Commercial Circulars

Order Reference

Download 
Link

Order regarding disposal of pending VCR's

 

JPR5-856 dt 01.05.2017
Regarding release of new industrial/ non domestic connection and extension/ reduction in connected load/ contract demand

 

JPR5-855 dt 28.04.2017
Regarding fees for domestic connection in rural areas

 

JPR5-854 dt 28.04.2017
Utilization of HT & MIP Boxes in the field

 

JPR5-853 dt 18.04.2017
Regarding releasing the domestic connection in rural areas.

 

JPR5-852 dt 03.04.2017
Extension of "Amnesty scheme" for regular/ disconnected domestic and agriculture category Connections upto 30.04.2017.

 

JPR5-851 dt 31.03.2017
Regarding withdrawing rate hike in agriculture category tariff

 

JPR5-850 dt 31.03.2017
Regarding charges of Domestic Connection in rural areas

 

JPR5-849 dt 31.03.2017
Order Regarding amount taken in the name change of electric connection

 

JPR5-848 dt 28.03.2017

Amendment regarding checking the load of agriculture consumers of Meter & Flat rate category Dt. 28.03.17

JPR5-847 dt 28.03.2017

Exemption of Electricity Duty from wind power for captive use as per notification dated 1.10.2015

JPR5-846 dt 28.03.2017

Recovery of audit charges in electricity bills

JPR5-845 dt 10.03.2017

Regarding withdrawl of rate hike in agriculture

JPR5-844 dt 2.03.2017

Amnesty Scheme for Government connections for realisation of outstanding dues

JPR5-843 dt 1.03.2017

Energy Audit at 33 KV Voltage Level

JPR5-842 dt 23.02.2017

Clarification on JPR5-496 regarding shifting of electric lines

JPR5-841 dt 21.02.2017

Regarding withdrawing rate hike in Agriculture category

JPR5-840 dt 20.02.2017

Organisation of camps for redressal of consumer grievances

JPR5-839 dt 20.02.2017

Load checking of metered Agriculture connections

JPR5-838 dt 20.02.2017

Regrading releasing the domestic connection in Rural Area

JPR5-837 dt 02.02.2017

Regrading Business Registration Number

JPR5-836 dt 02.02.2017

Amnesty Scheme shall also be for domestic and agriculture category consumers upto 31.03.2017

JPR5-835 dt 31.01.2017

Voluntary Load Declaration Scheme: Date extended upto 31.03.2017

JPR5-834 dt 31.01.2017

Clarification regarding Mukhya Mantri Gramin Gharelu Connection Yojna

JPR5-833 dt 31.01.2017

Regarding Consitution of working committee

JPR5-832 dt 25.01.2017

Regarding tariff payable to temporary connection released for lighting on festiv of Diwali-2016

JPR5-831 dt 04.01.2017

Regarding tariff payable to the consumers for excess energy supplied to Discom under Net Metering Regulation 2015

JPR5-830 dt 04.01.2017

Requirment of Registration Certificates/ Entrepreneur Memorandum / Udhyog Adhar Memorandum abolished prior to estblishment of Industry for Electricity Connection

JPR5-829 dt 03.01.2017

"Amnesty Scheme" : Date extended for disconnected consumers of all category upto 31st March 2017

JPR5-828 dt 30.12.2016

"Voluntary load declaration scheme" : Date extended upto 31st Jan 2017

JPR5-827 dt 30.12.2016

"Mukhya Mantri Gramin Gharelu Connection Yojna": Date extended upto 31st Jan 2017

JPR5-826 dt 30.12.2016

Clarification about applicability of tariff on Hostels

Link

Last Date Extension of "Amnesty Scheme" for realization of outstanding dues

JPR5-825 dt 16.12.2016

"Mukhaya Mantri Gramin Gharelu Connection Yojna": Date Extended upto 31st Dec 2016

JPR5-824 dt 29.11.2016

"Amnesty Scheme" for Regular/disconnected consumers for realization of outstanding dues

JPR5-823 dt 29.11.2016

Constitution of working committee

JPR5-822 dt 28.11.2016

"Voluntary load declaration scheme" : Date extended upto 31st Dec 2016

JPR5-821 dt 25.11.2016

Procedure for installation/replacement of meters

JPR5-820 dt 11.11.2016

Recovery of fule surcharge amount for 1st Qtr. of FY 2016-17

JPR5-819 dt 8.11.2016
FSA Calculation

Corrigendum in JPR5-815

JPR5-818 dt 8.11.2016

Mukhaya Mantri Gramin Gharelu Connection Yojna

JPR5-817 dt28.10.2016

Simplification of procedure for change in the name of connection

JPR5-816 dt26.10.2016

Billing of consumers having Net Metering and Grid Connectivity of Grid connected rooftop & Small Solar Photovoltaic Systems(SSPVS)

JPR5-815 dt26.10.2016

Intensive checking campaign of Agricultural connections.

JPR5-814 dt25.10.2016

Replacement of Defective Meters.

JPR5-813 dt19.10.2016

Directions for regularizing of unauthorized connections under drinking water schemes in rural areas.

JPR5-812 dt07.10.2016

"Amnesty Scheme" for disconnected consumers of all categories(disconnected upto or prior to 31.03.2015) for reliazation of outstanding dues.

JPR5-811 dt30.09.2016

TARIFF FOR SUPPLY OF ELECTRICITY-2016.

JPR5-810 dt29.09.2016

Procedure for replacement of burnt/failed distribution tranformers in rural areas.

JPR5-809 dt19.09.2016

Chief Minister's rural domestic connection Scheme.

JPR5-808 dt16.09.2016

"Voluntary increased Load scheme" For the present unauthorized increased load in agriculture connection.

JPR5-807 dt07.09.2016

Directions in respect of existing provisions of clause 51(5)(6) of 'TCOS-2004' (amended upto Dec'2012)-Redressal of Consumer's Grievances

JPR5-806 dt31.08.2016

Intensive recovery Programme

JPR5-805 dt17.08.2016

Considering the request of consumers for allowing extension of 24 Hrs. supply feeder beyond the prescribed limit of 1 KM in rural areas.

JPR5-804 dt09.08.2016

Clarification on JPR5-791 regarding shifting of electric lines (HT/LT overhead) and other structures which are hazardous to human life & property during the campaign of "Surakshit Bijli Abhiyaan"

JPR5-803 dt03.08.2016

Ratification of order No. 638 date 28.06.2016 (JPR5-799) issued by commercial wing regarding 'Amnesty Sceheme'

JPR5-802 dt22.07.2016

Detailed Guidelines & Procedure for Net Metering and Grid Connectivity of Grid Connected Rooftop & Small Solar Photovoltaic Systems

JPR5-801 dt21.07.2016

Reocnstitution of Appellate Authority

JPR5-800 dt06.07.2016

"Amnesty Scheme" for disconnected consumers of all categories (disconnected upto or prior to 31.03.2015) for relization of outstanding dues

JPR5-799 dt28.06.2016

Guidelines for erection of GBM/RTT/RTP & putting up of cell of wheel (COW) & Micro-cells on Govt./PSU/ULB/Autonomous Bodies/Co-op Institutions/ Panchayati Raj Institutions Land & Buildings

JPR5-798 dt16.06.2016

Simplification of procedure for obtaining new electricity connection in view of 'Ease of Doing Business'

JPR5-797 dt13.06.2016

Expenses for obtaining of New Industrial Electricity Connection under" Ease of Doing Business"

JPR5-796 dt08.06.2016

Detailed Guidelines & Procedure for grant of availing Open Access

JPR5-795 dt01.06.2016

Detailed Guidelines & Procedure for Net Metering and Grid Connectivity of Grid Connected Rooftop & Small Solar Photovoltic Systems

JPR5-794 dt30.05.2016

The Rajasthan Sick Micro & Small Enetrprises(Revival & Rehabilitation) scheme,2015

JPR5-793 dt30.05.2016

Simplification of procedure for obtaining new electricity connection in view of 'Ease of Doing Business'

JPR5-792 dt27.05.2016

Shifting of electric lines (HT/ LT Overhead) and other Structures which are hazardous to human life & property using the campagin of "Surakshit Bijli Abhiyaan"

JPR5-791 dt12.05.2016

Recognition for "Bhamashah Card" as a valid document for proof of Identity and proof of address

JPR5-790 dt11.05.2016

Provisions of single point Electric Supply for Residential purposes

JPR5-789 dt11.05.2016

Prescribing norms for electrification of Private Industrial area being developed by private developers

JPR5-788 dt11.05.2016

Releasing connection to inhabitants residing in Kachchi Basties/tents/temporary structures

JPR5-787 dt09.05.2016

Regarding self-certification of installation

JPR5-786 dt09.05.2016

Regarding self-certification of installation of generating units

JPR5-785 dt09.05.2016

Constitution of Appellate Authority

JPR5-784 dt06.05.2016

Fuel Surcharge amount for all four quarters of financial year 2015-16

JPR5-783 dt28.04.2016

Extension of Contract Demand of existing industrial / NDS Consumers

JPR5-782 dt28.03.2016

Order regarding Security Amount for agricultural consumers.

JPR5-781 dt16.03.2016

Guidelines for erection of GBM/RTT/RTP & putting up of Cell of Wheels(CoW) & Micro-cells on Govt./PSU/ULB/Autonomous Bodies/Co-op institutions/Panchayatiraj Institutions Land & Buildings.

JPR5-780 dt14.03.2016

"Voluntary increased Load scheme" For the present unauthorized increased load in agriculture connection.

JPR5-779 dt31.12.2015

Release of Power Connections to new Industries without consent to estabilish (CTE) from RSPCB

JPR5-778 dt15.12.2015

Prescribing norms for electrification of colonies / Housing Schemes developed by private builders / Developers / Housing Societies and releasing permanent connections therein

JPR5-777 dt24.11.2015

Ratification of order no.1378 dated 01.10.2015(JPR5-772) issued by Commercial Wing regarding recovery of Fuel Surcharge

JPR5-776 dt05.11.2015

Recovery of compounding charges in case of theft of electricity

JPR5-775 dt03.11.2015

Tariff payable to the Grid connected Rooftop & Small Solar Photovoltaic Systems under Net Metering Regulation, 2015

JPR5-774 dt28.10.2015

"Announcement of increase of Voluntarily Load Scheme" in connection of increase of unauthorized electricity load in agriculture connection

JPR5-773 dt08.10.2015

Recovery of Fuel Surcharge amount for fourth quarter of FY 2014-15

JPR5-772 dt01.10.2015

Constitution of Appellate Authority.

JPR5-771 dt22.09.2015

Laying of Optical Fibre based telecom network cables on existing electric poles of Discom(33KV/11KV/LT) of Discom for 4G communication, fixing of rental charges and interest free security amount.

JPR5-770 dt04.09.2015

Implementation of Provisions of Connectivity and Net Metering for Rooftop and Small Solar Grid Ineractive System under Net Metering Regulation-2015

JPR5-769 dt24.08.2015

Clarification regarding Provisions of Net Metering and Grid connectivity of Grid Connected RoofTop and small Solar Photovoltaic Systems

JPR5-768 dt20.07.2015

Regarding releasing of permanent electricity connection to the consumers for newly constructed/in construction buildings in urbun areas

JPR5-767 dt25.06.2015

Regarding relaxation in applicability of supply voltage

JPR5-766 dt23.06.2015

Laying of Optical Fibre based telecom network cables on existing electric poles of Discoms(33KV/11KV/LT) of Discom for 4G Communication, fixing of rental charges and interest free security amount

JPR5-765 dt17.06.2015

Revised Compounding Charges in case of Agriculture Service

JPR5-764 dt08.06.2015

Depositing of defective energy meters in Stores

JPR5-763 dt04.06.2015

Recovery of Fuel Surcharge amount for Third Quarter of FY 2014-15

JPR5-762 dt22.05.2015

Ratification of order no. 1846 dated 20.01.2015(JPR5-743), 1847 dated 20.01.2015 (JPR5-744) and 1966 dated 16.02.2015 (JPR5-746) issued by Commercial Wing regarding recovery of Fuel surcharge.

JPR5-761 dt22.05.2015

Releasing of Single phase connection to Domestic/Non Domestic consumers upto 10 KW connected load

JPR5-760 dt22.05.2015

Regarding electric connection to inhabitants of unapproved Kachi Basties

JPR5-759 dt19.05.2015

Depositing of defective energy meters in store

JPR5-758 dt05.05.2015

Prescribing norms for electrification of colonies / Housing Schemes developed by private builders / Developers / Housing Societies and releasing permanent connections therein

JPR5-757 dt21.04.2015

Detailed guidelines & Procedure for Net Metering and Grid Connectivity of Grid Connected Rooftop & Small SolarPhotovoltaic Systems.

JPR5-756 dt13.04.2015

Prescribing norms for electrification of colonies / Housing Schemes developed by private builders / Developers / Housing Societies and releasing permanent connections therein(Ref:JPR5-754)

JPR5-755 dt13.04.2015

Prescribing norms for electrification of colonies / Housing Schemes developed by private builders / Developers / Housing Societies and releasing permanent connections therein

JPR5-754 dt08.04.2015

Regarding Remit of four month electricity bills for the farmers affected from hail storm.

JPR5-753 dt30.03.2015

Levy of Electricity Duty on consumption of Self Generated Energy for any purpose in respect of energy generated by captive power generating plants other than the D.G. sets

JPR5-752 dt27.03.2015

Regarding pardon of the electricity bills of four months for the farmers affected from hailstorm of the Alwar and Baran .

JPR5-751 dt26.03.2015

Testing of the ABT Meters of the consumers availing Open Access from Energy exchange/bilateral mode

JPR5-750 dt23.03.2015

Regarding refund of excess cost of meter

JPR5-749 dt10.03.2015

Regarding applicability of Tariff on Hostels

JPR5-748 dt09.03.2015

Tariff For Supply Of Electricity-2015

JPR5-747 dt27.02.2015

Recovery of Fuel Surcharge amount for 2nd quarter of financial year 2014-15

JPR5-746 dt16.02.2015

"Voluntary increased Load scheme" For the present unauthorized increased load in agriculture connection

JPR5-745 dt30.01.2015

Recovery of Fuel Surcharge Amount

JPR5-744 dt20.01.2015

Recovery of Fuel Surcharge Amount

JPR5-743 dt20.01.2015

Release of Single Phase connection in Rural Area to Domestic/ Non Domestic consumers upto 10 KW connected load by installing meter along with AMR arrangements.

JPR5-742 dt30.12.2014

Regarding release of connections in the Prthivi Raj Nagar Scheme area.

JPR5-741 dt24.12.2014

Recovery of Fuel Surcharge Amount

JPR5-740 dt18.12.2014

Rajasthan State Regulatory Commission (Standard of Performance of Distribution Licensee) Regulation-2014

JPR5-739 dt27.11.2014

As per provision of clause -"Category of Consumer and Character of Service", of TCOS-2004 the character of service is defined . The order is regarding to follow the provision strictly.

JPR5-738 dt23.07.2014

Compliance of directions issued by "Rajasthan State Pollution Control Board " to disconnect the electric supply of consumer(s ) for non compliance of directions issued under Section31 (A) of the "Air (prevention & Control of Pollution) Act-1981 and Section-33(A ) of the" water (prevention & control of Pollution ) Act-1974.

JPR5-737 dt21.07.2014

Electrification of private Industrial Area(s) to be developed by the Builders/Developers

JPR5-736 dt21.07.2014

Regarding to provide additional metering equipment at the premises of HT supply Consumers for power factor purpose.

JPR5-735 dt21.07.2014

Procedure for releasing connections of 33 KV supply voltage.

JPR5-734 dt15.07.2014

Release of industrial and Non domestic category connection in case of voltage regulation of 11 KV feeder is more than 8% and the system improvement scheme has been sanctioned/approved

JPR5-733 dt15.07.2014

Procedure for depositing Defective Meters in stores

JPR5-732 dt15.07.2014

Replacement of Defective Meters

JPR5-731 dt18.06.2014

Installation of Auo meter reading (AMR) on mobile tower connections

JPR5-730 dt29.05.2014

Releasing of Single phase electric connection to Domestic/Non-Domestic upto 10KW connected load

JPR5-729 dt29.05.2014

Release of Industrial Connections

JPR5-728 dt29.05.2014

Recovery of Fuel Surcharge Amount

JPR5-727 dt26.05.2014

Transfer of electric connections of M/s Wireless TT info Services Ltd. and M/s Quippo Telecom Infrastructure Ltd. in the name of M/s VIOM Networks Ltd .

JPR5-726 dt19.05.2014

Regarding Defective ABT meters of Open Access Consumers .

JPR5-725 dt16.05.2014

Analysing the putput datas provided by the meter reading agencies by M&P Wing .

JPR5-724 dt16.04.2014

Regarding Remit of four month electricity bills for the farmers affected by hail storm.

JPR5-723 dt03.04.2014

Constitution of Appellate Authority. JPR5-722 dt25.03.2014

Assessment to be made in case of Burnt/Stopped/Stolen & defective meters under domestic category of rural areas

JPR5-721 dt18.03.2014

Directions for procedures prescribed in JPR5-139 & JPR5-189 to curtail delay in releasing new industrial connections/load extension

JPR5-720 dt13.03.2014

Applicability of correct tariff on the connection of Govt. school/hospitals

JPR5-719 dt06.03.2014

Charging 15% supervision charges from UIT, Kota against electrification of schemes developed by them

JPR5-718 dt25.02.2014

Release of large number of connections under NDS category to various mobile tower companies/ commercial entities

JPR5-717 dt25.02.2014

Regarding technical acceptance of electrification scheme in various residential schemes of Rajasthan Housing Board

JPR5-716 dt21.01.2014

Testing of the meters of the consumers availing Open Access from Energy exchange / bilateral mode

JPR5-715 dt16.01.2014

Regarding to issue Demand Notice in case of electrification of Affordable Housing Schemes under Affordable Housing Policy-2009

JPR5-714 dt30.12.2013

Procedure of Site Testing of Industrial/Non-Domestic Category Consumers

JPR5-713 dt17.12.2013

Permitting the applicant to provide their own meter/ metering equipment

JPR5-712 dt14.11.2013

Transfer of electric connections of M/s Bharti Infratel Ventures Ltd, M/s Idea Cellular Towers Infrastructure Ltd. and M/s Vodafone Infrastructure Ltd. in the name of M/s Indus Towers Ltd

JPR5-711 dt10.10.2013

Regarding levy of Electricity Duty, Water Conservation Cess etc. on the quantum of assessment for Civil Liability

JPR5-710 dt08.10.2013

Amendments in "Terms & Conditions for Supply of Electricity -2004"

JPR5-709 dt09.09.2013

Detailed Procedure for Availing Open Access by consumers

JPR5-708 dt21.08.2013

Recovery of fuel Surcharge amount

JPR5-707 dt12.08.2013

Regarding release of domestic connections under Chief Minister's Power Plan for everyone in Dhani having population less than 100

JPR5-706 dt12.07.2013

Tariff for supply of electricity-2013

JPR5-705 dt09.07.2013

Regarding release of domestic connections under Chief Minister's Power Plan for everyone in Dhani having population less than 100

JPR5-704 dt05.06.2013

Regarding not to give the new connections in the filling areas of the amani shah nala.

JPR5-703 dt16.05.2013

Regarding release of Large, Medium & Small industrial connections in Industrial Area

JPR5-702 dt16.05.2013

Dealing with cases of Energy Meters found slow/incorrect recording of consumption during checking/testing at the site.

JPR5-701 dt16.05.2013

Regarding to convert connections of farm house series from Domestic service to agriculture service

JPR5-700 dt03.05.2013

Order for imposing User Charges

JPR5-699 dt15.04.2013

Regarding Annual review of Security amount for Open Access consumers

JPR5-698

Regarding Right to Hearing Act-2012

JPR5-697

Office order regarding meter reading of Mobile Tower connections and Wedding House connections

JPR5-696

release of connection in population area

JPR5-695

Notice Format for calculated amount taken for compounding charges and civil liability under electricity act-2003

JPR5-694

Concession in electricity bills of four months for the farmers affected from hailstorm.

JPR5-693

Extension of time period of "Amnesty Scheme" introduced vide order no. JPR5-682 dated 8/1/2013

JPR5-692

Recovery of civil liability amount as well as compunding charges in case of first offence of theft of electricity under section-135 of the Electricity Act-2003

JPR5-691

Sharing the cost of shifting of lines(HT/LT- O/H Lines)

JPR5-690

Procedure for billing of Renewable Energy Generator

JPR5-689

Plan for Voluntary load increment

JPR5-688

Regarding release of Industrial Connections

JPR5-687

Recovery of Fuel Surcharge Amount

JPR5-686

Corrigendum in Tariff order as per JPR5-657

JPR5-685

Permitting the applicant to provide their own meter/metering equipment

JPR5-684

Regarding Relaible Power Supply to Railways

JPR5-683

Extension of time period of "Amnesty Scheme" introduced vide order no.JPR5-671 dated 8.11.2012

JPR5-682

Regarding release of industrial and non-domestic connections in Non-abadi areas / agriculture land in Rural Area

JPR5-681

Approval to authorise Director(Power Trading) to execute various Power Purchase Agreements with Power Generators

JPR5-680

Procedure for installation of main meter, check meter and stand-by meter in respect of Open Access Consumers

JPR5-679

Constitution of Appellate Authority

JPR5-678

Installation of Solar Water Heating Systems

JPR5-677

Treatment to be given to the compounding charges, recovered against theft of energy

JPR5-676

Release permanent electricity connection at newly constructed/ underconstruction buildings in urban areas

JPR5-675

Amnesty Scheme for Central Government, State Government Department and their undertakings

JPR5-674

Permitting the applicant to provide their own CT PT set if the set is not available with nigam store and recovery of rental charges from such customers

JPR5-673

Tariff for temprory connection for decoration on dewali

JPR5-672

"Amnesty Scheme" for permanently disconnected consumersof all categories(disconnected perior to 31.03.2012)for realization of outstanding dues

JPR5-671
Clarification for JPR 5- 564 regarding procedure for adjustment of energy sold by various CPPs to Rajasthan Discoms JPR5-670

Procedure for adjustment of energy sold by various CPPs to Rajasthan Discoms

JPR5-669

Procedure for adjustment of energy sold by various CPPs to Rajasthan Discoms

JPR5-668

Terms and Connections issued to deal with Open Access Consumers having demand above 1MW vide JPR5-639 dated 13.01.12

JPR5-667

Regarding certificate for the purpose of Ag. Connection

JPR5-666

Regarding the zero consumption output and necessary directions to the employees, Junior Engineer, ARO, Ledger Keeper etc.

JPR5-665

Regarding release of NDS connection in permanent wedding house

JPR5-664

Regarding to charge the cost of meter in terms of Clause 30(1) of TCOS-2004

JPR5-663

Permitting the applicant to provide their own CTPT set, if the same is not available with Nigam Stores

JPR5-662

Directions to maintain electricity supply and early resolution of the complaints

JPR5-661

Corrigendum

JPR5-660

Regarding implementation of "Rajasthan Right to Hearing Act -2012"

JPR5-659
Regarding inclusion of user charges on elecricity bill wih regard to the state government order JPR5-658

Tariff for Supply of Electricity-2012

JPR5-657

Deposition of Registration fee for Grievance Redressal cum Settlement Forum.

JPR5-656

Regarding release of Industrial connections

JPR5-655

Regarding the estimate of energy consumption for the period of stopped/faulty meters of the agriculture meter

JPR5-654

"Voluntary increased Load scheme" For the present unauthorized increased load in agriculture connection.

JPR5-653

Installation of star rating transformers in Residential/Commercial Buildings and its testing at Nigam's Central Testing Laboratory prior to installation

JPR5-652

Regarding household power connections for the dhani's having population less than 100 under "Chiefminister's electricity for all" scheme.

JPR5-651

Regarding Counterchecking of Meter reading.

JPR5-650

Permitting the applicant to provide their own CT-PT set if the same are not available with Nigam Stores.

JPR5-649

Regarding releasing of new power connections in Prithiviraj Nagar

JPR5-648

Permitting the applicant to provide their own CTPT set if the same are not available with Nigam Stores and recvery of rental charges from such consumers.

JPR5-647

Ratification of the Order No. 594 dated 16.4.12 (JPR5-645)

JPR5-646

Regarding release of HT-LIP connection(s) for an Induction Furnace/Arc Furnace Units.

JPR5-645

Extension of time period of "Amnesty Scheme" introduced vide Order No. JPR5-641 & JPR5-642

JPR5-644

Regarding exemption of payments for 4 months of electricity Bills for the farmers affected by coldwave and frost.

JPR5-643

"Amnesty Scheme" for permanently disconnected consumers of all categories (disconnected prior to 31.03.2011) for realization of outstanding dues.

JPR5-642

"Amnesty Scheme" for permanently disconnected consumers of all categories (disconnected prior to 31.03.2011) for realization of outstanding dues.

JPR5-641

Regarding installation of minimum three star rating pumpsets (certified BEE) by the consumers and their test/verification.

JPR5-640

Terms and conditions issued to deal with the Open Access consumers having Demand above 1 MW

JPR5-639
Release of 3Ph SIP, PHED ,NDS & Road Light Connections JPR5-638
Regarding levy of overhead charges in preparing estimates for MPs/MLAs/BADPs aided developement works. JPR5-637

Regarding voltage rebate in tariff for the connections released on 33KV supply instead of 11KV for which the consumer is entitled to be supplied power.

JPR5-636

Regarding electrification of Rural Industrial Area, developed by private Builder / Developer and releasing permanent connections therein

JPR5-635

Regarding clearanceof DPS/LPS amount against Government Departments / Undertakings

JPR5-634

Regarding release of agriculture connections with outright priority to the applicants who provide land free of cost for construction of 33/11 KV Sub station.

JPR5-633

Regarding release of three phase domestic / non domestic connections in rural areas under "Self Financing Scheme"

JPR5-632

Regarding tariff rate for the temporary power connections for collective decoration for dipawali 2011

JPR5-631

Regarding discount in elecricity bill for the installation of solar water heating system

JPR5-630

Tariff for supply of electricity–2011

JPR5-629

Permitting the applicant for industrial connection to provide their own CT-PT Set, if the Same are not available in the Nigam Stores

JPR5-628

Release of Domestic connections in a group in Non Abadi area.

JPR5-627

Charging the cost of 33KV or 11KV Bay emanating from 220KV/132 KV Sub Station or 33/11 KV Sub station for giving supply to a consumer through dedicated feeder

JPR5-626

Release of Single Point HT connection in Building Complexes and application of Tariff

JPR5-625

Regarding sanction of 33/11 KV Inter-connection lines) from sanctioned created 132 KV GSS.

JPR5-624

Regarding creation of 33/11 KV Sub-station in Urban areas and RIICO Industrial areas

JPR5-623

Prescribing norms for electrification of Colonies Housing Schemes developed by private builders / Developers / Housing Societies and releasing permanent connections therein. 

JPR5-622

Ratification of Order No. 525 dt 12.05.2011 (JPR5-620) issued by Commercial Wing

JPR5-621

To exempt the payment of bills for the month dec- 2010 , Jan-2011, Feb-2011 ,Mar-2011 of the small and medium farmers affected by hail storms.

JPR5-620

Dealing with the cases of energy meters found Tampered during checking/testing at site

JPR5-619
Drawl of Power during power cut hours. JPR5-618

New rates to be charged from consumers towards the cost of meter,if it is burnt or damaged due to tempering or damages in any way including excess load

JPR5-617

Announcement of increase of "Urban Cess" in the budget of Rajasthan Govt.

JPR5-616

Prescribing norms for electrification of Colonies Housin Schemes developed by private builders / Developers and releasing connections therein

JPR5-615

Charging Security Deposit towards the Cost of meters from Agriculture Consumer (General and Special Category)

JPR5-614

Amendment in the department notification No. F.4 (1)FD/Tax-Div/200-21 dated 28.6.2004 from the billing month of January 2011.

JPR5-613

Regarding tariff rate for the temporary power connections for collective decoration for dipawali 2010

JPR5-612

Regarding shifting /removal of overhead lines

JPR5-611

Change of category from SIP to MIP in eventualities when the maximum demand exceeds 18.65 KW for more than two times in a financial year.

JPR5-610

Constitution of a Committee to examine the issues related to shifting/removal of overhead lines.

JPR5-609
Corrigendum in the order no. JPD/CE(C-I)/F4(407)/D.1423 dt. 22.07.10(JPR-607). JPR5-608
Amendments in "Terms & Conditions for Supply of Electricity -2004". JPR5-607

Amendments in "Terms & Conditions for Supply of Electricity -2004".

JPR5-606

Clarification regarding release to Petrol Pumps in Rural areas as circulated vide order no. JPR5-522

JPR5-605

Conversion of overhead lines into under ground cable in consumer's premises

JPR5-604
Rajasthan Finance Bill-2010 (Act No. 03 of 2010) thereby introducing "Urban Class".(Corrigendum) JPR5-603

Exemption from power cut /restrictions scheduled for the period 19 hrs. to 23 hrs. to large continuous process industrial consumers.

JPR5-602

Rajasthan Finance Bill-2010(Act No. 03 of 2010) thereby introducing "Urban Class".

JPR5-601