  COMML.JDP/ 826 Extension of "Amnesty Scheme" for disconnected consumers in domestic/non domestic & agriculture category 18.10.2017
  COMML.JDP/ 825 Guidelines regarding quarterly information of frequency and total duration of outage in view of Ease of Doing Business (EoDB). 13.10.2017
  COMML.JDP/ 824 कृषि मीटर्ड श्रैणी के मीटर बंद /खराब होने की स्थिति में उर्जा खपत के आकलन के सम्बन्ध में | 12.10.2017
  COMML.JDP/ 823 Guideline regarding procedure for obtaining New Industrial Electricity Connection in view of Ease of Doing Business (EoDB) 06-10-2017
  COMML.JDP/ 822 Regarding procedure for Settlement of Solar Energy from Captive Solar Plant in Rajasthan under Open Access. 04.10.2017
  COMML.JDP/ 821 वी.सी.आर. प्रकरणों की सुनवाई के सम्बन्ध में | 04.10.2017
  COMML.JDP/ 820 Allowing Connections/Load extension for contract recorded demand for more than 50 KVA from Nigam's Transformer
27.09.2017
  COMML.JDP/ 819 Prompt Replacement of Burnt Energy Meter 27.09.2017
  COMML.JDP/ 818 Wide Publicity of various schemes launched by Jodhpur Discom to recover Outsatnding Dues and to provide domestic connection 11.09.2017
  COMML.JDP/ 817 Recovery of enhanced securiy in installments 11.09.2017
  COMML.JDP/ 816 Applicabilty of Tarrif fro bulk milk Chillers 11.09.2017
  COMML.JDP/ 815 कर्षि  मिटर श्रेणी मिटर बांध खराब होने के स्थिति में ऊर्जा खपत  के  अंकलन के संबंध में। 11.09.2017
  COMML.JDP/ 814 Extension of"Amnesty Scheme" for disconnected consumers in Domestic and non domestic category 30.08.2017
  COMML.JDP/ 813 कृषि कनेक्शन के अनाधिकृत बढे हुए भार  की "स्वैच्छिक भार वृद्धि घोषणा" योजना लागू करने के संबंध में 30.08.2017
  COMML.JDP/ 812 Guidelined regarding metering and routine testing/checking of temporary connection 24.08.2017
  COMML.JDP/ 811 Electrification of Colonies(Plotted Development) 24.08.2017
  COMML.JDP/ 810 क्रषी उपभोक्ताओ द्वारा जले हुए  ट्रान्स्फ़ोर्मर बदलने के संबंध में सयोग राशि  बाबत 21.08.2017
  COMML.JDP/ 809 Disposal of pending VCR's up to 30.6.2017 04.08.2017
  COMML.JDP/ 808 Disposal of Redundant Lines. 03.08.2017
  COMML.JDP/ 807 Loss Reduction Programme में किये गए कार्य की समीक्षा उपरांत कार्यवाही के संबंध में. 03.08.2017
  COMML.JDP/ 806 Replacement of Defective/Stooped Meters. 03.08.2017
  COMML.JDP/ 805 Correct reading of Auxiliary  Consumption at RRVPN's GSS. 03.08.2017
  COMML.JDP/ 804 Declaring Distribution Transformer as burnt -Procedure. 03.08.2017
  COMML.JDP/ 803 Mandatory inspection of one 11 KV feeder by each officer of Discom cross checking of activites assinged by feeder incharge 03.08.2017
  COMML.JDP/ 802 Disposal of pending VCR's Upto 30.6.2016 31.07.2017
  COMML.JDP/ 801 "Amnesty Scheme" for disconnected consumers in domestic and non domestic category 12.07.2017
  COMML.JDP/ 800 Regarding non requirement of electrical inspector/self certification of installation in caser ofincrease/decrease of load/demand 04.07.2017
  COMML.JDP/ 799 ग्रामीण घेर आबादी क्षेत्र में घरेलू कनैक्शन दिये जाने के संबंध में 30.6.2017
  COMML.JDP/ 798 विद्युत कनैक्शन जारी करने के संबंध में दिशा निर्देश 30.6.2017
  COMML.JDP/ 797 Clarification of term "Occupier"

27.06.2017

 

  COMML.JDP/ 796 Regarding Self Certification of installation 23.06.2017
  COMML.JDP/ 795 Implementaions of provisions of Connectivity and Net Metering for RoofTop and small solar grid interactive syetem under Net metering Regulation 2015 21.06.2017
  COMML.JDP/ 794 Nomination of independent member at Circle level grievences redressal cum settlement forum 20.06.2017
  COMML.JDP/ 793
असामान्य मीटर रीडिंग के मामलों में बिलिंग संबंधी दिषा-निर्देष।
20.06.2017
  COMML.JDP/ 792 Regarding not charging shunt capacitor surcharge from agriculture consumer 20.06.2017
  COMML.JDP/ 791 नए विद्युत संबंध हेतु सर्विस लिने उपलबद्ध करवाने के संबंध में 19.06.2017
  COMML.JDP/ 790 Periodic testing of all catagories of Consumers ans analysing the output data provided by the meter reading agencies. 13.06.2017
  COMML.JDP/ 789 Prepartion of cost estimates,overhead /supervision charges for Deosit work 13.06.2017
  COMML.JDP/ 788  Amnesty Scheme for disconnected consumers in domestic category. 06.06.2017
  COMML.JDP/ 787 Directions for release and load extension of Industrial /NDS Connections upto 33 Kv voltage 02.06.2017
  COMML.JDP/ 786

लंबित सतर्कता जांच प्रतिवेदनो के अंतिम निस्तारण के संबंध में 01.06.2017
  COMML.JDP/ 785 ग्रामीण गेर आबादी क्षेत्र में घरेलू कनैक्शन दिये जाने के संबंध में 30.5.2017
  COMML.JDP/ 784 Revised Procedure for teh electrification of  Colonies,Multistoried Buildings and Townships. 08.05.2017
  COMML.JDP/ 783 Regarding release of new industrial/non-domestic connection and extension/reduction in connected load/ contract demand. 03.05.2017
  COMML.JDP/ 782 लम्बित सतर्कता जांच प्रतिवेदनो के अंतिम निस्तारण के संबंध में 02.05.2017
  COMML.JDP/ 781 ग्रामीण क्षेत्र में घरेलु कनेक्शन हेतू शूल्क के सम्बन्ध में। 24.04.2017
  COMML.JDP/ 780 Information Regarding T&D and AT&C Losses of District Headquaters Municipal Towns & Industrial Feeder.

21.04.2017

 

  COMML.JDP/ 779 Utilization of HT & MIP Boxes in Field 21.04.2017
  COMML.JDP/ 778 Regarding approval of Metering on LT side 12.04.2017
  COMML.JDP/ 777 Regarding Location of Meter /Metering Equipments 06.04.2017
  COMML.JDP/ 776 ग्रामीण क्षेत्र में सरकारी विद्यालय मे कनेक्शन जारी कर  के सम्बन्ध में। 05.04.2017
  COMML.JDP/ 775 Extension of Amnesty Scheme for Regular disconnected domestic and agriculture category connections upto 30.4.2017. 03.04.2017
  COMML.JDP/ 774 कृषि श्रेणी में बढाई गई बिजली दरों को वापस लेने के संदर्भ में। 03.04.2017
  COMML.JDP/ 773 ग्रामीण क्षेत्र में घरेलु कनेक्शन जारी किये जाने हेतु निर्धारित दर के सम्बन्ध में। 03.04.2017
 

COMML.JDP/ 772

Calculations for fuel surcharge

Fuel surcharge amount for second ,third& fourth quarter of FY2016-17. 03.04.2017
  COMML.JDP/ 771 Regarding testing of removed defective Meter/ CT / CT PT Sets.

30.03.2017

  COMML.JDP/ 770 Regarding recovery of application fee with application for activities other than new connection

30.03.2017

  COMML.JDP/ 769

मीटर एवं फ्लेट रेट श्रेणी के कृषि उपभोक्ताओं के भार की जाँच के सम्बन्ध में।

30.03.2017

  COMML.JDP/ 768

विद्युत संबंध के नाम परिवर्तन के मामले में ली जाने वाली राषि के संबंध में।

30.03.2017

  COMML.JDP/ 767 Exemption of Electricity Duty from wind power for captive use as per notification dated 01.10.15.

30.03.2017

  COMML.JDP/ 766

अंकेक्षण दल द्वारा उपभोक्ता से वसूली हेतु निर्धारित राषि को उपभोक्ता के बिल में जोडने के संदर्भ में।

15.03.2017

  COMML.JDP/ 765 कृषि श्रेणी में बढाई गई बिजली दरों को वापस लेने के संदर्भ में। 3.3.2017
  COMML.JDP/ 764 "Amnesty Scheme" for Government connections for realization of outsatnding dues 1.3.2017
  COMML.JDP/ 763 Clarification on Comml/JDP/448 regarding shifting of electrical lines and other structures which are hazardous to human life 27.2.2017
  COMML.JDP/ 762 Energy Audit at 33 KV Voltage level 27.2.2017
  COMML.JDP/ 761 कृषि श्रेणी में बढाई गई बिजली दरों को वापस लेने के संदर्भ में। 20.2.2017
  COMML.JDP/ 760 विद्युत उपभोक्ताओं की शिकायतों के निराकरण हेतु शिविर आयोजित करने के सम्बन्ध में। 20.2.2017
  COMML.JDP/ 759 मीटर श्रेणी के कृषि उपभोक्ताओं के भार की जाँच के सम्बन्ध में। 20.2.2017
  COMML.JDP/ 758 Guidelines for dealing/treating cases in which the LT Supply consumers exceed their Contract Demand above 50 KVA for more than twice in a Financial Year 16.2.2017
  COMML.JDP/ 757 Ratification of order no Comml.JDP/738 dtd 10.11.2016 issued by Commercial wing. 7.2.2017
  COMML.JDP/ 756 ग्रामीण क्षेत्रों में घरेलू कनेक्शन जारी करने के सम्बन्ध में। 3.2.2017
  COMML.JDP/ 755 बिजनिस रजिस्ट्रेशन नम्बर के सम्बन्ध में। 3.2.2017
  COMML.JDP/ 754 मुख्यमंत्री ग्रामीण घरेलू कनेक्षन योजना। 1.2.2017
  COMML.JDP/ 753 कृषि कनेक्शनों के अनाधिकृत बढ़े हुये भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना‘‘ की अवधि पुनः बढाने बाबत्। 1.2.2017
  COMML.JDP/ 752 "Amnesty Scheme" for regular disconnected consumers for realization and outstanding dues 1.2.2017
  COMML.JDP/ 751 Regarding Tariff payble to teh consumers for excess energy supplied to Discom under Net Metering regulation,2015 11.1.2017
  COMML.JDP/ 750 निवेषकों से उद्यम स्थापना पूर्व का पंजीयन/उद्यमिता ज्ञापन/उद्योग आधार मेमोरेण्डम की मांग नहीं करने बाबत्। 3.1.2017
  COMML.JDP/ 749 Extension of "Amnesty Scheme" for disconnected consumers for realization of outstanding dues. 30.12.2016
  COMML.JDP/ 748 कृषि कनेक्षन के अनाधिकृत बढे हुए भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना’’ की अवधि बढाने बाबतें। 30.12.2016
  COMML.JDP/ 747 मुख्यमंत्री ग्रामीण घरेलू कनेक्षन योजना। 30.12.2016
  COMML.JDP/ 746 "Amnesty Scheme " for regular disconnected consumers for realization outstanding dues. 16.12.2016
  COMML.JDP/ 745
मुख्यमंत्री ग्रामीण घरेलू कनेक्षन योजना।
08.12.2016
  COMML.JDP/ 744 "Amnesty Scheme"for regular disconnected consumers for realization of of outstanding dues 29.11.2016
  COMML.JDP/ 743 Constitution of Working Committe 28.11.2016
  COMML.JDP/ 742 कृषि कनेक्षन के अनाधिकृत बढे हुए भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना’’ की अवधि बढाने बाबतें। 28.11.2016
  COMML.JDP/ 741 Procedure for Installation replacement of meters. 18.11.2016
  COMML.JDP/ 740 Simplification in the procedure for change in the Name of connection . 18.11.2016
  COMML.JDP/ 739 मुख्यमंत्री ग्रामीण घरेलू कनेक्षन योजना। 15.11.2016
  COMML.JDP/ 738 Recovery of Fuel Surcharge amount for first quater of Fy 2016-17 10.11.2016
  Calculation  
  COMML.JDP/ 737 Billing of consumers having and Net metering and Grid connectivity of grid connected Rooftop and SSPVs 10.11.2016
  COMML.JDP/ 736 मुख्यमंत्री ग्रामीण घरेलू कनेक्षन योजना। 28.10.2016
  COMML.JDP/ 735 कृषि कनेक्षन के भार क्रा सघन अभियान 26.10.2016
  COMML.JDP/ 734 Replacement of Defective Meters 21.10.2016
  COMML.JDP/ 733 ग्रामीण क्षेत्र में अनाधिकृत पेयजल योजनाओं के नियमित कनेक्षन करने हेतु दिषा निर्देष। लागू करने के संबंद्य में 07.10.2016
  COMML.JDP/ 732 Amnesty Scheme for disconnected consumers of all catgories for realization of outstanding dues 29.09.2016
  COMML.JDP/ 731 Tariff for Supply of Electricity-2016 29.09.2016
  COMML.JDP/ 730 Procedure for replacement of burnt/failed distribution transformers in rural area 20.09.2016
  COMML.JDP/ 729 Chief Minister's rural domestic connection Scheme. 02.09.2016
  COMML.JDP/ 728 कृषि कनेक्षन के अनाधिकृत बढे हुए भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना’’ लागू करने के संबंद्य में। 07.09.2016
  COMML.JDP/ 727 Directions in respect of existing provision of clause 51(5)(6) of TCOS-2004,Redressal of Consumer grieveance. 02.09.2016
  COMML.JDP/ 726 सघन वसूली अभियान 26.08.2016
  COMML.JDP/ 725 Clarification on Comml.JDP1713 regarding shifting of electric lines (HTILT Overhead) and other structures which are hazardous to human life & property during the campaign of "Surakshit Bijli Abhiyan". 05.08.2016
  COMML.JDP/ 724 Detailed Guideline and Procedure for Net metering and Grid Connectivity of Grid Connected Roof Top and small Solar Photovoltic system. 05.08.2016
  COMML.JDP/ 723 Rectification of order no 414 dated 28.06.16 issued by commercial wing regarding amnesty scheme. 29.07.2016
  COMML.JDP/ 722 Reconstitution of Appellate Authority Committees. 06.07.2016
  COMML.JDP/ 721 Guidelines for erection of GBM/RTT/RTP & putting up of Cellof Wheels (COW) & Micro-cells on Govt.lPSU/ULBIAutonomousBodiesl Co-operative Institutionsl Panchayati RajInstitutions Land &Buildings. 06.07.2016
  COMML.JDP/ 720 Amnesty Scheme for disconnected consumers of all categories (disconnected upto or prior to 31.03.2015) for realization of outstanding dues. 28.06.2016
  COMML.JDP/ 719 Simplification of procedure for obtaining new Electricity connection in view of ‘Ease of Doing Business’. 13.06.2016
  COMML.JDP/ 718 Expense for obtaining new Industrial Electricity Connection under "Ease of doing Business" . 09.06.2016
  COMML.JDP/ 717 Detailed Guideline & procedure for grant of availing Open Access 02.06.2016
  COMML.JDP/ 716 Detailed Guideline & procedure for Net metering and Grid Connectivity of Grid Connected Rooftop & Small Photovoltic Systems. 01.06.2016
  COMML.JDP/ 715 The Rajasthan sick macro & small Enterprises (Revival and Rehabilitations) scheme,2015 31.05.2016
  COMML.JDP/ 714 Simplification in the procedure of obtaining new Electricity connection in view of doing ease of business 31.05.2016
  COMML.JDP/ 713 Shifting of electric lines (LT/HT overheads) and other structure which are hazardous to human life and property during the campaign of "Surakshit bijli abhiyan". 12.05.2016
  COMML.JDP/ 712 Provision for single point electric supply for residential purpose. 12.05.2016
  COMML.JDP/ 711 Prescribing norms for electrification of Private industrial area being developed by private investors. 12.05.2016
  COMML.JDP/ 710 Recognition of "Bhamashah Card" as a valid document prrof for identity and address proof. 12.05.2016
  COMML.JDP/ 709 Releasing connection to inhabitants residing in Kacchi Basties/tents/temporary structures 11.05.2016
  COMML.JDP/ 708 Regarding self-certification of installation    11.05.2016
  COMML.JDP/ 707 Regarding self-certification of installation of generating units 11.05.2016
  COMML.JDP/ 706 Fuel Surcharge amount for all quarters of FY 2015-16. 28.04.2016
  COMML.JDP/ 705 Guideline for Erection of GBM/RTT/RTP & putting up of Cell of Wheels (COW) & Micro cells on Govt./PSU/ULB/Autonomous Bodies/Co-operative Institutions/Panchayati Raj Institutions land & Buildings. 22.03.2016
  COMML.JDP/ 704 Regarding recovery of Security from Agriculture Consumers 17.03.2016
  COMML.JDP/ 703  कृषि कनेक्शन के अनधिकृत बढे हुए भार की "स्वेच्छिक भार वृद्धि घोषणा योजना " लागू करने के सम्बन्ध मे
31/12/2015
  COMML.JDP/ 702 Release of power connections to new industries without consent to establish(CTE) from RSPCB 15/12/2015
  COMML.JDP/ 701 Prescribing norms for electrification of colonies/housing schemes developed by private builders/Developers/Housing Societies and releasing permanent connection therin. 27/11/2015
  COMML.JDP/ 700 Ratification of order No. comml.jdp/696 dated 05.10.15 issued by Commercial wing. 26/11/2015
  COMML.JDP/ 699 Tariff payable to the Grid Connected Rooftop & Small Solar Photovoltaic systems under Net Metering Regulation,2015. 6/11/2015
  COMML.JDP/ 698 Recovery of compounding charges in case of Theft of Electicity. 6/11/2015
  COMML.JDP/ 697 विषयः- कृषि कनेक्षन के अनाािकृत बे हुए भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना’’ लागू करने के संबंद्य में। 12/10/2015
  COMML.JDP/ 696 Recovery of fuel Surcharge amount for fourth quater of financial year 2014-2015. 5/10/2015
  COMML.JDP/ 695 Laying of Optical Fibre based Telecom Network Cables on existing electric poles of Discoms (33 KV/11 KV/LT) for 4G communication, fixing of rental charges & interest free security amount. 18/09/2015
  COMML.JDP/ 694 Implementation of provisions of Connectivity and Net Metering for Rooftop and Small Solar Grid Interactive System under Net Metering Regulation-2015. 28/08/2015
  COMML.JDP/ 693 Clarification regarding provisions of Net Metering and grid connectivity of Grid Rooftop and small Photovoltaic Systems . 28/07/2015
  COMML.JDP/ 692 नगरीय क्षेत्रों में नये निर्मित भवनों में स्थायी विद्युत कनेक्षन जारी करने के संबंध में। 1/7/2015
  COMML.JDP/ 691 Regarding Relaxation in applicability of Supply Voltage . 29/06/2015
  COMML.JDP/ 690 Laying of optical fibre based telecom network cable on existing electric poles(33 KV/11 KV/LT) of Discoms for 4G communication fixing of existing rental charged & interest free security amount. 24/06/2015
  COMML.JDP/ 689 Rates for compounding an offence of Theft of electricity . 12/6/2015
  COMML.JDP/ 688 Procedure for Depositing defective meters in store . 8/6/2015
  COMML.JDP/ 687 Providing Electric Connections to inhabitants of unapproved kacchi basties . 29/05/2015
  COMML.JDP/ 686 Recovery of fuel surcharge amount for third quarter of financial year 2014-15 . 28/05/2015
  COMML.JDP/ 685 Ratification of Order No.2507 dated 27.01.2015(comml.JDP/667),2508 dated 27.01.2015(Comml/JDP/668) and 2582 dated 23.02.2015 (Comml/JDP/670)issued by Commercial wing regarding recovery of Fuel surcharge.. 26/05/2015
  COMML.JDP/ 684 Releasing of Single Phase Connection to Domestic/Non-Domestic consumers upto 10 KW connected load. 26/05/2015
  COMML.JDP/ 683 Prescribing Norms for Electrification of Colonies/Housing Schemes developed by private builders/Developers/Housing Societies and releasing permanent connections therein . 22/04/2015
  COMML.JDP/ 682 Detailed guidelines and procedure for Net metering & grid Connectivity of Grid connected rooftop and small solar Photovoltaic systems. 17/04/2015
  COMML.JDP/ 681 Ratification of order No.Comml.JDP/672 dtd.02.03.15 issued by Commercial Wing. 15/04/2015
  COMML.JDP/ 680 Prescribing Norms for Electrification of Colonies/Housing Schemes developed by private builders/Developers/Housing Societies and releasing permanent connections therein . 15/04/2015
  COMML.JDP/ 679 Prescribing norms for electrification of Colonies/Housing Schemes developed by private builders/Developers/housing Societies and releasing permanent connections therein. 10/4/2015
  COMML.JDP/ 678 Testing of the ABT meters of the consumers availing Open Access from Energy exchange/bilateral mode 7/4/2015
  COMML.JDP/ 677 Levy of Electricity duty on consumption of Self Generated Energy for any purpose in respect of energy generated by captive power generating plants other than D.G.Sets . 6/4/2015
  COMML.JDP/ 676 Testing of ABT meters of the consumers availing Open Access from Energy Exchange /bilateral mode. 6/4/2015
  COMML.JDP/ 675 ओलावृष्टि से प्रभावित कृषकों के लिए 4 माह के बिजली के बिलों के भुगतान की राषि माफ करने बाबत्। 6/4/2015
  COMML.JDP/ 674 Regarding refund of Excess cost of Meter. 13/03/2015
  COMML.JDP/ 673 Regarding applicability of tariff on Hostels. 11/3/2015
  COMML.JDP/ 672 Reconstitution of Corporate level Grievance Redressal cum settlement forum Committee of Jodhpur Discom. 2/3/2015
  COMML.JDP/ 671 Tariff for Supply of Electricity- 2015. 2/3/2015
  COMML.JDP/ 670 Recovery of fuel surcharge amount for second quater of financial year 2014-15. 23/02/2015
  COMML.JDP/- 669 कृषि कनेक्षन के अनाधिकृत बढे हुए भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना’’ के संबंध में। 2/2/2015
  COMML.JDP/ 668 Recovery of fuel surcharge amount. 27/01/2015
  COMML.JDP/ 667 Recovery of fuel surcharge amount. 27/01/2015
  COMML.JDP/ 666 Release of single phase connection in Rural Area to Domestic/Non-Domestic consumers upto 10KW connected load by installing meter along with AMT arrangements. 9/1/2015
  COMML.JDP/ 665 Recovery of Fuel Surcharge Amount 30/12/2014
  COMML.JDP/ 664 Rajasthan State Regulatory Commission (Standard of Performance of Distribution Licensee)  Regulation -2014. 16/12/2014
  COMML.JDP/ 663 Directive regarding following the provisions mentioned at clause-2 "Categary of consumer and character of service" of TCOS-2004 2/9/2014
  COMML.JDP/ 662 Compliance of directions issued by "Rajasthan State Pollution Control Board to disconnect the electric supply of consumer (s) for non compliance of directions issued under Section 31(A) of the "Air (Prevention & Control of Pollution) Act-1981 and Section-33 of the Water (Prevention & Control of Pollution) Act-1974 27/07/2014
  COMML.JDP/ 661 Electrification of private Industrial Area (s) to be developed by the Builder/Developers 27/07/2014
  COMML.JDP/ 660 Regarding to provide additional metering equipment at the premises of HT supply Consumers for power factor purpose 27/07/2014
  COMML.JDP/ 659 procedure for releasing connections on 33KV supply voltage 18/07/2014
  COMML.JDP/ 658 Release of Industrial and Non-Domestic Category Connection in case of Voltage Regulation of 11 KV Feeder is more than 8% and the system improvement scheme has been sanctioned/approved 18/07/2014
  COMML.JDP/ 657 खराब मीटरों को बदलने बाबत्। 7/7/2014
  COMML.JDP/ 656 Analyzing the output data's provided by meter reading agencies by M&P wing. 7/7/2014
  COMML.JDP/ 655 Instructions regarding timely submission of reply/comment/factual report before Electricity Ombudsman,rajsathan. 27/06/2014
  COMML.JDP/ 654 Installation of Auto Meter Reading (AMR) system on Mobile Tower Connections 6/6/2014
  COMML.JDP/ 653 Releasing of single phase electric connection to domestic/Non Domestic Consumer up to 10 KW connected load 6/6/2014
  COMML.JDP/ 652 Release of Industrial Connections 6/6/2014
  COMML.JDP/ 651 Recovery of Fuel Surcharge amount 6/6/2014
  COMML.JDP/ 650 Transfer of electric connections of M/s Wireless TT Info Services Limited and M/s QUIPPO Telecom Infrastructure Limited in the name of VIOM Networks Limited 6/6/2014
  COMML.JDP/ 649 Regarding Defective ABT meters of Open Access Consumers 6/6/2014
  COMML.JDP/ 648 Procedure for allotment of 33 & 11 KV CTPT set to field Officers for release of connections 5/5/2014
  COMML.JDP/ 647 Constitution of Applellate Authority 9/4/2014
  COMML.JDP/ 646 ओलावृष्टि से प्रभावित कृषकों के लिए 4 माह के बिजली के बिलों के भुगतान की राषि माफ करने बाबत्। 3/4/2014
  COMML.JDP/ 645 Amendment in detailed procedure for availing Open Access by consumers . 21/03/2014
  COMML.JDP/ 644 Release of large number of connections under NDS category to various mobile tower companies/commercial entities . 4/3/2014
  COMML.JDP/ 643     राजस्थान आवासन मण्डल की विभिन्न आवासीय योजनाओं में बाह्य विद्युतीकरण योजना की तकनीकी स्वीकृति के क्रम में। 13/02/2014
  COMML.JDP/ 642 Testing of meters of consumers availing Open access from Energy exchange/bilateral mode . 13/02/2014
  COMML.JDP/ 641 Regarding Issue to Demand Notice in case of electrification of Affordable Housing Schemes under Affordable housing Policy-2009. 13/02/2014
  COMML.JDP/ 640 Amendment in the procedure for allotment of 33 & 11 KV CTPT Set to field officers for release of connections . 24/01/2014
  COMML.JDP/ 639 Procedure of Site Testing of Industrial/Non-Domestic Category Consumers. 15/01/2014
  COMML.JDP/ 638 Instructions Regarding disposing cases timely by Settlement Forum and recovery of the amount in dispute. 21/11/2013
  COMML.JDP/ 637 Amendment in detailed procedure for Availing Open Access by consumers. 31/10/2013
  COMML.JDP/ 636 Transfer of Electric connections of M/s Bharti Infratel Ventures Ltd., M/s Idea Cellular Towers Infrastructure ltd. and M/s Vodafone Infrastructure Ltd. in the name of M/s Indus Towers Ltd. 21/10/2013
  COMML.JDP/ 635 Procedure for allotment of 33 & 11 KV CTPT set to field officers for release of connections. 4/10/2013
  COMML.JDP/ 634 Detailed Procedure for Availing Open Access by consumers. 26/09/2013
  COMML.JDP/ 633 Regarding levy of Electricity Duty,Water ConservationCess,etc. on the quantum of assessment for Civil Liability. 26/09/2013
  COMML.JDP/ 632 Amendments in "Terms & Conditions for Supply ofElectricity-2004" 6/9/2013
  COMML.JDP/ 631 Recovery of Fuel Surcharge amount. 13/08/2013
  COMML.JDP/ 630 Charging unauthorized Street Light Points from Municipalities/Local Bodies. 2/8/2013
  COMML.JDP/ 629 Tariff For Supply Of Electrical-2013 29/07/2013
  COMML.JDP/ 628 Guideline Regarding Testing of Meter at Site. 19/07/2013
  COMML.JDP/ 627 100 से कम आबादी वाली ढ़ाणियों में मुख्य मंत्री सबके लिए विद्युत योजना के अन्तर्गत घरेलू विद्युत कनेक्षन देने के क्रम में। 24/06/2013
  COMML.JDP/ 626 Regarding release of Large,Medium & Small industrial connections in Industrial Areas. 20/05/2013
  COMML.JDP/ 625 Dealing with the cases of Energy Meters found slow/incorrect recording of consumption during checking/testing at site. 20/05/2013
  COMML.JDP/ 624 Maintaining of  Bill Correction Register. 3/5/2013
  COMML.JDP/ 623 फार्म हाउस श्रेणी के कनेक्षनों को घरेलू सेवा से कृषि सेवा में परिवर्तन किये जाने के संबंध में। 3/5/2013
  COMML.JDP/ 622 यूजर चार्जेज/सफाई शुल्क (User Charges)अधिरोपित/ उद्ग्रहित करने के क्रम में। 15/04/2013
  COMML.JDP/ 621 Regarding meter reading of Mobile tower connections and Wedding house connections. 15/04/13
  COMML.JDP/620 Adequate publicity of scheduled outage period. 14/03/2013
  COMML.JDP/ 619 ओलावृष्टि से प्रभावित कृषकों के लिए 4 माह के बिजली के बिलों के भुगतान की राषि माफ करने बाबत्। 11/3/2013
  COMML.JDP/ 618 Regarding annual review of security amount for open access consumer. 11/3/2013
  COMML.JDP/ 617 विद्युत अधिनियम-2003 में निहित प्रावधानानुसार प्रषमन राषि (Compounding Charges) एवं वैधानिक दायित्व (Civil Liability) के लिए ली जाने वाली राषि की गणना कर नोटिस जारी करने का प्रपत्र = (Format) A 6/3/2013
  COMML.JDP/ 616 Extension of Time Period of "Amnesty Scheme" Introduced vide order No.Comml.JDP/604 dated 08.01.2013. 27/02/13
  COMML.JDP/ 615 Sharing the cost of shifting of lines(HT/LT-O/H Lines). 14/02/2013
  COMML.JDP/ 614 Recovery of Civil Liability amount as well as compunding charges in case of first offence of theft of Electricity under section-135 of the Electricity Act-2003 12/2/2013
  COMML.JDP/ 613 कृषि कनेक्षनो में अनाधिकृत बढ़े हुए भार की ’’स्वैच्छिक भार वृद्धि घोषणा योजना‘‘ 6/2/2013
  COMML.JDP/ 612 Regarding release of Industrial Connections. 5/2/2013
  COMML.JDP/ 611 Clarification on Comml.JDP/581 regarding the fixed charges fo rAgriculture consumers. 21/01/2013
  COMML.JDP/ 610 Permitting the applicant to provide their own meter/metering equipment. 21/01/2013
  COMML.JDP/ 609 Regarding reliable Power supply to Railway.s 21/01/2013
  COMML.JDP/ 608 Procedure for installation of main meter,check meter and stand by meter in respect of open access consumers. 21/01/2013
  COMML.JDP/ 607 Procedure for billing of Renewable Energy generator 14/01/2013
  COMML.JDP/ 606 आबादी क्षेत्र में कनेक्षन देने बाबत् (कृषि कनेक्षन के अलावा) 14/01/2013
  COMML.JDP/ 605 Recovery of Fuel Surcharge Amount. 10/1/2013
  COMML.JDP/ 604 Extension of Time Period of "Amnesty Scheme". 8/1/2013
  COMML.JDP/ 603 Non Abadi areas/agriculture land in Rural Areas. 8/1/2013
  COMML.JDP/ 602 मीटर के मूवमेंट के अभिलेख ;त्मबवतकद्ध को बनाने के संबंध में। 21/21/2012
  COMML.JDP/ 601 Treatment to be given to the compounding charges recovered against theft of energy. 14/12/2012