikaner 7 June, 2017 29 June, 2017
  • NIB 2.pdf
  • 620 Corrigendum regarding TN-15 (2017-18) under SE(T&C), Jodhpur 1 June, 2017 9 June, 2017
  • page1.pdf
  • 621 Various 220/132 KV Bays/Augmentation works (TN-10 to 14) under SE(T&C), Jodhpur 7 June, 2017 23 June, 2017
  • CORRIGENDUM.pdf
  • G-SCHEDULE.pdf
  • LETTER-PRO.pdf
  • 622 NIT NO. 7 & 8 AT XEN(T&C),RVPN BARMER 1 June, 2017 13 June, 2017
  • NIT NO. 07.PDF
  • NIT NO. 08.PDF
  • 623 Coorigendum in NIT for Vehicle o/o 220 KV GSS Tehendesar 1 June, 2017 12 June, 2017
  • New Doc 2017-06-01_1 CORRIGENDUM.pdf
  • 624 Erection of S/S structure/Bus Bar/Equipt/Earthing at 220 KV GSS Pali 2 June, 2017 16 June, 2017
  • PALLLIII.pdf
  • 625 Erection of S/S structure/Bus Bar/Equipt/Earthing at 132 KV GSS Tagore Nagar Pali 2 June, 2017 16 June, 2017
  • TAGORE NAGARRRR.pdf
  • 626 CONSENT FOR MAINTENANCE WORK AT 400 KV GSS BARMER 31 May, 2017 7 June, 2017
  • New Doc 2017-05-31.pdf
  • 627 Construction of 33 KV Bay at 220 kV GSS Badisid 7 June, 2017 28 June, 2017
  • G Scdu 16.43.pdf
  • Badisid NIT 16.43.pdf
  • 628 Construction of 33 kV Bay at 220 KV GSS Badisid(AUCB/16.44) 7 June, 2017 28 June, 2017
  • Badisid NIT 16.44.pdf
  • G scl 16.44.pdf
  • 629 Construction of 33 kV Bay at 220 KV GSS Kanasar(AUCB/16.45) 7 June, 2017 28 June, 2017
  • NIT 16.45.pdf
  • g scdl 16.45.pdf
  • 630 Construction of 33 kV Bay at 132 KV GSS Khetusar(AUCB/16.46) 7 June, 2017 28 June, 2017
  • NIT 16.46.pdf
  • G sch 16.46.pdf
  • 631 Hiring of vehicle at AEN (Cluster), Osiyan 5 June, 2017 16 June, 2017
  • OSIA-2.pdf
  • 632 Extension of NIT 1 (2017-18) o/o XEN (MPT&S), Bikaner 22 May, 2017 12 June, 2017
  • NIT Extension Hiring MPT S.pdf
  • 633 NIT Hiring of Vehicle o/o AEN (Cluster), Napasar 7 June, 2017 16 June, 2017
  • NIT Hiring Cluster napasar.pdf
  • 634 Corrigendum NIT 1(2017-18) o/o XEN (MPT&S), Bikaner 22 May, 2017 12 June, 2017
  • corrigendum nit mpts.pdf
  • 635 Construction of Cap bank Bay at 220 KV GSS Bhopalgarh 8 June, 2017 27 June, 2017
  • tender documents.pdf
  • 636 Construction of Cap Bank at 132 KV GSS Jojawar 8 June, 2017 27 June, 2017
  • 95.docx
  • 93.PDF
  • 637 Painting of Transformer at 220 KV GSS Jodhpur 8 June, 2017 15 June, 2017
  • 91.PDF
  • 92.PDF
  • 638 NIT Hiring of vehicle SE(T&C), Hanumangarh 6 June, 2017 13 June, 2017
  • Vehicle NIT hanumangarh.pdf
  • 639 Const. of 132 KV Bay (1 no) at 220 KV GSS Dechu (DATE EXTENSION) 9 June, 2017 16 June, 2017
  • extn-nit-1.pdf
  • 640 EMERGENCY WORK OF EHV LINE UNDER SE(T&C),RVPN 9 June, 2017 10 June, 2017
  • Emergency.pdf
  • 641 Yard Cleaning work at 132 KV GSS Mandore 9 June, 2017 19 June, 2017
  • m-1.jpg
  • m-2.jpg
  • 642 EXTENTION OF NIT NO 5/17-18 AT 220 KV GSS DHORIMANNA 8 June, 2017 16 June, 2017
  • NIT dhor.pdf
  • 643 Line Patrolling work at 220 KV GSS Tinwari 13 June, 2017 20 June, 2017
  • Line patrolling case Tinwari.PDF
  • 644 NIT NO 9 TO 11 FOR HIRING VEHICLE AT XEN T&C BARMER 14 June, 2017 23 June, 2017
  • NIT-09.PDF
  • NIT-10.PDF
  • NIT-11.PDF
  • 645 Yard Cleaning at 220 KV GSS Bali 13 June, 2017 20 June, 2017
  • yard cleaning at 220 kv gss bali.pdf
  • 646 Corrigendum in NIB 2 &3 (2017-18) under SE (T&C), Hanumangarh 13 June, 2017 21 June, 2017
  • IMG_20170613_0003.pdf
  • 647 PAINTING WORK AT 220 KV GSS BALI 14 June, 2017 23 June, 2017
  • painting of structure at 220 KV GSS BALI 17-18.pdf
  • 648 EXTENTION OF NIT NO.07 TO 08 AT XEN(T&C),BARMER 13 June, 2017 26 June, 2017
  • Ext NIT-07.PDF
  • Ext-NIT-08.PDF
  • 649 NIT FOR REFILLING OF FIRE FIGHTING AT 132 KV GSS SANKAD 12 June, 2017 22 June, 2017
  • New Doc 2017-06-14 (1).pdf
  • 650 VARIOUS WORK AT 220KV GSS PINDWARA AS PER G SCHEDULE ON CLRC 14 June, 2017 25 June, 2017
  • CLRC WORKS 14.06.2017 PDF REVISED.pdf
  • Corrigendum 19.06.2017.pdf
  • 651 CLRC work at 132KV GSS Aburoad 16 June, 2017 26 June, 2017
  • CLRC WORKS 14.06.2017 ABU ROAD.pdf
  • 652 CLRC work at 132KV GSS RIICO Aburoad 16 June, 2017 26 June, 2017
  • CLRC WORKS 14.06.2017 (4) R.pdf
  • 653 NIT FOR 33 KV CAPACITOR BANK AT 132 KV GSS LOHAWAT 16 June, 2017 4 July, 2017
  • NIT CAP Lohawat.pdf
  • 654 NIT NO.03 FOR HIRING VEHICLE AT XEN(T&C) SIROHI 14 June, 2017 30 June, 2017
  • NIT hiring C&M.pdf
  • 655 NIT FOR CONSTRUCTION OF 132 KV BAY AT 220 KV GSS KANASAR 16 June, 2017 4 July, 2017
  • NIT SP Photo.pdf
  • 656 Corrigendum NIB 2 (2017-18) SE (T&C), Hanumangarh 20 June, 2017 20 June, 2017
  • CORRIGENDUM 20062017 Tatarsar GSS.pdf
  • 657 CONSENT FOR PAINTING WORK OF TRANSFORMER AT 132 KV GSS SWROOPGANJ 20 June, 2017 5 July, 2017
  • IMG_20170620_161010.jpg
  • 658 NIT CONSTRUCTION WORK OF CAPACITOR BANK AT 132 KV GSS CHANDAN 21 June, 2017 5 July, 2017
  • NIT for uploading.pdf
  • 659 Fabrication and fixing of extra cross arms on angle towers of 220 KV Interconnector line at Vivek Vihar Yojana 23 June, 2017 30 June, 2017

    Fabrication and fixing of extra cross arms on angle towers of 220 KV Interconnector line at Vivek...

  • NIB 01 2017-18.pdf
  • 660 Extension of NIB 1(2017-18) SE (T&C), Bikaner 23 June, 2017 7 July, 2017
  • Date extension Vehicle.pdf
  • 661 NIT FOR HIRING VEHICLE AT AEN CLUSTER BINASARA 27 June, 2017 11 July, 2017
  • NIT_03_1.pdf
  • bhinasar-11.pdf
  • 662 CONSENT FOR YARD CLEANING AT 220 KV GSS PHALODI 22 June, 2017 5 July, 2017
  • YARD.pdf
  • 663 Hiring of vehicle under AEN(Cluster), Osian 29 June, 2017 7 July, 2017
  • t-2.pdf
  • 664 Hiring of vehicle under AEN Cluster),Napasar 29 June, 2017 13 July, 2017
  • page1.pdf
  • page2.pdf
  • page3.pdf
  • corri-111.pdf
  • 665 Extension of various NITs issued under SE(T&C), Bhadla 27 June, 2017 10 July, 2017
  • page1.pdf
  • 666 Emergent repair work of damaged conductor of 132 KV S/C Tinwar-PS8 line 30 June, 2017 30 June, 2017
  • emer-2.JPG
  • emer-1.JPG
  • 667 CONSENT FOR VARIOUS WORK UNDER T&C SIROHI AT VARIOUS GSS 30 June, 2017 10 July, 2017
  • COnsent for G schdule 30.06.2017.pdf
  • 668 Cleaning work at 220 KV GSS Ratangarh 28 June, 2017 7 July, 2017
  • clenaig work at 220 RTGH.pdf
  • 669 Purchase of Stationery SE (T&C), Bikaner 27 June, 2017 4 July, 2017
  • stationery tender.pdf
  • 670 Extn of NITs under XEN (T&C), Bhadla 3 July, 2017 12 July, 2017
  • New Doc 2017-07-03.pdf
  • 671 Corrigendum-II NIT 3 (2017-18) AEN (Cluster), Bhinasar 3 July, 2017 3 July, 2017
  • Corregiundem NIT Bhinasar.pdf
  • 672 NIT 01 (2017-18) AEN (T&C), Hanumangarh 3 July, 2017 13 July, 2017
  • NIT NO-012017-18 for Tr. installation work at 132 KV GSS HMH 4050 MVA.pdf
  • 673 Emergent work at 220 KV Amarsagar-Phalodi line 4 July, 2017 7 July, 2017
  • IMG_20170705_0001.pdf
  • 674 STRUCTURE PAINTING WORK AT 132KV GSS ABUROAD 6 July, 2017 16 July, 2017
  • PAINTING WORK AT ABUROAD.pdf
  • 675 BN 1 (2017-18) XEN (T&C), Hanumangarh 6 July, 2017 17 July, 2017
  • BN 01 Cap Bank Gharsana FM.pdf
  • 676 BN 2 (2017-18) XEN (T&C), Hanumangarh 6 July, 2017 17 July, 2017
  • BN 02 Cap Bank Pilibanga.pdf
  • 677 BN 3 (2017-18) XEN (T&C), Hanumangarh 6 July, 2017 17 July, 2017
  • BN 03 Capacitor Bank Nohar FM.pdf
  • 678 BN 4 (2017-18) XEN (T&C), Hanumangarh 6 July, 2017 17 July, 2017
  • BN 04 TF Gharsana.pdf
  • 679 NIT 6 (2017-18) XEN (T&C), Bikaner 7 July, 2017 13 July, 2017
  • NIT 6 xen t&c.pdf
  • 680 Re-Extension of various NIT's under XEN (T&C), Bhadla 10 July, 2017 20 July, 2017
  • New Doc 2017-07-10.pdf
  • 681 NIT FOR HIRING OF VEHICLE AT SE(T&C),RAMGARH 11 July, 2017 25 July, 2017
  • NIT.07.PDF
  • 682 EMERGENT DISMENTALING WORK AT 220 KV GSS AMARSAGAR 11 July, 2017 17 July, 2017
  • amarsagrr.pdf
  • 683 Emergency repair work of damaged Conductor of 132 KV Tinwari-Chamu line 11 July, 2017 11 July, 2017
  • dd-1.pdf
  • dd-2.pdf
  • 684 NIB 07 (2017-18) XEN (T&C), Bikaner 13 July, 2017 19 July, 2017
  • Nib07.pdf
  • 685 Transportation of Transformer from 132 KV GSS Khetusar to 220 KV GSS Badisid 14 July, 2017 20 July, 2017
  • bb-22.pdf
  • bb-11.pdf
  • 686 Corrigendum NIT 06 (2017-18) XEN (T&C), Bikaner 13 July, 2017 18 July, 2017
  • corrigendum T&C.pdf
  • 687 Extension of NIT 01 (2017-18) AEN (T&C), Hanumangarh 11 July, 2017 17 July, 2017
  • Time Date Extension NIT 01 HMH TR Aug.pdf
  • 688 Repairing of damaged Conductor of 220 kV Tinwari-Phalodi line 14 July, 2017 14 July, 2017
  • d-66.pdf
  • d-55.pdf
  • 689 NIB 3 (2017-18) XEN (T&C) Ratangarh 14 July, 2017 26 July, 2017
  • NIB 03 2017-18 ( Bhanipura).pdf
  • 690 NIB 4 (2017-18) XEN (T&C) Ratangarh 14 July, 2017 26 July, 2017
  • NIB 04 2017-18 ( Bhasina).pdf
  • 691 NIB 5 (2017-18) XEN (T&C) Ratangarh 14 July, 2017 26 July, 2017
  • NIB 05 2017-18 ( Patlisar Fanta).pdf
  • 692 NIB 2 (2017-18) SE (T&C) Ratangarh 14 July, 2017 8 August, 2017
  • NIB Painting to FM.pdf
  • 693 Transportation of 132/33 KV, 20/25 MVA from 132 KV GSS Kolayat to 220 KV GSS Bhopalgarh 19 July, 2017 1 August, 2017
  • kaa-1.pdf
  • kaa-2.pdf
  • 694 Painting of 132/33 kV Transformers, Equipments & Steel Structures at 132 KV GSS Mandore 14 July, 2017 21 July, 2017
  • PAINTING-MANDORE.pdf
  • 695 Painting of 400/220/33 KV Transformers & Equipments at 400 KV GSS Jodhpur 14 July, 2017 21 July, 2017
  • PAINTING-400.pdf
  • 696 Transportation of 132/33 KV, 20/25 MVA Trf from 132 KV GSS PS-3 to 220 KV GSS Bilara 20 July, 2017 2 August, 2017
  • Q-11.pdf
  • Q1.pdf
  • Q-2.pdf
  • Q-3.pdf
  • Q-4.pdf
  • 697 Providing & Fixing of HPSV Lamps,Ballast,Capacitors & Tube Lights at 400 KV GSS Jodhpur 26 July, 2017 8 August, 2017
  • light-400 kv gss.pdf
  • 698 Extn of various NIT's under XEN(T&C), Bhadla 20 July, 2017 1 August, 2017
  • New Doc 2017-07-20 (1).pdf
  • 699 NIT Hiring of Vehicle SE (T&C), Ratangarh 21 July, 2017 31 July, 2017
  • Consent hiring.pdf
  • 700 NIT Tr. Aug. works at 220 KV GSS Tehendesar & 132 Kv GSS Parewera 21 July, 2017 18 August, 2017
  • NIT Augmentation.pdf
  • 701 NIT FOR HIRING OF VEHICLE AT 220 KV GSS DHORIMANNA 20 July, 2017 3 August, 2017
  • Notice Bid for upload 1.pdf
  • BID doucument 2.pdf
  • 702 INVITING QUOTATION AT 132 KV GSS SHEO 21 July, 2017 31 July, 2017
  • New Doc 2017-07-21.pdf
  • 703 Extension of NIB No-16 & 17 (2017-18) 21 July, 2017 28 July, 2017
  • nit-ex.pdf
  • 704 NIT-02 AT SE(T&C),JAISALMER 21 July, 2017 4 August, 2017
  • NIT02.pdf
  • 705 NIB No 08 XEN(T&C)BIKANER 24 July, 2017 31 July, 2017

    NIB No 08 XEN(T&C)BIKANER FOR INSTALLATION OF CAPACITOR BANK AT 132 KV GSS SHERERA AND SRI DU...

  • NIB 08 2017-2018.pdf
  • 706 TIME EXTENSION OF NIT NO. 07/2017-18 at SE(T&C),Ramgarh 26 July, 2017 18 August, 2017
  • NIT ramgarh.pdf
  • 707 EXTENSION OF NIB 03, 04 & 05/2017-18 26 July, 2017 3 August, 2017
  • nitext.pdf
  • 708 NIT Vehicle AEN -I T&C Ratangarh 28 July, 2017 22 August, 2017
  • NIT Vehicle AEn RTGH.pdf
  • 709 Repair works of Fire fightning system at 400 KV Bikaner 28 July, 2017 3 August, 2017
  • Fire fightning tender.pdf
  • 710 Extension of NIB No-16 & 17 (2017-18) under SE(T&C), Jodhpur 28 July, 2017 4 August, 2017
  • REVISED-LIGHT.pdf
  • 711 Aug. work of 132 KV Bays (2 nos) at 132 KV GSS PS-3 8 August, 2017 23 August, 2017
  • G SCH PS3.pdf
  • NIT PS3.pdf
  • 712 Aug. work of 220 /132 KV, 160 MVA Trf. at 220 KV GS Badisid 9 August, 2017 23 August, 2017
  • G schdule.pdf
  • NIt badisid.pdf
  • 713 Emergency repair of 220 KV D /C Bhawad- Bhopalgarh line CKT-II 3 August, 2017 4 August, 2017

    Emergency repair of 220 KV D/C Bhawad-Bhopalgarh line CKT-II

  • ENERGENCY.pdf
  • 714 Maint work at 220 KV GSS Tinwari (3rd Quarter) at CLRC Rates 4 August, 2017 18 August, 2017
  • Maintenance @ Tinwari 3rd Qtr.PDF
  • 715 Corrigendum BIN 3014301701
  • Corrigendum BN-3014301701.pdf
  • 716 Corrigendum BIN 3030001702
  • Corrigendum BN-3030001702.pdf
  • 717 OFFER FOR EMERGENT REPAIRING OF DAMAGE 220KV D/C TOWER LOC. NO. 109 OF 220KV D/C BHINMAL-SAYALA LINE 3 August, 2017 4 August, 2017
  • consent emergee.pdf
  • 718 Offer for emergent repair of damage 220 Kv S/C tower location no. 76 (A+0) of 220 Kv S/C Bhinmal-Dhorimanna line 8 August, 2017 9 August, 2017
  • 09.1.PDF
  • 09.2.PDF
  • 719 Offer for emergent repair of 220 Kv D/C tower location no. 109 (DA+0) of 220 KV D/C Bhinmal- Sayla line |( 8 August, 2017 9 August, 2017
  • 1.1.PDF
  • 2.2.PDF
  • 720 Maint. work at 220 KV GSS Tinwari 4 August, 2017 18 August, 2017
  • Maintenance @ Tinwari -5.PDF
  • 721 Aug of 132 KV Bays ( 2 nos) at 132 KV GSS PS-3 8 August, 2017 23 August, 2017
  • NIT PS3.1.pdf
  • G SCH PS3.1.pdf
  • 722 Aug of 220/132 kV,160 MVA Trf at 220 KV GSS Badisid 8 August, 2017 23 August, 2017
  • NIt badisid.1.pdf
  • G schdule.1.pdf
  • 723 PROVIDING & FIXING OF HPSV LAMPS,BALLAST,CAPACITORS & TUBE LIGHTS AT 400 KV GSS JODHPUR 26 July, 2017 8 August, 2017
  • jod-light.pdf
  • 724 Yard Cleaning work at 132 KV GSS Tagore Nagar Pali 8 August, 2017 17 August, 2017
  • TN-PALI.pdf
  • 725 Erection of Bay.Line work at 220 kV GSS Bali 26 July, 2017 8 August, 2017
  • BID-KANKANI.pdf
  • 726 Extn of Bid of Bay / Line work at 220 KV GSS Bali 8 August, 2017 18 August, 2017
  • Bid_extn_kankani.pdf
  • 727 General Cleaning work at 220 KV GSS Bhawad 7 August, 2017 14 August, 2017
  • BHAWAD.pdf
  • 728 Yard Cleaning work at 132 KV GSS Sojat City 8 August, 2017 14 August, 2017
  • SOJAT CLEANING.pdf
  • 729 Bay maint work at 132 kV GSS Sojat City 8 August, 2017 14 August, 2017
  • SOJAT-MAINT.pdf
  • 730 Structure painting at 132 KV GSS Sojat City 8 August, 2017 14 August, 2017
  • SOJAT-PAINTING.pdf
  • 731 Tree Cutting work under 132 KV GSS Sojat City 8 August, 2017 14 August, 2017
  • SOJAT-TREECUTTING.pdf
  • 732 General Cleaning work at 132 KV GSS KBHB, Jodhpur 9 August, 2017 16 August, 2017
  • CLEAN-KURI-1.pdf
  • 733 General cleaning work at 220 KV GSS Baithwasia 10 August, 2017 23 August, 2017
  • BAITH-AA.PDF
  • 734 GSS painting work at 132 KV GSS Sumerpur 10 August, 2017 17 August, 2017
  • boq.PDF
  • 735 Yard cleaning at 132 KV GSS Sumerpur 10 August, 2017 17 August, 2017
  • Yard Cleaning Work at 132kV Sumerpur (Pali)-2017-18.pdf
  • 736 Bay maint work at 220 KV GSS Baithwasia 10 August, 2017 23 August, 2017
  • BAITH-66.PDF
  • BAITH-77.PDF
  • 737 CONSENT FOR PAINTING WORK AT 132 KV GSS BARMER 11 August, 2017 21 August, 2017
  • New Doc 2017-08-11.pdf
  • 738 Yard cleaning work at 220 KV GSS Pali 9 August, 2017 24 August, 2017
  • pali-maint.pdf
  • 739 General Cleaning work at 132 KV GIS OPH Jodhpur 4 August, 2017 11 August, 2017
  • ophh-1.doc
  • ophh-2.docx
  • 740 Emergency Repair of broken disc insulator of 220 KV Tinwari - Phalodi line 13 August, 2017 13 August, 2017
  • Emergency Work on Date 13.08.2017.PDF
  • 741 E-BID FOR MODIFICATION OF EHV LINES UNDER T&C SIROHI 10 August, 2017 30 August, 2017
  • DFFC.pdf
  • 742 NIT FOR TRANSPORTATION OF TR FROM DHORIMANNA TO SANCHORE 14 August, 2017 1 September, 2017
  • NIB No. 08.pdf
  • 743 33 KV Bay work at 220 KV GSS Bhopalgarh 14 August, 2017 22 August, 2017
  • 33 kv bay work bhopagarh.pdf
  • 744 NIT for 220 KV GSS Halasar 18 August, 2017 13 September, 2017
  • NIT Halasar.pdf
  • 745 Bay Maintainence work at 220 KV GSS phalodi 14 August, 2017 30 August, 2017
  • Yard Maintenance.pdf
  • 746 CONSENT FOR VARIOUS WORK AT 220KV GSS BHINMAL ON CLRC 16 August, 2017 28 August, 2017
  • G schedule for various works at 220KV GSS Bhinmal.pdf
  • 747 CONSENT FOR VARIOUS WORK ON CLRC UNDER T&C JAISALMER 11 August, 2017 17 August, 2017
  • jaisamer.pdf
  • 748 CONSENT FOR EMERGENCY REPAIRING WORK OF TOWER OF 220 KV BHINMAL-DHORIMANNA LINE 16 August, 2017 21 August, 2017
  • BML-Dhorimanna.pdf
  • 749 CONSENT FOR EMERGENCY REPAIRING WORK OF TOWER OF 220 KV BHINMAL-SAYALA LINE 16 August, 2017 21 August, 2017
  • BHL-Saylla.pdf
  • 750 CONSENT FOR VARIOUS WORK AT 220 KV GSS BALOTRA 17 August, 2017 27 August, 2017
  • Clean.pdf
  • Paint.pdf
  • 751 CONSENT FOR MAINTENANCE WORK AT 132 KV GSS JALORE & JALORE 16 August, 2017 28 August, 2017
  • maintenance work of man.& jalore.pdf
  • 752 general cleaning work at 132 KV GSS OPH Jodhpur 4 August, 2017 11 August, 2017
  • G Schedule 132 kV OPH.pdf
  • 753 Installation of 33 KV CAPACITOR BANK 17 August, 2017 24 August, 2017
  • Limited NIT 03 capacitor Bank Nohar _0001.pdf
  • 754 Upkeeping at 132 KV GIS MBM Engineering College, Jodhpur 16 August, 2017 21 August, 2017
  • 2.MBM.pdf
  • 1.MBM.pdf
  • 755 General Cleaning works at 400 KV GSS Bikaner 17 August, 2017 24 August, 2017
  • General cleaning 400 BKN.pdf
  • 756 Log sheet printing at 400 KV GSS Bikaner 17 August, 2017 24 August, 2017
  • log sheet.pdf
  • 757 General Cleaning work at 220 KV GSS Jodhpur 14 August, 2017 25 August, 2017
  • 1.general cleaning.PDF
  • 758 Yard cleaning work at 220 KV GSS Jodhpur 14 August, 2017 25 August, 2017
  • 1.Yard Cleaning.PDF
  • 759 Dismentalling work at 132 KV GSS Pali 18 August, 2017 3 September, 2017
  • PAILI-DIS.pdf
  • 760 Structure Painting work at 132 KV GSS Pali 18 August, 2017 3 September, 2017
  • PALI-PAINT.pdf
  • 761 General cleaning works at 220 Kv GSS Bikaner 18 August, 2017 24 August, 2017
  • general cleaning 220 BKN.pdf
  • 762 Maint work at 132 KV GSS Mathania 16 August, 2017 26 August, 2017
  • pp-1.jpg
  • pp-02.jpg
  • pp-03.jpg
  • pp-04.jpg
  • 763 Construction of 132 KV Bay (Bera) at 220 KV GSS Bali 21 August, 2017 4 September, 2017
  • xen-2017-08-21.pdf
  • 764 General cleaning works at 132 KV GSS Pugal Road 18 August, 2017 24 August, 2017
  • general cleaning pugal road.pdf
  • 765 General Cleaning works at 220 KV GSS Gajner 21 August, 2017 28 August, 2017
  • clrc cleaning 220 gajner.pdf
  • 766 NIT-05(2017-18)-2 nos 33 KV Bays at 220 KV GSS Bhopalgarh 22 August, 2017 4 September, 2017
  • xen-ext.PDF
  • 767 Erection of 132/33 KV, 20/25 TRF. at 220 KV GSS Bhopalgarh 21 August, 2017 4 September, 2017
  • xen-aug.pdf
  • 768 Construction work of Capacitor bank at 132 KV GSS Anandpur Kaloo 21 August, 2017 4 September, 2017
  • xen-cap.pdf
  • 769 TIME EXTENTION OF NIT AT SE(T&C),JAISALMER 17 August, 2017 22 August, 2017
  • Regarding_upload_the_tender_extension_in_respect_of_SE_(T&C)_Jaisalmer.zip
  • 770 Emergent repair work of 220 KV Bhawad-Bhopalgarh line 22 August, 2017 23 August, 2017
  • bhawad-1.1.pdf
  • bhawad-1.8.pdf
  • 771 Bay maint work at 220 KV GSS Bilara 16 August, 2017 31 August, 2017
  • bilara.zip
  • 772 Patrolling of EHV lines at 400 KV GSS Bikaner 21 August, 2017 28 August, 2017
  • 1394_Consent_EHV Line Patrolling.pdf
  • 773 Yard cleaning work at 220 KV GSS Bhopalgarh 16 August, 2017 26 August, 2017
  • yard-bhopal.zip
  • 774 Ammendment-NIT-06(2017-18)-132 KV Bay at 220 KV GSS Bali 22 August, 2017 5 September, 2017
  • kan-55.PDF
  • 775 Bay maint work at 220 KV GSS Bhopalgarh 16 August, 2017 26 August, 2017
  • kank-66.zip
  • 776 Emergency repair/replacement of Insulator strings of 220 KV Tinwari-Phalodi line 22 August, 2017 22 August, 2017
  • emergency-final.PDF
  • 777
    778 Aug work of 132/33 KV, 20/25 MVA Trf. at 220 KV GS Bilara 22 August, 2017 4 September, 2017
  • bilara-augmentatiojn.PDF
  • 779 NIT for Hiring of Vehicle at 220 KV GSS Gajner 21 August, 2017 30 August, 2017
  • NIT Hiring Gajner.pdf
  • 780 QUOTATION FOR BREATHER SILICA GEL AT 132 KV GSS UNDOO 14 August, 2017 28 August, 2017
  • Breather & Silica Gel Undoo inviting Quotation.pdf
  • 781 CONTROL ROOM CLEANING AT 220 KV GSS BHINMAL 22 August, 2017 1 September, 2017
  • G Schedule for cleaning of control room.pdf
  • 782 Extn Augmentation of 2 Nos 132 KV Bays under XEN(T&C), Bhadla 23 August, 2017 7 September, 2017
  • New Doc 2017-08-23_1.pdf
  • 783 Cancellation of NIT- 132 KV Bay at 220 KV GSS Phalodi 23 August, 2017 23 August, 2017
  • 307.pdf
  • 784 Cancellation:- Aug work of 33 KV bays under XEN (T&C), Bhadla 23 August, 2017 23 August, 2017
  • soooolarr.pdf
  • 785 Yard cleaning work at 132 KV GSS Falna 24 August, 2017 31 August, 2017
  • fal-1.pdf
  • 786 Structure painting work at 132 KV GSS Falna 24 August, 2017 31 August, 2017
  • fal-5.pdf
  • 787 Structure dismentaling work at 132 KV GSS Sojat City 24 August, 2017 30 August, 2017
  • sojat-22.pdf
  • 788 Yard cleaning work at 400 KV GSS Jodhpur 24 August, 2017 3 September, 2017
  • yard-400.pdf
  • 789 Yard cleaning work at 132 KV GSS MANDORE 24 August, 2017 3 September, 2017
  • clean-mandore.pdf
  • 790 General Cleaning work at 400 KV GSS Jodhpur 24 August, 2017 3 September, 2017
  • general-ju.pdf
  • 791 Cleaning work at 132 KV GSS NPH, Jodhpur 24 August, 2017 31 August, 2017
  • yard cleaning work-NPH.pdf
  • 792 Switchyard cleaning work at 132 KV GSS Bhopalgarh 24 August, 2017 3 September, 2017
  • yard_bhopalgarh.zip
  • 793 Yard cleaning work at 400 Kv GSS Ratangarh 24 August, 2017 15 September, 2017
  • NIB Yard.pdf
  • 794 Yard Cleaning at 132 Kv GSS Churu 25 August, 2017 31 August, 2017
  • yard cleaning churu.pdf
  • 795 Bay maint work at 132 KV GSS Bhopalgarh 24 August, 2017 3 September, 2017
  • maint_bhopalgarh.zip
  • 796 Painting work at 132 KV GSS Pugal Road 24 August, 2017 1 September, 2017
  • painting at pugal road.pdf
  • 797 General Cleaning works at SE (T&C) Ratangarh 25 August, 2017 1 September, 2017
  • General cleaning works at 400 KV RTGH.pdf
  • 798 CONSENT FOR PAINTING WORK AT 220 KV GSS JALORE 23 August, 2017 1 September, 2017
  • Painting of structure and equipments at 220 KV GSS Jalore.pdf
  • 799 CONSENT FOR GENERAL CLEANING AT 220 KV GSS BALOTRA 28 August, 2017 4 September, 2017
  • Balotra.pdf
  • 800 Quotation from Authorized NHAI Consultant for uploading the 400 KV Akal-Jodhpur line crossing case at NH-15 23 August, 2017 29 August, 2017
  • W-1.JPG
  • W-2.JPG
  • 801 Yard cleaning at 132 KV GSS Sardar shahar 28 August, 2017 4 September, 2017
  • yrad cleaning sardar sahar.pdf
  • 802 Extension of NIT- 02 (2017-18) of SE(T&C), Jaisalmer 22 August, 2017 6 September, 2017
  • 78.pdf
  • 803 Emergent repair work of Damaged Towers of 132 KV Pokaran-Askandra line 28 August, 2017 28 August, 2017
  • 79.pdf
  • 804 Supply of Tyre-Tube under XEN (400 KV GSS), Barmer 28 August, 2017 4 September, 2017
  • tyre-tube.pdf
  • 805 Yard cleaning at 132 Kv GSS Sadulpur 28 August, 2017 4 September, 2017
  • yard cleaning201sadilpur.pdf
  • 806 Cancellation of NIT of Const. of 1 No 132 KV Bay at 220 KV GSS Kanasar 29 August, 2017 29 August, 2017
  • BHADLA-CANC.pdf
  • 807 Maint & Cleaning work at 220 KV GSS Bhawad 29 August, 2017 8 September, 2017
  • BHAWAD-CLRC.pdf
  • 808 Extn of Aug. work of 220/132 KV, 160 MVA Trf at 220 KV GSS Badisid 23 August, 2017 7 September, 2017
  • 813.pdf
  • 809 Yard Cleaning work at 220 KV GSS Pali 28 August, 2017 4 September, 2017
  • PALI-NIT.zip
  • 810 Yard Cleaning work at 220 KV GSS Phalodi 30 August, 2017 7 September, 2017
  • Yard cleaning-ph.pdf
  • 811 Cancellation of Tender at 220 KV GSS Bhopalgarh 29 August, 2017 29 August, 2017
  • Cancellatin -220 bh.pdf
  • 812 Cancellation of Tender at 132 KV GSS Bhopalgarh 29 August, 2017 29 August, 2017
  • Cancellation -132 bh.pdf
  • 813 Yard cleaning work at 220 KV GSS Ratangarh 30 August, 2017 5 September, 2017
  • Yard Cleaning Work at 220 KV GSS Ratangarh.pdf
  • 814 Painting work at 132 KV GSS sardar Shahar 30 August, 2017 8 September, 2017
  • NIB for Painting of Structure at 132 KV GSS%2c Sardarshahr.pdf
  • 815 Bay maint work at 132 KV GSS Banar 30 August, 2017 8 September, 2017
  • bana-1.pdf
  • 816 Maint work at 132 KV GSS Soorsagar 30 August, 2017 6 September, 2017
  • soor-1.jpg
  • soor-2.jpg
  • 817 Yard Cleaning works at 132 KV GSS Chandgoti 30 August, 2017 6 September, 2017
  • AEN132 KV GSS CHANDGOTHI.pdf
  • 818 Emergency Replacement of Disc Insulator of 220 KV Tinwari-Phalodi line 31 August, 2017 31 August, 2017
  • Emergency Repair Phalodi line 31.08.2017.PDF
  • 819 Painting work at 220 KV GSS Bhopalgarh 30 August, 2017 9 September, 2017
  • Painting_work_2017-18_at_220KV_GSS_Bhopalgarh.zip
  • 820 Switchyard cleaning work at 132 KV GSS Bhopalgarh 30 August, 2017 9 September, 2017
  • Switch_yard_cleaning_2017-18_at_132_KV_GSS_Bhopalgarh.zip
  • 821 Switchyard cleaning work at 132 KV GSS Bhopalgarh 30 August, 2017 9 September, 2017
  • Yard_cleaning_work_2017-18_at_220KV_GSS_Bhopalgarh.zip
  • 822 Maintenance work at 132 KV GSS Bhopalgarh 30 August, 2017 9 September, 2017
  • Swichyard_maintenance_work_2017-18_at_132_KV_GSS_bhopalgarh.zip
  • 823 Maintenance work at 220 KV GSS Bhopalgarh 30 August, 2017 9 September, 2017
  • Swithch_yard_maintenance_work_2017-18__at_220KV_GSS_Bhopalgarh.zip
  • 824 Yard cleaning at 132 KV GSS Salasar 31 August, 2017 7 September, 2017
  • Yard Cleaning salasar.pdf
  • 825 Yard cleaning at 132 KV GSS Sadulpur
  • Yard cleaning at Sadulpur.pdf
  • 826 Emergent repair work of 220 KV Bhawad-Bhopalgarh line 1 September, 2017 1 September, 2017
  • bhawad2.pdf
  • 827 Switch Yard cleaning work at 132 KV GSS Borunda 29 August, 2017 8 September, 2017
  • G-Shedule_Yard Cleaning_132 Borunda.pdf
  • NIT_Yard Cleaning_132 Borunda.pdf
  • 828 Maint work at 132 KV GSS Borunda 29 August, 2017 8 September, 2017
  • NIT_Maintenance_132 Borunda.pdf
  • 829 General & Yard cleaning works at 220 KV GSS Bikaner 31 August, 2017 7 September, 2017
  • yard & general cleaning 220 BKN.pdf
  • 830 CONSENT FOR VARIOUS WORK UNDER XEN(T&C),SIROHI 30 August, 2017 14 September, 2017
  • tree cuting clrc.pdf
  • consent tree.pdf
  • 831 Bay maintainence work at 220 KV GSS Bikaner 1 September, 2017 7 September, 2017
  • bay maint 220 bkn.pdf
  • 832 Date extension Yard cleaning Sardarsahar 4 September, 2017 11 September, 2017
  • Extension of date for submission of consent for Yard cleaning work 04.09.17.pdf
  • 833 Date Extension of NIT 5 to 9 o/o XEN (T&C) Kankani 4 September, 2017 14 September, 2017
  • NIT 5 to 9.PDF
  • 834 Date Extension NIT 06 o/o XEN (T&C), Kankani 4 September, 2017 14 September, 2017
  • NIT 6.PDF
  • 835 Bay maintainence work at 400 KV GSS Bikaner 5 September, 2017 11 September, 2017
  • bay maint.pdf
  • 836 NIT FOR AMC OF COMPUTER AND PRINTER AT SE(T&C),SIROHI 6 September, 2017 15 September, 2017
  • AMC-2017-18.pdf
  • 837 NIT FOR STATIONARY AT SE(T&C),SIROHI 6 September, 2017 15 September, 2017
  • Stationary-2017-18.pdf
  • 838 Yard cleaning at 220 KV GSS Sujangarh 5 September, 2017 15 September, 2017
  • yard cleaning sujangarh.pdf
  • 839 Date extension NIT o/o SE T&C Bhadla 6 September, 2017 15 September, 2017
  • bhadla 1.pdf
  • 840 Date extension NIT o/o XEN (T&C), Bhadla 6 September, 2017 19 September, 2017
  • New Doc 2017-09-06 (2) bhadla .pdf
  • 841 NIT02 for oil filtration at 220 KV GSS Sirohi 6 September, 2017 14 September, 2017
  • NIT 02 Dt 06.09.17.pdf
  • 842 NIT FOR AUGMENTATION WORK AT 220 KV GSS DHORIMANNA 4 September, 2017 19 September, 2017
  • barmerPDF.PDF
  • 843 NIT FOR CLEANING WORK OF PREMISES OF SE(T&C),RVPN,SIROHI OFFICE 7 September, 2017 19 September, 2017
  • Cleaning of building.pdf
  • 844 CONSENT FOR REPLACEMENT OF EARTH WIRE AT 132 KV GSS SHEO 7 September, 2017 17 September, 2017
  • 132 KV Sheo JSM Line.pdf
  • 845 Date extension of Yard cleaning work at 132 KV GSS Churu 7 September, 2017 14 September, 2017
  • Yard-Cleaning-Date-Extend churu .pdf
  • 846 General cleaning works at 132 KV GSS Pratap Nagar, Jodhpur 4 September, 2017 11 September, 2017
  • Yard pratp nagar.PDF
  • 847 Painting work at 220 KV GSS Pali 6 September, 2017 14 September, 2017
  • Painting 220 KV pali.pdf
  • 848 General Cleaning works at 220 KV GSS Udyog Vihar 7 September, 2017 13 September, 2017
  • 220 sgnr.pdf
  • 849 General Cleaning works at 132 KV GSS Raisinghnagar 7 September, 2017 15 September, 2017
  • rsgnr.pdf
  • 850 BN 6 (2017-18) o/o XEN (T&C) Hanumangarh 8 September, 2017 18 September, 2017
  • xen t&c hmgh.pdf
  • 851 Bay Maint. work at 220 KV GSS BAP 8 September, 2017 23 September, 2017
  • Bay Maintenance at 220 KV GSS Bap.pdf
  • 852 Cleaning works at 220 KV GSS BAP 8 September, 2017 23 September, 2017
  • Cleaning Works at 220 KV GSS Bap.pdf
  • 853 NIT Hiring of Vehicle under SE (T&C), Kankani 7 September, 2017 14 September, 2017
  • hiring kankani.pdf
  • 854 LIMITED TENDER 6 September, 2017 13 September, 2017

    LIMITED TENDER Supply of spare parts and repairing work for vehicle

  • xentnc vehicle.pdf
  • 855 supply of spare parts and repairing work of vehicle 6 September, 2017 13 September, 2017
  • aentnc vehicle.pdf
  • 856 General Cleaning works at 132 KV GSS Sri Ganganagar 11 September, 2017 18 September, 2017
  • Cleaning work.pdf
  • 857 Replacement of damaged earth wire of 132 KV Rajiasar - sardar sahar line 8 September, 2017 15 September, 2017
  • NIT restringing Rajiasar Sardarshahar line EW.pdf
  • 858 Restringing of Earth Wire of 132 Kv Padampur-Sri Ganganagar line 11 September, 2017 20 September, 2017
  • restringing of Earth wire.pdf
  • 859 Yard Cleaning work at 132 KV GSS Tagore Nagar (Pali) 8 September, 2017 15 September, 2017
  • TN Yard Cleaning.pdf
  • 860
    861 Log sheet printing work at 220 KV GSS Bali 7 September, 2017 14 September, 2017
  • NIT log sheet printing.pdf
  • 862 Control Room Cleaning work at 220 KV GSS Bali 7 September, 2017 14 September, 2017
  • control room cleaning1.1.pdf
  • 863 Patrolling of 400 KV Lines under 400 KV GSS JODHPUR 11 September, 2017 21 September, 2017
  • apple-1.pdf
  • 864 Bay maint. work at 400 KV GSS Jodhpur 11 September, 2017 21 September, 2017
  • apple-2.pdf
  • apple-3.pdf
  • 865 Bay maint. work at 220 KV GSS Bap 8 September, 2017 23 September, 2017
  • bap-m.pdf
  • 866 Yard cleaning work at 220 KV GSS Bap 8 September, 2017 23 September, 2017
  • bap-c.pdf
  • 867 Extn of NIT-01 of XEN (T&C), Jodhpur 8 September, 2017 14 September, 2017
  • xen.ext.JPG
  • 868 Supply of Stationary items under AEN(Cluster), Baori 11 September, 2017 19 September, 2017
  • NIT-03 For GSS Stationaries for AEN Cluster Baori.JPG
  • 869 Supply of Stationary items under AEN(Cluster), Osian 11 September, 2017 19 September, 2017
  • NIT-02 For GSS Stationaires for AEN Cluster Osian.JPG
  • 870 Stringing of E/W at various lines under SE(T&C), Jodhpur 12 September, 2017 22 September, 2017
  • earthwire-restr.pdf
  • 871 Yard cleaning work at 132 KV GSS Banar 11 September, 2017 18 September, 2017
  • banar-new.pdf
  • 872 NIT Hiring of Vehicle SE (T&C), Bikaner 12 September, 2017 19 September, 2017
  • hiring of vehicle SE.pdf
  • 873 Restringing of Earth wire of various lines under 220 KV GSS Bikaner 12 September, 2017 18 September, 2017
  • restringing bkn.pdf
  • 874 Cleaning works at 132 KV GSS Pugal road 12 September, 2017 18 September, 2017
  • cleaning pugal rd.pdf
  • 875 Date extension of NIB SE(T&C), Ratangarh 12 September, 2017 26 September, 2017
  • Corrigendum for BN 3030001703%2c 3030001704%2c 3030001705.pdf
  • 876 Re stringing of Earthwire of 132 KV Hissar-Amarpurathedi Line 11 September, 2017 21 September, 2017
  • NIT for restringing of Earth Wire.pdf
  • 877 Maint of lines under SE(T&C), Jaisalmer 8 September, 2017 13 September, 2017
  • 425 tender.pdf
  • 878 General Cleaning work at various GSS's under SE(T&C), Jaisalmer 8 September, 2017 13 September, 2017
  • 426 teender.pdf
  • 879 Dismentalling of 132/33 KV,20/25 MVA Trf. at 132 KV GSS Chamu 11 September, 2017 19 September, 2017
  • ch-1.JPG
  • ch-2.JPG
  • ch-3.JPG
  • 880 Construction of 33 KV Bay (1 no) at 132 KV GSS Sojat City 12 September, 2017 19 September, 2017
  • New Doc 2017-09-12.pdf
  • 881 Dismantling work of Capacitor Bank at 132 KV GSS Pipar City 12 September, 2017 19 September, 2017
  • New Doc 2017-09-12 (1).pdf
  • 882 Bay maint work at 132 KV GSS CHB, Jodhpur 13 September, 2017 20 September, 2017
  • CHB-22.pdf
  • 883 Cancellation of Tender- bay maint. work at 220 kV GSS Phalodi 13 September, 2017 13 September, 2017
  • Cacellation of NIC.pdf
  • 884 Tree Cutting work under XEN 220 KV GSS Bilara 13 September, 2017 20 September, 2017
  • Tree_Cutting_under_EHV_Lines_at_220_KV_GSS_BILARA.zip
  • 885 Bay maint work at 220 KV GSS Phalodi 13 September, 2017 29 September, 2017
  • Notice_Seeking_consent_of_switch_yard_maintenance_work_on_CLRC_at_220_KV_GSS_RVPN_Phalodi.zip
  • 886 CONSENT FOR RE-STRINGING OF EARTH WIRE OF LINES UNDER PINDWARA DIVISION 14 September, 2017 23 September, 2017
  • pindwara.pdf
  • 887 CONSENT FOR VARIOUS WORK AT 220 KV GSS BHINMAL 13 September, 2017 22 September, 2017
  • G schedule.pdf
  • 888 CONSENT FOR CONTROL ROOM CLEANING AT 220 KV GSS BHINMAL 13 September, 2017 22 September, 2017
  • consent bhinmal.pdf
  • 889 Painting work at 132 KV GSS Salasar 14 September, 2017 20 September, 2017
  • G Schedulem Painting Case Salasar.pdf
  • 890 Corrigendum in NIT o/o 220 KV GSS Bikaner 13 September, 2017 18 September, 2017
  • Corrigendum Bikaner.pdf
  • 891 Extn:- Augmentation of 220/132 KV, 160 MVA Trf at 220 kV GSS Badisid 14 September, 2017 26 September, 2017
  • 975.pdf
  • 892 Extn:-NIT-8(2017-18) Cap, Bank at 132 KV GSS Anandpur Kaloo 14 September, 2017 25 September, 2017
  • 987.PDF
  • 893 NIT FOR SUPPLYING SPARE PARTS AT 220 KV GSS DHORIMANNA 14 September, 2017 22 September, 2017
  • ABB SPARE.pdf
  • 894 Bay maint. work at 132 KV GSS Mandore 15 September, 2017 25 September, 2017
  • New_Doc_116.zip
  • 895 E TENDERING AT SE(T&C),RVPN,SIROHI 13 September, 2017 3 October, 2017
  • NIB.pdf
  • 896 Re-extension:- Aug. of 132 KV Bays(2 nos) at 132 KV GSS PS-3 18 September, 2017 5 October, 2017
  • bhadla-009.pdf
  • 897 Transformer Painting work at 220 KV GSS Bhawad 18 September, 2017 25 September, 2017
  • bhawaD-009.zip
  • 898 Painting work at 132 KV GSS Bhopalgarh 18 September, 2017 28 September, 2017
  • bhopalgarh-009.zip
  • 899 Purchase of Spares of 132 KV C.B at 132 KV GSS CHB, Jodhpur 18 September, 2017 28 September, 2017
  • CHB-KIT.pdf
  • 900 Painting works at 132 KV GSS Sri Dungargarh 18 September, 2017 27 September, 2017
  • Structure Painting 132 sdgh.pdf
  • 901 TIME EXTENSION OF NIT NO. 11/2017-18 AT SE(T&C) SIROHI 18 September, 2017 26 September, 2017
  • Extention nit.pdf
  • 902 Re-extension of NIT-01 under XEN(T&C), Jodhpur 18 September, 2017 20 September, 2017
  • cm-xen.JPG
  • 903 Extn:- Control Room cleaning work at 220 KV GSS Bali 19 September, 2017 26 September, 2017
  • Cleaning Extension.pdf
  • 904 Extn:- Bay Maint work at 220 KV GSS Bali 19 September, 2017 26 September, 2017
  • GSS Maint extension.pdf
  • 905 Extn:- Printing of Log sheet work at 220 KV GSS Bali 19 September, 2017 26 September, 2017
  • Yard Cleaning Extension.pdf
  • 906 NIT FOR DESERT COOLER UNDER T&C BARMER 18 September, 2017 25 September, 2017
  • barme nit.pdf
  • 907 CONSENT FOR STRINGING OF EARTH WIRE UNDER T&C JAISALMER 19 September, 2017 25 September, 2017
  • jaisalmerg shedule.pdf
  • 908 Painting works at 132 KV GSS Sri Ganganagar 19 September, 2017 27 September, 2017
  • painting case sgnr.pdf
  • 909 Painting at Steel structure & Equipments at 132 KV GSS Mathania 19 September, 2017 29 September, 2017
  • mat-paint.pdf
  • 910 Date extension NIt No 8 o/o SE T&C Bikaner 19 September, 2017 25 September, 2017
  • date extension hiring.pdf
  • 911 BID NO.2 o/o AEN (T7C), Sri ganganagar 19 September, 2017 29 September, 2017
  • Bid no 2 .pdf
  • 912 PAINTING WORK AT 220 KV GSS DHORIMANNA 19 September, 2017 29 September, 2017
  • Dhorimanna.pdf
  • 913 Restringing of earth Wire at 132 KV Boranada-Pali line 22 September, 2017 29 September, 2017
  • Revised_Consent_for_work_of_Stringing_of_Earth_wire_at_132KV_GSS_Pali.zip
  • 914 Transportation of 132/33 KV, 10/12.5 MVA Transformer and Associated works 23 September, 2017 3 October, 2017
  • to_upload_on_rvpn_web_portal.zip
  • 915 Stringing of Earth wire at 220 KV Lines under 220 KV GSS Bilara 23 September, 2017 29 September, 2017
  • stringing_work_of_earth_wire_220_KV_bilara_soorpura_line._.zip
  • 916 Stringing of Earth wire at 132 KV Lines under 220 KV GSS Bilara 23 September, 2017 29 September, 2017
  • stringing_of_earthwire_of_132KV_Bilara-Jodhpur_line.zip
  • 917 Construction of 2 X 220 KV Bays at 220 KV GSS Barli (TN-20) 26 September, 2017 11 October, 2017
  • TN-20.01.pdf
  • TN-20.02.pdf
  • 918 Augmentation work of 132/33 KV, 20/25 MVA TRf at 132 KV GSS Balesar (TN-21) 26 September, 2017 12 October, 2017
  • TN-21.01.pdf
  • TN-21.02.pdf
  • 919 Construction of 2 X 220 KV Bays at 220 KV GSS Jodhpur (TN-22) 26 September, 2017 12 October, 2017
  • TN-22.01.pdf
  • TN-22.02.pdf
  • 920 SHIFTING OF H-POLE FROM RAMDEORA WALKING TRACK NEAR VILLAGE GOYALON KI DHANI (TN-23) 26 September, 2017 12 October, 2017
  • TN-23.01.pdf
  • TN-23.02.pdf
  • 921 Transportation of 132/33 KV, 20/25 MVA trf from 132 KV GSS Chamu to 132 KV GSS Nathrau (TN-24) 26 September, 2017 11 October, 2017
  • TN-24.01.pdf
  • TN-24.02.pdf
  • 922 Structure Painting work at 220 KV GS Bilara 21 September, 2017 5 October, 2017
  • Fw__G_Schedule_&_Estimate_for_Strutcure_painting_work..zip
  • 923 Augmentation work of 132/33 KV, 10/12.5 MVA Trf at 132 KV GSS PS-8 (NARWA) 26 September, 2017 11 October, 2017
  • TN-19.00.pdf
  • 924 Yard Cleaning work at 220 KV GSS Bali 25 September, 2017 2 October, 2017
  • yard cleaning at 220 kv gss bali..pdf
  • 925 Extn:- NIT No-08 (2017-18), Const. of Cap bank at 132 KV GSS A.P.Kaloo 26 September, 2017 5 October, 2017
  • NIT-EXTN-PALI.PDF
  • 926 Extn:- Aug. work of 220/132 KV, 160 MVA Trf at 220 KV GSS Badisid 25 September, 2017 10 October, 2017
  • 1046.pdf
  • 927 Maint. of 220 & 132 KV GSS under Circle SE(T&C), Jodhpur, Cluster-Jodhpur 28 September, 2017 30 October, 2017
  • E-BID-FINAL.pdf
  • 25-JODHPUR.PDF
  • 928 Maint. of 220 & 132 KV GSS under Circle SE(T&C), Jodhpur, Cluster-Boranada 28 September, 2017 30 October, 2017
  • E-BID-FINAL.pdf
  • BORANADA.PDF
  • 929 Maint. of 220 & 132 KV GSS under Circle SE(T&C), Jodhpur, Cluster-Tinwari 28 September, 2017 30 October, 2017
  • 27-TINWARI.PDF
  • E-BID-FINAL.pdf
  • 930 NIT NO. 14 FOR NH CROSSING AT XEN(T&C),BARMER 22 September, 2017 4 October, 2017
  • Barmeer.PDF
  • 931 NIT NO 3 FOR SUPPLY OF TYRE AND TUBE AT XEN 220 KV GSS JALORE 25 September, 2017 4 October, 2017
  • Jalore.pdf
  • 932 CNSENT FOR RE-STRINGING OF EARTH WIRE AT 220 KV GSS BALOTRA 27 September, 2017 3 October, 2017
  • Balotra2.pdf
  • 933 Pre Bid Meeting Notice for TN-25 TO TN-27 under SE(T&C), Jodhpur 27 September, 2017 27 September, 2017
  • PRE BID MEETING NOTICE.pdf
  • 934 Corrigendum:- NIT issued under TN-19 to TN-23 (2017-18) under SE(T&C), Jodhpur 27 September, 2017 27 September, 2017
  • Corrigendum-TN-19-23.pdf
  • 935 Corrigendum:- NIT issued under TN-24 (2017-18) under SE(T&C), Jodhpur 27 September, 2017 27 September, 2017
  • Corrigendum-TN-24.pdf
  • 936 Replacement of E/W at 220 KV GSS Ratangarh 27 September, 2017 7 October, 2017
  • NIT for replacement of Broken earth wire.pdf
  • 937