Circular description/Subject |
Date |
Link for Document |
Size of Document |
Language of Document |
Constitution of Appellate Authority Committees. |
05/12/2012 |
COMML.JDP/- 600 |
769 KB |
English |
Permitting the applicant to provide their own CT PT set if the set is not available with Nigam Store and recovery of rental charges from such consumers. |
05/12/2012 |
COMML.JDP/- 599 |
217.1 KB |
English |
Clarification on Comml.JDP/506 regarding procedure for adjustment of energy sold by various CPPs to Rajasthan Discoms. |
30/11/2012 |
COMML.JDP/- 598 |
909.7 KB |
English |
Procedure for adjustment of energy sold by various CPPs to Rajasthan Discoms. |
30/11/2012 |
COMML.JDP/- 597 |
591.4 KB |
English |
Monitoring of failure of transformer and replacement thereon(in agriculture category). |
26/11/2012 |
COMML.JDP/- 596 |
866.5 KB |
English |
Amnesty Scheme for Central Government, State Government Department and their undertakings. |
23/11/2012 |
COMML.JDP/- 595 |
77.1 KB |
English |
“Amnesty Scheme” for permanently disconnected consumers of all categories (disconnected prior to 31-03-2012) for realization of outstanding dues. |
12//11/2012 |
COMML.JDP/- 594 |
277 KB |
English |
विद्युत व्यवस्था कोसुचारू रखने एवं षिकायतों के शीघ्र निस्तारण के क्रम में। |
17/10/2012 |
COMML.JDP/- 593 |
134.7 KB |
Hindi |
Regarding creation of 33/11KV Sub-station in Urban areas and RIICO Industrial areas. |
17/10/2012 |
COMML.JDP/- 592 |
148.6 KB |
English |
Procedure for adjustment of energy sold by various CPPs to Rajasthan Discoms. |
17/10/2012 |
COMML.JDP/- 591 |
220.8 KB |
English |
Terms and Conditions issued to deal with Open Access Consumers having demand above 1MW vide CommlJDP/560 dtd 13.01.12. |
05/10/2012 |
COMML.JDP/- 590 |
58.2 KB |
English |
Regarding release of NDS connection in permanent Wedding Houses. |
01/10/2012 |
COMML.JDP/- 589 |
386.4 KB |
English |
कृषि कनेक्षन हेतु प्रमाण-पत्र के संदर्भ में।कृषि कनेक्षन हेतु प्रमाण-पत्र के संदर्भ में। |
21/09/2012 |
COMML.JDP/- 588 |
693.3 KB |
Hindi |
राजस्थान सुनवाई का अधिकार अधिनियम-2012 के क्रियान्वयन के संबंध में। |
20/09/2012 |
COMML.JDP/- 587 |
453.3 KB |
Hindi |
Permitting the applicant to provide their own CTPT set, if the same is not available with Nigam Stores. |
19/09/2012 |
COMML.JDP/- 586 |
352.8 KB |
English |
Regarding charging the cost of meter in terms of Clause 30(1) of TCOS-2004. |
13/09/2012 |
COMML.JDP/- 585 |
95.5 KB |
English |
यूजर चार्जेज/सफाई शुल्क (User Charges)बाबत्। |
13/09/2012 |
COMML.JDP/- 584 |
158.7 KB |
Hindi |
Deposition of Registration fee for Grievance Redressal cum Settlement Forum. |
05/09/2012 |
COMML.JDP/- 583 |
118.3 KB |
English |
Regarding release of Industrial Connections. |
05/09/2012 |
COMML.JDP/- 582 |
97.9 KB |
English |
Tariff for Supply of Electricity-2012 |
30/08/2012 |
COMML.JDP/- 581 |
368.7 KB |
English |
कृषि मीटर्ड श्रेणी के मीटर बन्द/खराब होने की स्थिति में उस अवधि के लिये ऊर्जा खपत का आंकलन। |
07/08/2012 |
COMML.JDP/- 580 |
463.5 KB |
Hindi |
कृषि कनेक्षन के अनाधिकृत बढे हुए भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना’’। |
30/07/2012 |
COMML.JDP/- 579 |
638.3 KB |
Hindi |
Installation of Star rating transformers in Residential/ Commercial Buildings and its testing at Nigam’s Central Testing Laboratory (CTL) prior to installation. |
27/07/2012 |
COMML.JDP/- 578 |
945.7 KB |
English |
Issue of Meter Change Orders(MCO) |
20/07/2012 |
COMML.JDP/- 577 |
467.4 KB |
English |
Regarding disposal of grievance through “Grievance Redressal cum Settlement Forum”. |
06/07/2012 |
COMML.JDP/- 576 |
563.2 KB |
English |
Permitting the applicant to provide their own CT-PT Set, if the same are not available in the Nigam Stores. |
02/07/2012 |
COMML.JDP/- 575 |
394.4 KB |
English |
Regarding voltage rebate in tariff for the connections released on 33KV supply instead of 11KV for which the consumer is entitled to be supplied power. |
22/06/2012 |
COMML.JDP/- 574 |
839.1 KB |
English |
Regarding counter checking of Meter Reading. |
11/06/2012 |
COMML.JDP/- 573 |
387.3 KB |
English |
100 से कम आबादी वाली ढ़ाणियों में ‘मुख्य मंत्री सबके लिए’ विद्युत योजना के अन्तर्गत घरेलू विद्युत कनेक्षन देने के क्रम में। |
29/05/2012 |
COMML.JDP/- 572 |
133.1 KB |
Hindi |
Permitting the applicant to provide their own CTPT set if the same are not available with Nigam Stores and recovery of rental charges from such consumers. |
21/05/2012 |
COMML.JDP/- 571 |
50.2 KB |
English |
Regarding release of HT-LIP connection(s) for an Induction Furnace/Arc Furnace Units. |
11/05/2012 |
COMML.JDP/- 570 |
69.6 KB |
English |
शीतलहर एवं पाला से प्रभावित कृषकों के लिए 4 माह की बिजली के बिलों के भुगतान की राषि माफ करने बाबत्। |
10/04/2012 |
COMML.JDP/- 569 |
49.6 KB |
Hindi |
Extension of time period of “Amnesty Scheme” introduced vide order No. Comml.JDP/563 & Comml.JDP/564. |
09/04/2012 |
COMML.JDP/- 568 |
41.2 KB |
English |
Permitting the applicant to provide their own CT-PT Set, if the same are not available in the Nigam Stores. |
05/04/2012 |
COMML.JDP/- 567 |
66.7 KB |
English |
Release of Medium Industrial, Small Industrial, Non-domestic & Mixed load categories connection in Non-Abadi Areas. |
23/03/2012 |
COMML.JDP/- 566 |
56.4 KB |
English |
उपभोक्ता द्वारा ब्यूरों आॅफ एफीषियेन्सी द्वारा प्रमाणित कम से कम थ्री स्टार रेटिंग मोटर पम्पसैट को स्थापित करने एवम् उसकी जांच/सत्यापन करने बाबत। |
01/02/2012 |
COMML.JDP/- 565 |
433.3 KB |
Hindi |
“Amnesty Scheme” for permanently disconnected consumers of all categories (disconnected prior to 31.03.2011) for realization of outstanding dues. |
24/02/2012 |
COMML.JDP/- 564 |
62.2 KB |
English |
“Amnesty Scheme” for permanently disconnected consumers of all categories (disconnected prior to 31.03.2011) for realization of outstanding dues. |
22/02/2012 |
COMML.JDP/- 563 |
71.4 KB |
English |
Permitting the applicant for industrial connection to provide their own CT-PT Set, if the same are not available in the Nigam Stores. |
06/02/2012 |
COMML.JDP/- 562 |
45.6 KB |
English |
Regarding voltage rebate in tariff for the connections released on 33KV supply instead of 11KV for which the consumer is entitled to be supplied power. |
24/01/2012 |
COMML.JDP/- 561 |
48.3 KB |
English |
Option from Open Access Consumers |
13/01/2012 |
COMML.JDP/- 560 |
411.3 KB |
English |
Regarding levy of overhead charges in preparing estimates for MPs/MLAs/BADPs aided development works. |
12/01/2012 |
COMML.JDP/- 559 |
284.4 KB |
English |
Regarding clearance of DPS/LPS amount against Government Departments/Undertakings. |
11/01/2012 |
COMML.JDP/- 558 |
104 KB |
English |
Regarding electrification of Rural Industrial area, developed by private Builder/ Developer and releasing permanent connections therein. |
30/12/2011 |
COMML.JDP/- 557 |
23.5 KB |
English |
Irregularities in releasing domestic light connections. |
26/12/2011 |
COMML.JDP/- 556 |
2.3 MB |
English |
Regarding release of agriculture connections with outright priority to the applicants who provide land free of cost for construction of 33/11KV Sub station. |
26/12/2011 |
COMML.JDP/- 555 |
24.9 KB |
English |
Regarding release of three phase domestic/non domestic connections in rural areas under “Self Financing Scheme”. |
23/12/2011 |
COMML.JDP/- 554 |
25 KB |
English |
Installation of Solar Water Heating Systems. |
08/12/2011 |
COMML.JDP/- 553 |
3.5 MB |
English |
सोलर वाटर हीटिंग सिस्टम स्थापना पर विद्युत बिल में मिलने वाली छूट के बाबत्। |
25/11/2011 |
COMML.JDP/- 552 |
5 MB |
Hindi |
Charging the cost of 33KV or 11KV Bay emanating from 220KV/132KV Grid Sub Station or 33/11KV Sub Station for giving supply to a consumer through dedicated feeder. |
17/10/2011 |
COMML.JDP/- 551 |
34.7 KB |
English |
Release of Domestic & Non-domestic connections in a group in Non Abadi area. |
13/10/2011 |
COMML.JDP/- 550 |
38.7 KB |
English |
Tariff for Supply of Electricity-2011 |
07/10/2011 |
COMML.JDP/- 549 |
279.3 KB |
English |
Release of Single Point HT connection in Building Complexes and application of Tariff. |
07/10/2011 |
COMML.JDP/- 548 |
48.6 KB |
English |
Prescribing norms for electrification of Colonies Housing Schemes developed by private builders/ Developers / Housing Societies and releasing permanent connections therein. |
05/07/2011 |
COMML.JDP/- 547 |
344.7 KB |
English |
Action against a person for unauthorized use of Electricity and other offences under Section 126, 127, 135 to 151 and compounding of offence under Section 152 of the Electricity Act-2003 & Electricity (Amendment) Act, 2007. |
15/06/2011 |
COMML.JDP/- 546 |
33.4 KB |
English |
ओला वृष्टि से प्रभावित गांवों के लघु एवं सीमान्त काष्तकारों के बिलिंग माह दिसम्बर-2010, जनवरी-2011, फरवरी-2011 एवं मार्च-2011 के बिजली के बिलों के भुगतान की राषि माफ करने बाबत्। |
31/05/2011 |
COMML.JDP/- 545 |
36.5 KB |
Hindi |
Dealing with the cases of Energy Meters found Tampered during checking/testing at site. |
13/05/2011 |
COMML.JDP/- 544 |
83.7 KB |
English |
Drawl of power during power cut hours. |
02/05/2011 |
COMML.JDP/- 543 |
45.2 KB |
English |
Direction regarding recovery of cost of Meter. |
02/05/2011 |
COMML.JDP/- 542 |
37.2 KB |
English |
Prescribing norms for electrification of Colonies, Housing Schemes developed by private builders/ developers and releasing connections therein. |
19/04/2011 |
COMML.JDP/- 541 |
161.4 KB |
English |
Increase of “Urban Cess” in compliance of Rajasthan Finance Bill, 2011. |
31/03/2011 |
COMML.JDP/- 540 |
49.2 KB |
English |
Charging Security Deposit towards the cost of meters from Agriculture Consumer (General and Special category). |
22/03/2011 |
COMML.JDP/- 539 |
31.5 KB |
English |
Amendment in Rajasthan Electricity (Duty) Act,1962. |
06/01/2011 |
COMML.JDP/- 538 |
1.4 MB |
English |
Directions regarding effective control of (T&D) losses. |
|
COMML.JDP/- 537 |
N/A |
English |
Change of category from SIP to MIP in eventualities when the maximum demand exceeds 18.65KW for more than two times in a financial year. |
22/10/2010 |
COMML.JDP/- 536 |
77.8 KB |
English |
Constitution of a committee to examine the issues related to shifting/removal of overhead lines. |
21/10/2010 |
COMML.JDP/- 535 |
40 KB |
English |
Constitution of a committee to examine the issues related to shifting/removal of overhead lines. |
21/10/2010 |
COMML.JDP/- 534 |
40.1 KB |
English |
Amendments in “Terms & Conditions for Supply of Electricity – 2004”. |
02/08/2010 |
COMML.JDP/- 533 |
390.4 KB |
English |
Amendment in “Terms & Conditions for Supply of Electricity-2004”. |
17/06/2010 |
COMML.JDP/- 532 |
31.7 KB |
English |
Clarification regarding release of connections to Petrol Pumps in rural areas as circulated vide order No. Comml.JDP/470. |
11/06/2010 |
COMML.JDP/- 531 |
30.9 KB |
English |
Rajasthan Finance Act-2010 (Act No. 03 of 2010) thereby introducing “Urban Cess”. |
29/04/2010 |
COMML.JDP/- 530 |
79.4 KB |
English |
“Amnesty Scheme” for all categories of consumers- realization of outstanding dues thereof. |
22/04/2010 |
COMML.JDP/- 529 |
66.7 KB |
English |
Withdrawal of scheme for levy of extra charges @2%(Two percent) throughout the year in lieu of supply of power without any power cut. |
31/03/2010 |
COMML.JDP/- 528 |
1.1 MB |
English |
Further widening the scope of Order No.Comml.JDP/454 dtd.03-10-2008 regarding charging the amount from inhabitant whose colonies have been developed by Colonizers/Developers/ Societies in the vicinity of Urban areas (City/town). |
31/03/2010 |
COMML.JDP/- 527 |
1.2 MB |
English |
Extension of time period of the Incentive Scheme for recovery of dues from various categories of PDC consumers (permanently disconnected consumers) whose connections were disconnected prior to March, 06. |
25/03/2010 |
COMML.JDP/- 526 |
27.5 KB |
English |
Procedure for replacement of burnt/defective distribution transformer (in agriculture category) in the field for ensuring replacement of burnt transformer within 72 hours (all three Discoms). |
15/03/2010 |
COMML.JDP/- 525 |
372.9 KB |
English |
‘‘मुख्यमंत्री स्वावलम्बन योजना’’ के अन्तर्गत स्थापित होने वाली औद्योगिक/सेवा ईकाईयों को प्राथमिकता के साथ विद्युत उपलब्ध करवाने के सम्बन्ध में। |
03/03/2010 |
COMML.JDP/- 524 |
1.1 MB |
Hindi |
Release of domestic connections for scattered house holds near the fields. |
18/01/2010 |
COMML.JDP/- 523 |
82.5 KB |
English |
कृषि कनेक्षन के अनाधिकृत बढे हुए भार की ’’स्वैच्छिक भार वृद्धि घोषणा योजना‘‘। |
16/12/2009 |
COMML.JDP/- 522 |
952.7 KB |
Hindi |
Voluntary advance deposition scheme for availing relief in the DPS to be levied and saving disconnection. |
04/12/2009 |
COMML.JDP/- 521 |
84.4 KB |
English |
कृषि उपभोक्ताओ के बिलों के निस्तारण हेतु ’’कृषक राहत एवं भुगतान सहायता योजना (2009-10) (Amnesty – Scheme 2009 -10) |
16/11/2009 |
COMML.JDP/- 520 |
24.4 KB |
Hindi |
कृषि कनेक्षन के अनाधिकृत बढे हुए भार की ’’स्वैच्छिक भार वृद्धि घोषणा योजना‘‘। |
04/11/2009 |
COMML.JDP/- 519 |
32.8 KB |
Hindi |
Conversion of overhead lines into under-ground cable in consumer’s premises. |
26/10/2009 |
COMML.JDP/- 518 |
34.2 KB |
English |
Irregularities in releasing domestic light connections. |
26/10/2009 |
COMML.JDP/- 517 |
80.4 KB |
English |
कृषि कनेक्षन के अनाधिकृत बढे हुए भार की ’’स्वैच्छिक भार वृद्धि घोषणा योजना‘‘ में पूर्व प्रसारित आदेष क्रमांक वाणिज्य-जोधपुर डिस्काॅम/499 दिनांक 09.06.09, क्रमांक वाणिज्य-जोधपुर डिस्काॅम/505 दिनांक 01.09.09 एवं क्रमांक वाणिज्य-जोधपुर डिस्काॅम/507 दिनांक 18.09.09 में आंषिक संषोधन। |
20/10/2009 |
COMML.JDP/- 516 |
44.1 KB |
Hindi |
ग्रामीण क्षेत्रों में घरेलु श्रेणी के अन्तर्गत ‘‘मुख्यमंत्री सब के लिये विद्युत योजना’’ की क्रियान्विति के सम्बन्ध में। |
14/10/2009 |
COMML.JDP/- 515 |
83.3 KB |
Hindi |
Committee for witnessing for commissioning of Wind Power Projects. |
14/10/2009 |
COMML.JDP/- 514 |
36.1 KB |
English |
Procedure for adjustment of energy sold by CPP to Rajasthan Discoms. |
14/10/2009 |
COMML.JDP/- 513 |
29.9 KB |
English |
Norms for checking of MCOs issued and already changed meters. |
06/10/2009 |
COMML.JDP/- 512 |
32.5 KB |
English |
Reviewing the norms for allowing maximum numbers of connections from single phase transformers of capacity 5/10/16/25 KVA. |
06/10/2009 |
COMML.JDP/- 511 |
68.7 KB |
English |
कृषि उपभोक्ताओं के बकाया बिलों के निस्तारण हेतु “कृषक राहत एवं भुगतान सहायता योजना” (Amnesty Scheme – 2009-2010)A |
01/10/2009 |
COMML.JDP/- 510 |
59.5 KB |
Hindi |
Guidelines in the matter of preparation of estimates on tentative cost basis & preparing the final account after completion of work. |
30/09/2009 |
COMML.JDP/- 509 |
83.1 KB |
English |
Information regarding T&D losses of Disrict Head Quarters and Municipal Towns |
18/09/2009 |
COMML.JDP/- 508 |
31.4 KB |
English |
कृषि कनेक्षन के अनाधिकृत बढ़े हुए भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा’’। |
18/09/2009 |
COMML.JDP/- 507 |
26.1 KB |
Hindi |
Procedure for adjustment of energy sold by CPP to Rajasthan Discoms. |
16/09/2009 |
COMML.JDP/- 506 |
303.7 KB |
English |
कृषि कनेक्षन के अनाधिकृत बढे हुए भार की ‘‘स्वैच्छिक भार वृद्धि घोषणा योजना’’ में पूर्व प्रसारित आदेष वाणिज्य-जोधपुर डिस्काॅम/499 दिनांक 09.06.09 में आंषिक संषोधन |
01/09/2009 |
COMML.JDP/- 505 |
32.3 KB |
Hindi |
Exemption in payment of interest charges for Large Industrial Consumers having outstanding dues of more than Rs.10 lacs (Rupees Ten Lacs only) provided the consumer pays the total outstanding dues in one stroke. |
01/09/2009 |
COMML.JDP/- 504 |
39.1 KB |
English |
Tariff applicability for chambers of advocates situated in the Court premises. |
25/08/2009 |
COMML.JDP/- 503 |
38.8 KB |
English |
Rajasthan Finance Bill-2009 (Bill No.14 of 2009) thereby introducing “Water Conservation Cess”. |
25/08/2009 |
COMML.JDP/- 502 |
77.9 KB |
English |
Incentive Scheme for recovery of dues from various categories of PDC consumers (permanently disconnected consumers) whose connections were disconnected prior to March,06. |
10/08/2009 |
COMML.JDP/- 501 |
86.6 KB |
English |
Application of Tariff for BTS Towers for various Mobile/Telephone Companies. |
10/08/2009 |
COMML.JDP/ 500 |
64.3 KB |
English |
कृषि कनेक्षन के अनाधिकृत बढे हुए भार की “स्वैच्छिक भार वृद्धि घोषणा योजना”। |
09/06/2009 |
COMML.JDP/ 499 |
31.9 KB |
Hindi |
“मुख्यमंत्री सब के लिये विद्युत योजनान्तर्गत” ग्रामीण क्षेत्रों में घरेलू कनेक्षनों के बारे में। |
05/06/2009 |
COMML.JDP/ 498 |
37 KB |
Hindi |
Testing of existing metering equipments of the Wind Power Generators in the Rajasthan State. |
05/06/2009 |
COMML.JDP/ 497 |
37.3 KB |
English |
Release of Single Point-HT Connection for existing building complexes. |
05/06/2009 |
COMML.JDP/ 496 |
68 KB |
English |
Scheme for levy of extra charges @ 2% (Two Percent) throughout the year of tariff for granting facility of uninterrupted power supply without any power cut. |
28/05/5009 |
COMML.JDP/ 495 |
176.5 KB |
English |
“Self Financing Scheme” for release of domestic/non-domestic connections in rural areas. |
28/05/2009 |
COMML.JDP/ 494 |
67.2 KB |
English |
Concessional package to be allowed for revival and sick industries. |
21/05/2009 |
COMML.JDP/ 493 |
72.2 KB |
English |
Installation of Dry/Oil Type Transformers in Residential/Commercial buildings and their testing in Nigam’s Central Testing Laboratory (CTL) prior to installation. |
23/04/2009 |
COMML.JDP/ 492 |
34.2 KB |
English |
Clarification regarding Order Comml.JDP/488. Installation of Dry/Oil type transformer in residential/commercial buildings and their testing in Nigam’s Central Testing Laboratory. |
17/04/2009 |
COMML.JDP/ 491 |
35.1 KB |
English |
Tariff applicability for exclusive chamber of advocate and that of at his residence. |
01/04/2009 |
COMML.JDP/ 490 |
94.7 KB |
English |
Installation of 11KV “Ring Main Unit” (RMU)/11KV “Ring Main Switch Fuse Unit” for termination of 11 KV underground service line. |
01/04/2009 |
COMML.JDP/ 489 |
37.8 KB |
English |
Installation of Dry/Oil Type Transformers in Residential/Commercial buildings and their testing in Nigam’s Central Testing Laboratory (CTL) prior to installation |
20/03/2009 |
COMML.JDP/ 488 |
213.6 KB |
English |
अनुसूचित जाति एवं अनुसूचित जन जाति के मोहल्लों में प्राथमिकता से बिजली पंहुचाना। |
20/03/2009 |
COMML.JDP/ 487 |
26.5 KB |
Hindi |
Application of tariff for building complexes. |
20/03/2009 |
COMML.JDP/ 486 |
319 KB |
English |
Release of Industrial Connections in case of Voltage Regulation (VR) is more than 8% & the system Augmentation scheme has been approved. |
20/03/2009 |
COMML.JDP/ 485 |
30.9 KB |
English |
Material vigilance of O&M sub-divisions. |
17/03/2009 |
COMML.JDP/ 484 |
39.1 KB |
English |
कृषि कनेक्शन के अनाधिकृत बढ़े हुए भार की “स्वैच्छित भार वृद्धि घोषणा योजना“। |
02/03/2009 |
COMML.JDP/ 483 |
44.2 KB |
Hindi |
Amendment in Clause-51 of TCOS-04 denoting “Grievance Redressal Cum Settlement Forum”. |
24/02/2009 |
COMML.JDP/ 482 |
82 KB |
English |
शहरी क्षैत्र में गरीबी “गरीबी रेखा के नीचे जीवन यापन करने वाले परिवारों“ (ठच्स्) को रियायती दरों पर घरेलू सेवा के कनेक्शन जारी करने के क्रम में। |
24/02/2009 |
COMML.JDP/ 481 |
39.9 KB |
Hindi |
कृषि मीटर्ड श्रेणी के मीटर बन्द/खराब होने की स्थिति में उस अवधि के लिये ऊर्जा खपत का आंकलन। |
19/02/2009 |
COMML.JDP/ 480 |
22 KB |
Hindi |
Guidelines for dealing/treating the cases in which the LT Supply consumers exceed their contract demand above 50 KVA for more than twice in a financial year. |
02/02/2009 |
COMML.JDP/ 479 |
149.2 KB |
English |
Advance testing of metering equipments to be installed to Wind Power developer(s) /generator(s) in the Rajasthan State. |
02/02/2009 |
COMML.JDP/ 478 |
31.2 KB |
English |
Testing of existing metering equipments of the wind power generators in the Rajasthan State. |
02/02/2009 |
COMML.JDP/ 477 |
28.2 KB |
English |
Reconstitution of Corporate Level Grievance Cum Settlement Forum Committee of Jodhpur Discom. |
02/02/2009 |
COMML.JDP/ 476 |
854.2 KB |
English |
ग्रामीण क्षेत्रों में घरेलू श्रेणी के अन्तर्गत “मुख्यमंत्री सब के लिये विद्युत योजना” की क्रियान्विति के सम्बंध मे पूर्व में जारी आदेषों में आषिक संषोधन हेतु। |
02/02/2009 |
COMML.JDP/ 475 |
50 KB |
Hindi |
Dealing with the cases of Energy Meter(s) found Slow/incorrect recording of consumption during Checking/testing at site. |
29/01/2009 |
COMML.JDP/ 474 |
291.7 KB |
English |
Installation of 11 KV Ring Main Unit (RMU)/Ring Main Switch Fuse Unit for termination of 11KV underground service lines in the premises of prospective HT consumers under all categories in Jodhpur City. |
28/01/2009 |
COMML.JDP/ 473 |
115.6 KB |
English |
ग्रामीण क्षेत्रों में घरेलू श्रेणी के अन्तर्गत “मुख्यमंत्री सब के लिये विद्युत योजना” की क्रियान्विति के सम्बंध मे पूर्व में जारी आदेषों में आषिक संषोधन हेतु। |
06/01/2009 |
COMML.JDP/ 472 |
24.3 KB |
Hindi |
Release of connections for drinking water supply in Abadi area & Non-abadi areas of the Village. |
06/01/2009 |
COMML.JDP/ 471 |
219.4 KB |
English |
Regarding release of connections for “Petrol Pumps in rural areas” (both Abadi & Non-abadi areas) under Non-domestic (NDS) category. |
06/01/2009 |
COMML.JDP/ 470 |
93.2 KB |
English |
Pilferage of oil & accessories of 33 KV/11KV Power Transformers-Preventive measures regarding. |
06/01/2009 |
COMML.JDP/ 469 |
227.1 KB |
English |
Replacement of road light bare conductor in Municipal Towns by single phase AB cable to prevent theft of electricity by miscreants by hooking the bare conductor. |
30/12/2008 |
COMML.JDP/ 468 |
34.3 KB |
English |
Payments of energy bills at Circle/ Head Quarters by Large Industrial consumers. |
30/12/2008 |
COMML.JDP/ 467 |
34.2 KB |
English |
Issue of Meter Change Orders (MCO). |
16/12/2008 |
COMML.JDP/ 466 |
347.5 KB |
English |
Release of single phase connection under NDS category in rural areas where three phase connection already exists. |
16/12/2008 |
COMML.JDP/ 465 |
31.4 KB |
English |
Incentive Scheme for 2008-09 for O&M staff on recovery of old arrears from PDC consumer under EUDR Act and Land Revenue Act. |
16/12/2008 |
COMML.JDP/ 464 |
34.5 KB |
English |
Reconnection of disconnected domestic consumers in rural area as well as in Kachchi Basties of urban areas. |
12/12/2008 |
COMML.JDP/ 463 |
28.7 KB |
English |
Exemption from payment of security deposit towards electric connections taken for offices/sub-station etc. of all the three Distribution Companies(DISCOMs). |
11/12/2008 |
COMML.JDP/ 462 |
27.3 KB |
English |
Release of NDS Category connections to various Organizations/ Commercial Entities requiring Bulk connections at various Locations in the area of Jodhpur Discom. |
21/11/2008 |
COMML.JDP/ 461 |
30.1 KB |
English |
Clarification regarding execution of agreement with Large Industrial consumers when they apply for increase or decrease in the contract demand. |
20/11/2008 |
COMML.JDP/ 460 |
32.5 KB |
English |
Reconstitution of Corporate Level Grievance Cum Settlement Forum Committee of Jodhpur Discom. |
20/11/2008 |
COMML.JDP/ 459 |
28.9 KB |
English |
Registration of complaints/grievances with “Grievances Redressal Cum Settlement Forum” within 90 days.. |
14/11/2008 |
COMML.JDP/ 458 |
76.8 KB |
English |
Procedure for commissioning of new wind power/Biomass/Solar generating plants and routine testing/checking of meters installed at generating stations, receiving stations and pooling stations. |
06/10/2008 |
COMML.JDP/ 457 |
100 KB |
English |
Installation of Dry Type Transformers in Cinema Halls and Multi-storied building and to get these transformers tested in Nigam’s Central Testing Labs (CTL). |
08/10/2008 |
COMML.JDP/ 456 |
82.3 KB |
English |
कृषि उपभोक्ताओं के बकाया बिलों के निस्तारण हेतु “कृषक राहत एवं भुगतान सहायता योजना” (Amnesty Schme – 2008-2009) |
08/10/2008 |
COMML.JDP/ 455 |
58.8 KB |
Hindi |
Regarding charging the amount from inhabitants whose colonies have been developed by colonizers/ developers/Cooperative Societies in the vicinity of urban area (city/town). |
03/10/2008 |
COMML.JDP/ 454 |
77.1 KB |
English |
गैर आबादी क्षेत्र में कृषि कुओं के समीप छितराये (Scattered) घरों में “घरेलू श्रेणी” के अन्तर्गत विद्युत कनेक्षन जारी करने के क्रम में। |
03/10/2008 |
COMML.JDP/ 453 |
35.4 KB |
Hindi |
Accepting the application, from the consumer for getting registered with the “Grievance Redressal Cum Settlement Forum”. |
23/09/2008 |
COMML.JDP/ 452 |
75.9 KB |
English |
Release of connections for drinking water supply in the Abadi area of the village. |
23/09/2008 |
COMML.JDP/ 451 |
70.6 KB |
English |
Instructions regarding arranging HT fuse elements in case of consumers having contract demand upto 500 KVA and Breakers for consumers having contract demand above 500 KVA |
28/08/2008 |
COMML.JDP/ 450 |
47.2 KB |
English |
ग्रामीण क्षेत्रों में घरेलू श्रेणी के अन्तर्गत “मुख्यमंत्री सब के लिये विद्युत योजना” की क्रियान्विति के सम्बंध में आवेदन स्वीकार करने की समयावधि बढाने के क्रम में। |
16/09/2008 |
COMML.JDP/ 449 |
35.1 KB |
Hindi |
Sharing the cost of shifting of existing electric lines & other structures. |
15/09/2008 |
COMML.JDP/ 448 |
30.1 KB |
English |
कृषि कनेक्षन के अनाधिकृत बढे हुए भार की “स्वैच्छिक भार वृद्धि घोषणा योजना”। |
07/08/2008 |
COMML.JDP/ 447 |
28.5 KB |
Hindi |
ग्रामीण क्षेत्रों में घरेलू श्रेणी के अन्तर्गत “मुख्यमंत्री सब के लिये विद्युत योजना” की क्रियान्विति के सम्बंध में पूर्व में जारी आदेषों में आंषिक संषोधन हेतु। |
06/08/2008 |
COMML.JDP/ 446 |
67.1 KB |
Hindi |
To stay the order No.JdVVNL/CE(CPM)/SE(Comml)/JU/2005-06 D.271 dtd.20-05-05 (Comml.JDP/273) regarding adhoc charges to be paid by the consumer to save disconnection of his connection. |
26/07/2008 |
COMML.JDP/ 445 |
30.9 KB |
English |
Conversion of Flat Rate Agriculture Consumers into metered category in case of Voluntary increase of load for one pump or second pump. |
21/07/2008 |
COMML.JDP/ 444 |
31.7 KB |
English |
ग्रामीण क्षेत्रों में घरेलू श्रेणी के अन्तर्गत “मुख्यमंत्री सब के लिये विद्युत योजना” की क्रियान्विति के सम्बंध में आवेदन स्वीकार करने की समयावधि बढाने के क्रम में। |
05/07/2008 |
COMML.JDP/ 443 |
29.3 KB |
Hindi |
उपभोक्ताओं की बिजली से सम्बन्धित सभी समस्याओं की त्वरित समाधान के लिये हर मंगलवार को “बिजली चोपाल”. |
24/06/2008 |
COMML.JDP/ 442 |
851.3 KB |
Hindi |
Notification dt.25/28-04-08 issued by the State Government in terms of Powers conferred under sub-section (2) of Section-135 of the Electricity Act-2003, Designating “Authorised Officer”. |
26/06/2008 |
COMML.JDP/ 441 |
1.6 MB |
English |
“Amnesty Scheme” for realization of outstanding dues from running Agriculture, domestic in rural areas, domestic in Kachchi Basties of Urban areas and for disconnected consumers of all categories except Industrial categories. |
03/06/2008 |
COMML.JDP/ 440 |
403.3 KB |
English |
Incentive in tariff to Large Industrial Consumers-Calculation of “Load Factor”. |
27/05/2008 |
COMML.JDP/ 439 |
379.3 KB |
English |
Modification in demand notices to promote the use of Compact Fluorescent Lamps. |
23/05/2008 |
COMML.JDP/ 438 |
394.8 KB |
English |
Restricting the use of Single Phase distribution transformer only for domestic light and fan purpose upto 0.5 KW load. |
23/05/2008 |
COMML.JDP/ 437 |
370.5 KB |
English |
Merging of clause-51 & 52 of Terms & Conditions for supply of Electricity–2004, denoting “Forum for Redressal of Grievances” and “Consumer’s Dues Settlement Committee”, respectively and replacing them under one clause by forming “Grievance Redressal cum Settlement Forum”. |
23/05/2008 |
COMML.JDP/ 436 |
3.1 MB |
English |
ग्रामीण क्षेत्रों में घरेलू श्रेणी के अन्तर्गत “मुख्यमंत्री सब के लिये विद्युत योजना” की क्रियान्विति के सम्बंध मे। |
03/05/2008 |
COMML.JDP/ 435 |
382.3 KB |
Hindi |
Applicability of tariff in respect of “Places of Public Worship” having connected load upto 5 KW, above 5 KW & upto 25 KW and more than 25 KW. |
03/05/2008 |
COMML.JDP/ 434 |
380.5 KB |
English |
Not to recover shunt capacitor surcharge from the agriculture consumers being fed through the feeders on which FRP work completed and transformer with capacitor installed. |
30/04/2008 |
COMML.JDP/ 433 |
419.7 KB |
English |
Restricting the use of Single Phase distribution Transformer only for domestic light & fan purpose upto 0.5 KW load. |
30/04/2008 |
COMML.JDP/ 432 |
918 KB |
English |
Conversion of Flat Rate Agriculture Consumers into Metered category in case unauthorized increase in Sanctioned connected load detected. Modification in the order No.2119 dtd.21-02-08 (Comml.JDP/425). |
22/04/2008 |
COMML.JDP/ 431 |
488 KB |
English |
“Amnesty Scheme” for realization of outstanding dues from running Agriculture, domestic in rural areas, domestic in Kachchi Basties of Urban areas and for disconnected consumers of all categories except Industrial categories. |
01/04/2008 |
COMML.JDP/ 430 |
416.5 KB |
English |
शीतलहर एवं पाला प्रभावित कृषि श्रेणी के कनेक्षनों के उपभोक्ताओं को राहत देने के क्रम में। |
19/03/2008 |
COMML.JDP/ 429 |
420.4 KB |
Hindi |
“Amnesty Scheme” for realization of outstanding dues from running Agriculture, domestic in rural areas, domestic in Kachchi Basties of Urban areas and for disconnected consumers of all categories except Industrial categories. |
18/03/2008 |
COMML.JDP/ 428 |
386.8 KB |
English |
शीतलहर एवं पाला से प्रभावित लघु एवं सीमान्त काश्तकारों, जिनकी फसल 50 प्रतिशत से अधिक खराब हुई है, के चार माह के बिजली के बिलों की राशि का भुगतान माफ करने बाबत्। |
21/02/2008 |
COMML.JDP/ 427 |
436.9 KB |
Hindi |
“Amnesty Scheme” for realization of outstanding dues from running Agriculture, domestic in rural areas, domestic in Kachchi Basties of Urban areas and for disconnected consumers of all categories except Industrial categories. |
21/02/2008 |
COMML.JDP/ 426 |
1.1 MB |
English |
Conversion of Flat Rate Agriculture Consumers into Metered category in case unauthorized increase in Sanctioned connected load detected. |
21/02/2008 |
COMML.JDP/ 425 |
378.7 KB |
English |
“विद्युत अधिनियम - 2003” में निहित प्रावधानानुसार प्रशमन राशि (Compounding charges) एवं सिविल लायबिलिटी (Civil liability) की गणना कर नोटिस जारी करने के प्रपत्र (Format) |
01/02/2008 |
COMML.JDP/ 424 |
717 KB |
Hindi |
Sustainability of Feeder Renovation Programme. |
22/12/2007 |
COMML.JDP/ 423 |
1.6 MB |
English |
For implementing the notifications issued by the Energy Deptt. of Rajasthan Dtd. 15.05.94, 31.12.94 & 15.07.95 regarding relaxations given by the State Government in Rule No. 45 of the then “Indian Electricity Rules – 1956” (Now I.E. Rules – 2005) for giving L-Form under Agriculture category. |
19/12/2007 |
COMML.JDP/ 422 |
2.2 MB |
English |
“विद्युत अधिनियम - 2003” में निहित प्रावधानानुसार प्रशमन राशि (Compounding charges) एवं सिविल लायबिलिटी (Civil liability) की गणना कर नोटिस जारी करने के प्रपत्र (Format) |
14/11/2007 |
COMML.JDP/ 421 |
1.1 MB |
Hindi |
Amendments in “Terms & Conditions for Supply of Electricity – 2004”. |
03/11/2007 |
COMML.JDP/ 420 |
5.8 MB |
English |
दिपावली 2007 पर सामूहिक सजावट हेतु अस्थाई विद्युत कनेक्शनों पर लगने वाली टैरिफ दर। |
31/10/2007 |
COMML.JDP/ 419 |
557.5 KB |
Hindi |
Regarding rebate in tariff @ 10% to Domestic connection in Rural areas. Guidelines for billing the Domestic consumers getting round the clock supply in rural areas. |
30/10/2007 |
COMML.JDP/ 418 |
659.3 KB |
English |
Sealing of energy meters as per CEA (Installation & Operation of meters) Regulation, 2006 and subsequent RERC (Metering) Regulation, 2007. |
27/10/2007 |
COMML.JDP/ 417 |
861.3 KB |
English |
Ratification of orders issued by Commercial Wing of the Nigam. |
22/10/2007 |
COMML.JDP/ 416 |
656.2 KB |
English |
Approval for transfer of connection from M/s Aircel Digilink India Ltd., to M/s Vodafoen Essar Digilink Ltd. |
17/10/2007 |
COMML.JDP/ 415 |
639.6 KB |
English |
Amendment in various provisions of different tariff schedule under “Tariff for Supply of Electricity – 2004 & as amended form time to time. |
08/10/2007 |
COMML.JDP/ 414 |
3.6 MB |
English |
Deposit of cash security by Large Industrial Consumers. |
05/10/2007 |
COMML.JDP/ 413 |
2.6 MB |
English |
Applicability of tariff under temporary supply for group lighting/decoration on festivals. |
03/10/2007 |
COMML.JDP/ 412 |
709.7 KB |
English |
Regarding Charging of the cost of 11 KV ay to be provided at JdVVNL’s 33 KV/ 11KV Sub-station, for giving supply through dedicated feeder. |
03/10/2007 |
COMML.JDP/ 411 |
581.5 KB |
English |
Release of connection to Petrol Pumps in Rural Areas. |
29/09/2007 |
COMML.JDP/ 410 |
443.9 KB |
English |
To expedite the release of NDS-LT connection to various organization/ commercial entities requiring large number of connections at various locations in the area of Jodhpur Discom. |
25/09/2007 |
COMML.JDP/ 409 |
646 KB |
English |
Action against a person for unauthorized use of Electricity and other offences under Sections 126, 127, 135 to 151 and compounding of offence under Section 152 of the Electricity Act 2003 & Electricity (Amendment) Act, 2007. |
17/09/2007 |
COMML.JDP/ 408 |
1.4 MB |
English |
Action against a person for unauthorized use of Electricity and other offences under Sections 126, 127, 135 to 151 and compounding of offence under Section 152 of the Electricity Act 2003 & Electricity (Amendment) Act, 2007. |
16/08/2007 |
COMML.JDP/ 407 |
4.7 MB |
English |
Release of connection to Petrol Pumps in Rural Areas. |
16/08/2007 |
COMML.JDP/ 406 |
573.2 KB |
English |
24 घण्टे विद्युत आपूर्ति वाले गावों में घरेलू एवं कृषि कनेक्शनों की विद्युत दर के सम्बंध में। |
04/08/2007 |
COMML.JDP/ 405 |
561.5 KB |
Hindi |
ग्रामीण क्षेत्रों में घरेलू कनेक्शन जारी करने के लिये “प्रार्थना पत्र” के साथ सिर्फ “प्रार्थना पत्र शुल्क” ही लेने के सम्बंध में। |
30/07/2007 |
COMML.JDP/ 404 |
650.9 KB |
Hindi |
Regarding voltage rebate in tariff for the connections released on 33 KV supply instead of 11 KV for which the consumer is entitled to be supplied power. |
30/07/2007 |
COMML.JDP/ 403 |
703.4 KB |
English |
Formulation of policy for granting relaxation in Supply voltage at the time of enhancement of Contract demand. |
30/07/2007 |
COMML.JDP/ 402 |
1.4 MB |
English |
गैर आबादी क्षेत्र में कृषि कुओं के समीप छितराये (Scattered) घरों में “घरेलू श्रेणी” के अन्तर्गत विद्युत कनेक्शन जारी करने के क्रम में। |
24/07/2007 |
COMML.JDP/ 401 |
702.9 KB |
Hindi |