S.no Name Start Date End Date Description Files
1 RVPN_EHV_A&SP_TN_1 2 September, 2016 28 September, 2016

Design, Manufacture, Testing at Works and Supply of 132 kV Single Core XLPE Cable for Establishin...

  • NIBASPTN1AND2.pdf
  • 2 RVPN_EHV_A&SP_TN_2 2 September, 2016 28 September, 2016

    Construction of 1.816 km 132 kV LILO of 132 kV Sakatpura-IA2 Line for 132 kV GSS at Dadabari (Kot...

  • NIBASPTN1AND2.pdf
  • 3 RVPN_EHV_A&SP_TN_4 7 October, 2016 15 November, 2016

    Design, supply and implementation of Information and Communication Technology (ICT) Infrastructur...

  • NIBASPTN4.pdf
  • 4 Extension of critical dates for NIB No. RVPN/EHV/A&SP/TN-4 28 November, 2016 9 December, 2016

    Design, supply and implementation of Information and Communication Technology (ICT) Infrastructur...

  • TN4extension.pdf
  • 5 RVPN_EHV_A&SP_TN_5 6 April, 2017 15 May, 2017

    Establishment of OPGW Network including Supply, Installation Of OPGW, Hardwares and other accesso...

  • NIB567.pdf
  • 6 RVPN_EHV_A&SP_TN_6 6 April, 2017 15 May, 2017

    Establishment of OPGW Network including Supply, Installation Of OPGW, Hardwares and other accesso...

  • NIB6.pdf
  • 7 RVPN_EHV_A&SP_TN_7 6 April, 2017 15 May, 2017

    Establishment of OPGW Network including Supply, Installation Of OPGW, Hardwares and other accesso...

  • NIB7.pdf
  • 8 Outsourcing of O&M of Substations in Jodhpur Zone 12 May, 2017 15 June, 2017

    Operation & Maintenance (Including Watch and Ward) of various 132 kV Substations in Jaisalmer...

  • NIBTN8.pdf
  • 9 Outsourcing of O&M of substations in Ajmer & Jodhpur Zone 12 May, 2017 15 June, 2017

    Operation & Maintenance (Including Watch and Ward) of various 132 kV Substations in Ratangarh...

  • NIBTN9.pdf
  • 10 Outsourcing of O&M of substations in Ajmer Zone 12 May, 2017 15 June, 2017

    Operation & Maintenance (Including Watch and Ward) of various 132 kV Substations in Chittorga...

  • NIBTN10.pdf
  • 11 Outsourcing of O&M of 2 Nos. substations of RSDCL along with transmission lines in Bhadala Solar Park Jodhpur 12 May, 2017 15 June, 2017

    Operation & Maintenance Work (Including Watch and Ward of Assets) of RSDCL’s 2 Nos. 220/132/3...

  • NIBTN11.pdf
  • 12
    13 RVPN_EHV_A&SP_TN_12 23 November, 2017 26 December, 2017

    Design, Manufacture, Testing at works and supply of 132kV Single core XLPE Cable for establishing...

  • page1.pdf
  • 14 DESIGN_TN- 01_2018-19_BN-9011001801 14 May, 2018 16 July, 2018

    Purchase of Design  and Testing of 220kV and 132kV D/C & S/C Transmission line towers al...

  • EBIDNOTICE.pdf
  • 15 RVPN_EHV_A&SP_TN_17 7 June, 2018 9 July, 2018

    Maintenance of various 220 kV & 132 kV substations under RVPN trnasmission system (Jaipur Zon...

  • TN17181920NIB.pdf
  • 16 RVPN_EHV_A&SP_TN_18 7 June, 2018 9 July, 2018

    Maintenance of various 220 kV & 132 kV substations under RVPN trnasmission system (Jaipur Zon...

  • TN17181920NIB.pdf
  • 17 RVPN_EHV_A&SP_TN_19 7 June, 2018 9 July, 2018

    Maintenance of various 220 kV & 132 kV substations under RVPN trnasmission system (Ajmer Zone...

  • TN17181920NIB.pdf
  • 18 RVPN_EHV_A&SP_TN_20 7 June, 2018 9 July, 2018

    Maintenance of various 220 kV & 132 kV substations under RVPN trnasmission system (Jodhpur Zo...

  • TN17181920NIB.pdf
  • 19 RVPN_EHV_A&SP_TN-14 27 June, 2018 30 July, 2018

    DESIGN, SUPPLY AND IMPLEMENTATION OF RENEWABLE ENERGY INTEGRATION- REAL TIME DATA ACQUISITION SYS...

  • NIBTN14.pdf
  • 20 AMENDMENT IN CRITICAL DATES - NIB NO. RVPN_EHV_A&SP_TN_14 27 June, 2018 30 August, 2018

    CORRIGENDUM IN BID END SUBMISSION & OPENING DATES

    DESIGN, SUPPLY AND IMPLEMENTATION OF...

  • CorrigendumdatesTN-14_0001.pdf
  • 21 Supply of 105 KL unused inhibited high grade insulating oil conforming to IEC-60296 as per parameters specified in technical specification, at 400 KV GSS Akal Jaisalmer 30 October, 2018 15 November, 2018

    Supply of 105 KL unused inhibited high grade insulating oil conforming to IEC-60296 as per parame...

  • NIBNOTICE.pdf
  • 22 Various tenders for 400 kV GSS maintenance in Rajasthan, Counterpoise earth set on EHV Lines & Emergency Response Team 21 December, 2018 22 January, 2019

    Various tenders for 400 kV GSS maintenance in Rajasthan, Counterpoise earth set on EHV Lines &...

  • nib new.pdf
  • 23 RVPN/EHV/A&SP/TN-38 1 February, 2019 15 February, 2019

    Height Raising work of Existing 220 kV D/C Beawar-Bilara & Beawar-RAS Line at Bangargram (Bea...

  • NIBTN-38-41.pdf
  • 24 RVPN/EHV/A&SP/TN-39 1 February, 2019 15 February, 2019

    Height Raising work of Existing 132 kV S/C Beawar-Merta Line at Bangargram (Beawar) for DFCC Rail...

  • NIBTN-38-41.pdf
  • 25 RVPN/EHV/A&SP/TN-40 1 February, 2019 15 February, 2019

    Height Raising work of Existing 132 kV S/C Beawar-Jaitaran Line at Bangargram (Beawar) for DFCC R...

  • NIBTN-38-41.pdf
  • 26 RVPN/EHV/A&SP/TN-41 1 February, 2019 15 February, 2019

    Modification work of 132 kV S/C Line between 220 kV GSS Ajmer and 132 kV GSS Subash Nagar for Rai...

  • NIBTN-38-41.pdf
  • 27 Construction of 220kV, S/C 2-Phase Transmission Line between 400kV GSS, Ajmer to 220/25kV TSS Kishangarh with overhead and underground [using 220kV XLPE Cable system (2 phase + 1 spare)] sections. 11 March, 2019 10 April, 2019

    Construction of 220kV, S/C 2-Phase Transmission Line between 400kV GSS, Ajmer to 220/25kV TSS Kis...

  • NIT_TN_42_46.pdf
  • 28 Construction of 132kV, D/C Transmission Line between 132kV GSS, Newai to 132/25kV TSS Newai including Road/ Railway Track crossing [using 132kV XLPE Cable system (each circuit having 2 phase)]. 11 March, 2019 10 April, 2019

    Construction of 132kV, D/C Transmission Line between 132kV GSS, Newai to 132/25kV TSS Newai inclu...

  • NIT_TN_42_46.pdf
  • 29 Construction of 132kV S/C Transmission line between 220kV GSS, NPH to 132/25kV TSS Railways at Jaipur including Road and Railway track crossing [using 132kV XLPE cable system (2 phase + 1 spare)]. 11 March, 2019 10 April, 2019

    Construction of 132kV S/C Transmission line between 220kV GSS, NPH to 132/25kV TSS Railways at Ja...

  • NIT_TN_42_46.pdf
  • 30 Height raising work of existing 220kV S/C Niwana – Heerapura line at Location No.440 & 441 on Jaipur – Phulera track between TP No.247/2 to 247/3 under deposit work of Railways 11 March, 2019 10 April, 2019

    Height raising work of existing 220kV S/C Niwana – Heerapura line at Location No.440 & 441 on...

  • NIT_TN_42_46.pdf
  • 31 Modification work of existing 220kV D/C Heerapura – Chomu – Renwal Line at crossing across Railway track in Jaipur – Kanakpura between location No.248/6-7 as deposit work of Railways 11 March, 2019 10 April, 2019

    Modification work of existing 220kV D/C Heerapura – Chomu – Renwal Line at crossing across Railwa...

  • NIT_TN_42_46.pdf
  • 32 RVPN/EHV/A&SP/TN-47 7 June, 2019 24 June, 2019

    MODIFICATION WORK OF EXISTING 132 KV S/C KHUSHKHER-NAHAR INDUSTRIES LINE BETWEEN LOCATION NO. 20-...

  • NIBTN-47.pdf