Commercial Circular 201 - 400

Circular description/Subject Date Link for Document Size of Document Language of Document
Rules and regulations in exercise of powers conferred by Section 180 (1) of Sec 127 of EA 2003 18/03/2004 Circular No - 201 103.7 KB English
Change of billing of category of recognized educational Institutions from NDS to bulk supply for mixed load 31/03/2004 Circular No - 202 56.9 KB English
Information about Incharge of the Office and Controlling Officer under Raj. RTI 16/04/2004 Circular No - 203 43.4 KB English
Use of HDPE pipe in agricultural pump sets 16/04/2004 Circular No - 204 76.5 KB English
Non clearance of proceedings of Settlement committee meetings 20/04/2004 Circular No - 205 69.8 KB English
Requirement of NOC from RIICO for releasing new connections under Industrial and other categories 20/04/2004 Circular No - 206 44.8 KB English
Cost of meter and meter boxes 20/04/2004 Circular No - 207 70.5 KB English
Applicability of PF surcharge / Incentive as per Tariff provision 20/04/2004 Circular No - 208 47.5 KB English
Notice period for disconnection of defaulting consumers 20/04/2004 Circular No - 209 42.4 KB English
Recovery of additional security from the Industrial consumers desiring extension in connceted load/ contract demand 20/04/2004 Circular No - 210 37.5 KB English
Installation of GO switches and Horn Gap fuses for connections of HT consumers 20/04/2004 Circular No - 211 82.2 KB English
Recovery of line dismentalling charges from LIP consumers being permanently disconnected and recovery of cost of releasing  of Service line from consumers seeking reconnection after two months from the date of disconnection 29/04/2004 Circular No - 212 47.5 KB English
Abeyance in Comml.JDP/207 07/05/2004 Circular No - 213 52.6 KB English
Prescribing norms for electrification od colonies to be developed by private builders and other agencies 17/05/2004 Circular No - 214 79.7 KB English
Billing of Consumers if the connected load / cntract demand is revised in the middle of the month 21/05/2004 Circular No - 215 60.6 KB English
Revision in cost of meter boxes and meter security to be recovered from the consumers 21/05/2004 Circular No - 216 54.8 KB English
Recovery of difference of stamp duty in respect of agreement etc from consumers 02/06/2004 Circular No - 217 58.1 KB English
Replacement of 1-ph and 3-ph Conventional meters by Static meters 16/06/2004 Circular No - 218 47.6 KB English
Incentive scheme for maintaining "Fault Free Feeders: during a month, in Industrial area 17/06/2004 Circular No - 219 57.6 KB English
Levy of power factor surcharge and allowing incentive in light of "Power Factor Clause" of Tariff for supply of Electricity 2001 17/06/2004 Circular No - 220 57.6 KB English
Refund / adjustment of cost of energy Meter recovered in lieu of security 21/06/2004 Circular No - 221 53 KB English
Recovery of cost in case of burnt meter / reconnection etc. 09/07/2004 Circular No - 222 46.1 KB English
Levying/allowing power factor surcharge/ Incentive to sub-metered categories like Domestic, NonDomestic, Bulk Supply for Mixed Load of the main connection under Large Industrial Category. 12/07/2004 Circular No - 223 97.2 KB English
Prescribed norms for electrification of colonies developed by private builders and other agencies. 15/07/2004 Circular No - 224 54.2 KB English
Rate of Electricity Duty 20/07/2004 Circular No - 225 83.4 KB English
Formulation of policy for granting relaxation in supply Voltage at the time of enhancement of contract demand 29/07/2004 Circular No - 226 123.6 KB English
Refund of Transformer back-up charges. 29/07/2004 Circular No - 227 53.5 KB English
Commencement of single window in Jodhpur Discom for entertaining application, release of electric Connection and for billing of such connections. 03/08/2004 Circular No - 228 112.4 KB English
Rate of Electricity Duty 09/08/2004 Circular No - 229 52.7 KB English
Concession package to be allowed for revival of sick industries. 09/08/2004 Circular No - 230 69 KB English
Instructions for billing 19/08/2004 Circular No - 231 88.1 KB English
Waival of LPS/DPS against the payment of energy Bills in respect of sub-stations & offices of RRVPNL, RRVUNL & JdVVNL. 24/08/2004 Circular No - 232 56.3 KB English
Recovery of difference of Stamp Duty in respect of agreement etc. from the consumers. 24/08/2004 Circular No - 233 50.2 KB English
Applicability of tariff to M/S Kalpatru Power Transmission Limited(Non Conventional energy source) for their 07 MW Bio-Mass based Project. 31/08/2004 Circular No - 234 56.2 KB English
Delegation of Powers 17/09/2004 Circular No - 235 51.6 KB English
Levy of Electricity Duty on persons generating Electricity- Delegation of powers thereof 21/09/2004 Circular No - 236 68.2 KB English
Concession package to be allowed for revival of Sick industries. 21/09/2004 Circular No - 237 59.3 KB English
Concession in minimum billing forAG metered and special consumers 22/09/2004 Circular No - 238 61.7 KB English
Concession package to be allowed for revival of Sick Industries-clarification thereof. 05/10/2004 Circular No - 239 70.9 KB English
Waiver of connection charges of Rs.1500.0 in case of new Connection for PDC consumers of domestic category. 15/12/2004 Circular No - 240 50.8 KB English
Action against a person for unauthorised use of electricity & other offences under Sections 126, 127, 135 to 151 and Compounding of offence under Section-152 of the Electricity Act-2003 15/12/2004 Circular No - 241 290.7 KB English
Instructions for proper maintaining the printed complaint register at various levels 15/12/2004 Circular No - 242 61.3 KB English
Guidelines to be followed for redressal of consumer grievances against notification No.RERC/Sec/Reg.l5 dt. 3-11-2003 15/12/2004 Circular No - 243 58.9 KB English
Precaution to be taken while entertaining and disposing the cases by the Consumers Dues Settlement Committees under Sec.52 of “Terms and Conditions For Supply of Electricity-2004" 15/12/2004 Circular No - 244 156.5 KB English
Laying of separate feeder for Industrial and Nondomestic Connections situated in Rural Areas for connecting them from continuous supply feeder. 17/12/2004 Circular No - 245 75.3 KB English
Review of Security of Large Industrial/Medium Industries and HT Non Domestic Consumers. 07/01/2005 Circular No - 246 86.9 KB English
Clarification with regard to release of domestic Connections in Urban areas 07/01/2005 Circular No - 247 62.7 KB English
Assessment in cases of stopped/lost/stolen/burnt/ defective meter and cases where unauthorized use of electricity or theft of electricity is involved. 10/01/2005 Circular No - 248 155.1 KB English
Applicability of the provisions of Clause-47 (2) of the “Terms & Conditions for Supply of Electricity, 2004” (TCOS-2004). 15/01/2005 Circular No - 249 70.9 KB English
Concession package to be allowed for revival of sick industries. 22/01/2005 Circular No - 250 73.6 KB English
Disconnection while issuing `No dues' in favour of employee vacating Nigam's building 07/02/2005 Circular No - 251 55.5 KB English
Applicability of revised tariff on Domestic & Agriculture categories. 07/02/2005 Circular No - 252 55.2 KB English
Including the name of Debt Recovery Tribunal (DRT) under the purview of Order Comml./JDP-187 dt. 28-01-04 and Clasue 42(6) of TCOS-2004 07/02/2005 Circular No - 253 122.8 KB English
Corrigendum of Comml.JDP/241 08/02/2005 Circular No - 254 52.8 KB English
Change of category from SIP to MIP in eventualities when the maximum demand exceeds 25 KVA on three occasions in a financial year. 19/02/2005 Circular No - 255 61 KB English
Filing of Appeal under section 127 of the Electricity Act-2003, against the final assessment made under section -126 fo the Electricity Act 2003. 21/02/2005 Circular No - 256 70.6 KB English
Applicability of Tariff on BSNL Exchanges / Switches including attached offices. 03/03/2005 Circular No - 257 60.6 KB English
Disposal of burnt CT/PT Sets. 22/03/2005 Circular No - 258 59.4 KB English
Waival of balance amount of the auctioned industrial units. 22/03/2005 Circular No - 259 58.5 KB English
determination of tariff for retail supply of electricity 22/03/2005 Circular No - 260 56 KB English
determination of tariff for retail supply of electricity 22/03/2005 Circular No - 261 52.6 KB English
Security for Industrial consumers opting fortnightly billing. 30/03/2005 Circular No - 262 59.6 KB English
Conversion of Flat Rate consumers into Metered Supply consumers under agriculture category. 06/04/2005 Circular No - 263 55.3 KB English
Exemption in Electricity Duty to the units declared eligible Under Investment Promotion Scheme, 2003. 13/04/2005 Circular No - 264 64.4 KB English
Rules framed by Central Government under Electricity Act-2003 in respect of Intimation of Accidents (Form and Time of service of Notice) Rules, 2004. 23/04/2005 Circular No - 265 51.8 KB English
Procedure to be followed while entertaining and disposing the cases by consumers Dues Settlement Committee. 26/04/2005 Circular No - 266 64.2 KB English
Instructions for billing 27/04/2005 Circular No - 267 81.4 KB English
Corrigendum of Comml.JDP/264 28/04/2005 Circular No - 268 74.4 KB English
Power Rate of DL and AG connections in villages having population more than 5000 07/05/2005 Circular No - 269 74.7 KB English
Amnesty Scheme for realization of outstanding dues from Domestic, Non-Domestic, Agricultural, Industrial consumers, Govt. department and Local Bodies. 12/05/2005 Circular No - 270 77.9 KB English
Taking load data through MRI in respect of Large Industrial Consumers 13/05/2005 Circular No - 271 61.8 KB English
Action against a person for unauthorised use of electricity & other offences under Section 126, 127, 135 to 151 and compounding of offence under section-152 of the Electricity Act-2003. 20/05/2005 Circular No - 272 123.3 KB English
Recovery of Ad-hoc charges from the consumers involved in the act of “Theft of Electricity” 20/05/2005 Circular No - 273 136.6 KB English
Determination of incentive in Tariff to Large Industrial Consumers for the year 2004-2005 under previous / new incentive scheme. 04/06/2005 Circular No - 274 114.2 KB English
Modification of Comml.JDP/201 14/06/2005 Circular No - 275 118.9 KB English
Action against a person for unauthorised use of electricity and other offences under Sections 126, 127, 135 to 151 and compounding of offence under Section 152 of the Electricity Act-2003 21/06/2005 Circular No - 276 59.5 KB English
Amendment in Item(d) denoting “Payment” under Tariff (Schedule AG/FR/LT-4)” of “Tariff for Supply of Electricity-2004” 24/06/2005 Circular No - 277 57.5 KB English
Removing meter and service lines after two months from the date of disconnection-Clause 46(9) of TCOS-2004 24/06/2005 Circular No - 278 59.7 KB English
Assessment in case of stopped / stolen / lost or burnt Meter. 25/06/2005 Circular No - 279 58.9 KB English
Change of category from SIP to MIP on eventualities arisen when maximum demand exceeds 25 HP (18.65 KW) on three occasions in a financial year. 25/06/2005 Circular No - 280 56 KB English
Charges to be taken from PDC Consumers 28/06/2005 Circular No - 281 53.6 KB English
Recovery of minimum charges during unexpired period of agreement in the case of large Industrial consumers. 30/06/2005 Circular No - 282 67.8 KB English
Testing/Checking of connections under Small Industrial category having sanctioned connected load from 15 HP to 25 HP and NDS/Mixed load categories having sanctioned connected load form 18.65 KW to 25 KW. 08/07/2005 Circular No - 283 65.4 KB English
Amnesty Scheme for realization of outstanding dues from Domestic, Non-Domestic, Agricultural, Industrial consumers, Govt. department and Local Bodies. 25/07/2005 Circular No - 284 57 KB English
Accepting payment of electricity bills of AG consumers on Ad hoc basis 15/09/2005 Circular No - 285 74.7 KB English
Favvara/Boond Boond Irrigation method 20/09/2005 Circular No - 286 78.9 KB English
Insisting for production of “No Objection Certificate” 21/09/2005 Circular No - 287 54.2 KB English
Paying attention to the representations made by consumers for redressal of grievances with the Ombudsman appointed by RERC. 23/09/2005 Circular No - 288 83.2 KB English
Charging 50% of energy charges plus full fixed charges of “Domestic Service (Schedule DS/LT-1) instead of 50% of “Non Domestic Service (Schedule NDS/LT-2 or NDS/HT-2)” from GOSHALA’s connections. 23/09/2005 Circular No - 289 61.6 KB English
Amendment in sub clause 16(F) of Terms & Conditions of Supply -2004 23/09/2005 Circular No - 290 70.9 KB English
Internal Audit of decisions/settlements reached in Settlement Committee(s) 07/10/2005 Circular No - 291 66.6 KB English
Relief to domestic and agriculture consumers. 24/10/2005 Circular No - 292 89.3 KB English
Excemption in Electricity Duty 07/11/2005 Circular No - 293 62.3 KB English
Failure of power transformers-expediting failure report, enquiry report by field officers. 07/11/2005 Circular No - 294 64.4 KB English
Determination under Section 126 and Appeal under Section 127 of Electricity Act 2003 14/11/2005 Circular No - 295 153.3 KB English
Accepting payment of electricity bills of AG consumers on Ad hoc basis 14/11/2005 Circular No - 296 83.3 KB English
Capacitor installation for Ag consumers 14/11/2005 Circular No - 297 58.1 KB English
Accepting payment of electricity bills of AG consumers on Ad hoc basis 21/11/2005 Circular No - 298 85 KB English
Regarding installation of sub meters for Iron & Steel Re-Rolling Mills. 24/11/2005 Circular No - 299 58.7 KB English
Compliance of the directions of Raj. State Pollution Control Board to disconnect the electric supply for consumers for non-compliance of Section 31(A) fo Air Act-1981 & section 33(A) Water (Pre-vention & Control of Pollution) Act-1974. 24/11/2005 Circular No - 300 65 KB English
Burnt meter vigilance ofAG connections 01/12/2005 Circular No - 301 80.7 KB English
Conversion of hara chara special category, nursery category and rural category farm house Ag connections to general category 05/12/2005 Circular No - 302 83.2 KB English
installation of meters 01/12/2005 Circular No - 303 80 KB English
Modification of Comml.JDP/303 26/12/2005 Circular No - 304 72.4 KB English
Clarification regarding redressal of consumer grievancesthrough Forum or Settlement committee and permission of advocates therein. 25/01/2006 Circular No - 305 70 KB English
Redressal of grievances of consumers 16/02/2006 Circular No - 306 73.4 KB English
Organizing camp in Kachchi basties of urban areas 16/02/2006 Circular No - 307 61.5 KB English
Release of connection in Police Lines/ Colonies of Police Personnel 16/02/2006 Circular No - 308 142.7 KB English
Segregation of Industrial load from rural and other load 03/03/2006 Circular No - 309 37.7 KB English
“Amnesty Scheme” for all categories of consumers- realisation of outstanding dues thereof 09/03/2006 Circular No - 310 207.1 KB English
Authorization given to checking Officers to make a complaint in writing or lodge FIR on behalf of Jodhpur Discom 17/03/2006 Circular No - 311 45.9 KB English
Clarification regarding registering theft cases in Settlement Committee/Forum 20/03/2006 Circular No - 312 54 KB English
Clarification regarding recovery of security for CT PT Sets & its rent. 20/03/2006 Circular No - 313 30.4 KB English
Clarification in respect of recovery of various charges while accepting Application Form for NDS Connection. 29/03/2006 Circular No - 314 47.2 KB English
“Amnesty Scheme” for all categories of consumers – realization of outstanding dues thereof. 31/03/2006 Circular No - 315 46.7 KB English
excemption in Electricity Duty 31/03/2006 Circular No - 316 88.6 KB English
Adjustment of Ad hoc amount paid in advance for increase in load/ demand by the Industrial categories of consumers. 31/03/2006 Circular No - 317 49 KB English
Assessment of civil liability in case of theft of electricity detected under Section 135 of the electricity act 31/03/2006 Circular No - 318 91.3 KB English
Sharing cost of shifting of existing electric lines. 01/04/2006 Circular No - 319 41.3 KB English
Concession in billing of hail affected village consumers for Feb and March 2006 07/04/2006 Circular No - 320 50.7 KB English
Charging of overhead and supervision charges. 12/04/2006 Circular No - 321 87.3 KB English
Charges to be recovered on reconnection. 12/04/2006 Circular No - 322 114.5 KB English
Amnesty Scheme for all categories of consumers realization of outstanding dues thereof. 15/04/2006 Circular No - 323 46.7 KB English
Charging of supervision charges @ 15% from the Rajasthan Housing Board. 03/05/2006 Circular No - 324 51.1 KB English
Accepting payment of electricity bills of AG consumers on Ad hoc basis 03/05/2006 Circular No - 325 91.4 KB English
Adequate publicity of schedule outage period. 10/05/2006 Circular No - 326 44.5 KB English
Violation of provisions of Rule-87 of Indian Electricity Rules,1956 (Now Electricity Rules- 2005), thereby causing danger to human life & damages to costly apparatus installed by Department of Telecommunication. 17/05/2006 Circular No - 327 58.4 KB English
Release of domestic connections in villages. 18/05/2006 Circular No - 328 53.9 KB English
Authorization given to checking Officers to make a complaint in writing or lodge FIR on behalf of Jodhpur Discom 25/05/2006 Circular No - 329 118.6 KB English
Charging consumers in case of Magnetic Temper. 28/05/2006 Circular No - 330 52.3 KB English
Removal of connections on dedicated feeders 05/06/2006 Circular No - 331 45.3 KB English
Inordinate delay in allowing credits/relief/concessions to the consumers. 11/07/2006 Circular No - 332 79.2 KB English
Allowing grace period for payment of energy bills by the consumers. 27/07/2006 Circular No - 333 49.7 KB English
Revision in “Meter Reading Record” (Jodhpur Discom A-10) for recording readings of Maximum Demand. 04/08/2006 Circular No - 334 84.7 KB English
Rebate of 7.5% to be allowed to the consumers under Bulk Supply of Mixed Load (Schedule ML/LT-7) For supply on HT. 05/08/2006 Circular No - 335 100.7 KB English
Action against a person for unauthorized use of Electricity & other offences under Sections 126, 127, 135 to 152 and Compounding of offence under Section-152 of the Electricity Act-2003. 01/09/2006 Circular No - 336 1.4 MB English
Installation of meters for flat rate consumer. 01/09/2006 Circular No - 337 136.5 KB English
Clarification regarding applicability of tariff to be levied on electric connection taken under Community Kitchen being set up by the Govt. Mid Day Meal Programme in the State. 01/09/2006 Circular No - 338 54.6 KB English
Reconnection 01/09/2006 Circular No - 339 77 KB English
Vigilance checking of Agriculture Consumers under Flat Rate Category. 04/09/2006 Circular No - 340 45 KB English
Element of Electricity duty included in the charges prescribed for various categories under"compromising / settlement charges scheme" for theft of electricity 15/09/2006 Circular No - 341 43.2 KB English
Rates for compounding of offences under Section-152 of The Electricity Act-2003 against “Dishonest Abstraction Of Electricity” (Theft of Electricity). 15/09/2006 Circular No - 342 183.5 KB English
Release of NDS category connections to various Organizations/Commercial Entities requiring Bulk connections at various locations in the area of Jodhpur Discom. 15/09/2006 Circular No - 343 86.7 KB English
Use of 3-Phase Static Meters (10-60 Amps.) for domestic, non-domestic & Small Industrial Category connections having 7.5 KW & above sanctioned connected load. 16/09/2006 Circular No - 344 41.7 KB English
Reconnection of disconnected Agriculture Consumers in Barmer, Jalore, Pali & Jodhpur District Circle. 16/09/2006 Circular No - 345 101.4 KB English
Release of NDS connections to Commercial Entities  27/09/2006 Circular No - 346 46.8 KB English
Reconnection of disconnected Agriculture Consumers in Barmer, Jalore, Pali & Jodhpur District Circle. 07/10/2006 Circular No - 347 54.9 KB English
Regarding applicability of tariff to be levied on electric connection taken under Community Kitchens being set up by the State Government under Mid Day Meal Programme 31/10/2006 Circular No - 348 60 KB English
Modification in “Meter Reading Record” (Jodhpur Discom A-10) revised vide Order No.Comml./JDP/334. 02/11/2006 Circular No - 349 102.8 KB English
Recovery of security deposit equivalent to 30 days Consumption from industrial consumers revived under Revival Package announced by the State Government. 09/11/2006 Circular No - 350 50.1 KB English
Reconnection of disconnected AG connections 09/11/2006 Circular No - 351 38.4 KB English
Calculation of the requirement of additional security on the basis of average consumption of electricity for the preceding twelve months. 09/11/2006 Circular No - 352 56.4 KB English
Limitation prescribed by Law in raising Debits as a consequence to meter found defective on testing-Debiting the assessment within 2 years. 09/11/2006 Circular No - 353 145.7 KB English
Replacement of burnt/damaged Push Fit Energy Meters. 15/11/2006 Circular No - 354 44.4 KB English
Replacement of burnt/damaged Service Lines. 15/11/2006 Circular No - 355 38.7 KB English
Laying of separate feeder for industrial and nondomestic connections situated in rural areas for connecting them from continuous supply feeders. 15/11/2006 Circular No - 356 53.6 KB English
Reconstitutions of Corporate Level Settlement Committee of Jodhpur Discom. 28/11/2006 Circular No - 357 41.5 KB English
“Amnesty Scheme” for Agriculture category of consumers- realization of outstanding dues thereof. 02/12/2006 Circular No - 358 163.7 KB English
Unguarded electric lines passing over educational institutions. 05/12/2006 Circular No - 359 46.7 KB English
Withdrawl of orders bearing No. Comml.JDP/345 dtd. 27.09.06 & Comml.JDP/347 dtd. 07.10.06. 06/12/2006 Circular No - 360 41 KB English
Instructions to billing 14/12/2006 Circular No - 361 95.7 KB English
“Amnesty Scheme” for Agriculture Category of Consumers-realization of outstanding dues thereof. 21/12/2006 Circular No - 362 55.8 KB English
Instructions to billing 22/12/2006 Circular No - 363 46 KB English
Maintaining register of the cases received/disposed By the various settlement committee(s). 28/12/2006 Circular No - 364 50.7 KB English
Connection application, stamp and security amount for BPL consumers 30/12/2006 Circular No - 365 40 KB English
Monitoring of “Joint Inspection Report” (JIR) and early implementation of the observations made by the checking officers. 02/01/2007 Circular No - 366 43.7 KB English
Recording the readings of Check Meters alongwith other meters provided for other individual connections in “Building Complexes”. 04/01/2007 Circular No - 367 42.7 KB English
Conversion of a connection from one category to another category. 15/01/2007 Circular No - 368 100.5 KB English
Clarification in respect of Order No.1339 dtd.01-09-06 (Comml.JDP/336) in respect of Un-authorized use of electricity & other offences. 06/02/2007 Circular No - 369 49.8 KB English
Payment of interest on security during disconnected period. 06/02/2007 Circular No - 370 37 KB English
Accepting payment of electricity bills of AG consumers 06/02/2007 Circular No - 371 42.5 KB English
Removal of transformers of defaulter consumers. 17/02/2007 Circular No - 372 40.2 KB English
Clarification order “Tariff For Supply of Electricity- 2004”. 17/02/2007 Circular No - 373 208.8 KB English
Error in billing due to change of MF due to replacement of CTs/CT PT set. 19/02/2007 Circular No - 374 49.2 KB English
Regarding the reading of check meters alongwith other meters. 19/02/2007 Circular No - 375 49.7 KB English
Release of domestic connections for scattered house holds near the fields. 24/02/2007 Circular No - 376 110.7 KB English
Concession in billing of hail affected village consumers for Jan and Feb 2007 01/03/2007 Circular No - 377 52.6 KB English
“Amnesty Scheme” for all categories of consumers- realization of outstanding dues thereof. 08/03/2007 Circular No - 378 211.1 KB English
Charging of supervision charges @15% from the Urban Improvement Trust (UIT). 16/03/2007 Circular No - 379 46.7 KB English
Preparation of VCR Sheet alongwith JIR Sheet. 16/03/2007 Circular No - 380 101.6 KB English
Compliance of directions issued by “Rajasthan State Pollution Control Board” to disconnect the electric supply of consumer(s) for non compliance of directions issued under Section 31(A) of the “Air (Prevention & Control of Pollution) Act-1981” and Section-33 (A) of the “Water (Prevention & Control of Pollution) Act-1974. 16/03/2007 Circular No - 381 119.3 KB English
Incentive for each successful verification of load of PDC connections and billing. 23/03/2007 Circular No - 382 62.6 KB English
Power factor for the purpose of billing power factor incentive and/or surcharge. 29/03/2007 Circular No - 383 112.8 KB English
“Amnesty Scheme” for all categories of consumers – realization of outstanding dues thereof. 30/03/2007 Circular No - 384 52.5 KB English
Concession in billing of hail affected village consumers for Nov-06, Dec-06, Jan-07 and Feb-07 05/04/2007 Circular No - 385 43.8 KB English
Recovery of transformation losses @ 3% plus transformer rent as per TCS-04 13/04/2007 Circular No - 386 121.7 KB English
“Amnesty Scheme” for all categories of consumers – realization of outstanding dues thereof. 16/04/2007 Circular No - 387 73.5 KB English
Regarding applicability of tariff to Mercerising Process Units. 16/04/2007 Circular No - 388 77.3 KB English
Procedure for release of NDS connections in Permanent Wedding Houses. 20/04/2007 Circular No - 389 108.1 KB English
Concessional charges for releasing connection under domestic category in Rural areas. 25/04/2007 Circular No - 390 79.4 KB English
“Amnesty Scheme” for all categories of consumers- realization of outstanding dues thereof. 04/05/2007 Circular No - 391 254.4 KB English
Multiplying Factor be also mentioned in words apart from numerical number, in joint inspection Report. 14/05/2007 Circular No - 392 42.8 KB English
Adjustment of the adhoc amount @ Rs.500.00 per KW or HP or KVA paid in advance for increase In connected load/demand by Industrial Categories of consumers. 21/05/2007 Circular No - 393 49.3 KB English
Reconnection of disconnected domestic consumers in rural areas. 02/06/2007 Circular No - 394 51.1 KB English
Reconstitution of Corporate Level Settlement Committee of Jodhpur Discom. 18/06/2007 Circular No - 395 36.3 KB English
Accepting the Compounding charges. 20/06/2007 Circular No - 396 47.5 KB English
“Amnesty Scheme” for all categories of consumers – realization of outstanding dues thereof. 21/06/2007 Circular No - 397 44.1 KB English
Regarding release of industrial and non domestic Connections in Non-abadi area in rural sub division. 29/06/2007 Circular No - 398 42.8 KB English
Regarding power factor for the purpose of billing Power factor incentive and/or surcharge. 09/07/2007 Circular No - 399 115.8 KB English
Reconnection of disconnected domestic connections in Rural areas as well as in Kachchi Basties of Urban Areas. 10/07/2007 Circular No - 400 46.8 KB English
Circular description/Subject Date Link for Document Size of Document Language of Document
Reconnection of disconnected domestic connections in Rural areas as well as in Kachchi Basties of Urban Areas. 10/07/2007 Circular No - 400 46.8 KB English
Regarding power factor for the purpose of billing Power factor incentive and/or surcharge. 09/07/2007 Circular No - 399 115.8 KB English
Regarding release of industrial and non domestic Connections in Non-abadi area in rural sub division. 29/06/2007 Circular No - 398 42.8 KB English
“Amnesty Scheme” for all categories of consumers – realization of outstanding dues thereof. 21/06/2007 Circular No - 397 44.1 KB English
Accepting the Compounding charges. 20/06/2007 Circular No - 396 47.5 KB English
Reconstitution of Corporate Level Settlement Committee of Jodhpur Discom. 18/06/2007 Circular No - 395 36.3 KB English
Reconnection of disconnected domestic consumers in rural areas. 02/06/2007 Circular No - 394 51.1 KB English
Adjustment of the adhoc amount @ Rs.500.00 per KW or HP or KVA paid in advance for increase In connected load/demand by Industrial Categories of consumers. 21/05/2007 Circular No - 393 49.3 KB English
Multiplying Factor be also mentioned in words apart from numerical number, in joint inspection Report. 14/05/2007 Circular No - 392 42.8 KB English
“Amnesty Scheme” for all categories of consumers- realization of outstanding dues thereof. 04/05/2007 Circular No - 391 254.4 KB English
Concessional charges for releasing connection under domestic category in Rural areas. 25/04/2007 Circular No - 390 79.4 KB English
Procedure for release of NDS connections in Permanent Wedding Houses. 20/04/2007 Circular No - 389 108.1 KB English
Regarding applicability of tariff to Mercerising Process Units. 16/04/2007 Circular No - 388 77.3 KB English
“Amnesty Scheme” for all categories of consumers – realization of outstanding dues thereof. 16/04/2007 Circular No - 387 73.5 KB English
Recovery of transformation losses @ 3% plus transformer rent as per TCS-04 13/04/2007 Circular No - 386 121.7 KB English
Concession in billing of hail affected village consumers for Nov-06, Dec-06, Jan-07 and Feb-07 05/04/2007 Circular No - 385 43.8 KB English
“Amnesty Scheme” for all categories of consumers – realization of outstanding dues thereof. 30/03/2007 Circular No - 384 52.5 KB English
Power factor for the purpose of billing power factor incentive and/or surcharge. 29/03/2007 Circular No - 383 112.8 KB English
Incentive for each successful verification of load of PDC connections and billing. 23/03/2007 Circular No - 382 62.6 KB English
Compliance of directions issued by “Rajasthan State Pollution Control Board” to disconnect the electric supply of consumer(s) for non compliance of directions issued under Section 31(A) of the “Air (Prevention & Control of Pollution) Act-1981” and Section-33 (A) of the “Water (Prevention & Control of Pollution) Act-1974. 16/03/2007 Circular No - 381 119.3 KB English
Preparation of VCR Sheet alongwith JIR Sheet. 16/03/2007 Circular No - 380 101.6 KB English
Charging of supervision charges @15% from the Urban Improvement Trust (UIT). 16/03/2007 Circular No - 379 46.7 KB English
“Amnesty Scheme” for all categories of consumers- realization of outstanding dues thereof. 08/03/2007 Circular No - 378 211.1 KB English
Concession in billing of hail affected village consumers for Jan and Feb 2007 01/03/2007 Circular No - 377 52.6 KB English
Release of domestic connections for scattered house holds near the fields. 24/02/2007 Circular No - 376 110.7 KB English
Regarding the reading of check meters alongwith other meters. 19/02/2007 Circular No - 375 49.7 KB English
Error in billing due to change of MF due to replacement of CTs/CT PT set. 19/02/2007 Circular No - 374 49.2 KB English
Clarification order “Tariff For Supply of Electricity- 2004”. 17/02/2007 Circular No - 373 208.8 KB English
Removal of transformers of defaulter consumers. 17/02/2007 Circular No - 372 40.2 KB English
Accepting payment of electricity bills of AG consumers 06/02/2007 Circular No - 371 42.5 KB English
Payment of interest on security during disconnected period. 06/02/2007 Circular No - 370 37 KB English
Clarification in respect of Order No.1339 dtd.01-09-06 (Comml.JDP/336) in respect of Un-authorized use of electricity & other offences. 06/02/2007 Circular No - 369 49.8 KB English
Conversion of a connection from one category to another category. 15/01/2007 Circular No - 368 100.5 KB English
Recording the readings of Check Meters alongwith other meters provided for other individual connections in “Building Complexes”. 04/01/2007 Circular No - 367 42.7 KB English
Monitoring of “Joint Inspection Report” (JIR) and early implementation of the observations made by the checking officers. 02/01/2007 Circular No - 366 43.7 KB English
Connection application, stamp and security amount for BPL consumers 30/12/2006 Circular No - 365 40 KB English
Maintaining register of the cases received/disposed By the various settlement committee(s). 28/12/2006 Circular No - 364 50.7 KB English
Instructions to billing 22/12/2006 Circular No - 363 46 KB English
“Amnesty Scheme” for Agriculture Category of Consumers-realization of outstanding dues thereof. 21/12/2006 Circular No - 362 55.8 KB English
Instructions to billing 14/12/2006 Circular No - 361 95.7 KB English
Withdrawl of orders bearing No. Comml.JDP/345 dtd. 27.09.06 & Comml.JDP/347 dtd. 07.10.06. 06/12/2006 Circular No - 360 41 KB English
Unguarded electric lines passing over educational institutions. 05/12/2006 Circular No - 359 46.7 KB English
“Amnesty Scheme” for Agriculture category of consumers- realization of outstanding dues thereof. 02/12/2006 Circular No - 358 163.7 KB English
Reconstitutions of Corporate Level Settlement Committee of Jodhpur Discom. 28/11/2006 Circular No - 357 41.5 KB English
Laying of separate feeder for industrial and nondomestic connections situated in rural areas for connecting them from continuous supply feeders. 15/11/2006 Circular No - 356 53.6 KB English
Replacement of burnt/damaged Service Lines. 15/11/2006 Circular No - 355 38.7 KB English
Replacement of burnt/damaged Push Fit Energy Meters. 15/11/2006 Circular No - 354 44.4 KB English
Limitation prescribed by Law in raising Debits as a consequence to meter found defective on testing-Debiting the assessment within 2 years. 09/11/2006 Circular No - 353 145.7 KB English
Calculation of the requirement of additional security on the basis of average consumption of electricity for the preceding twelve months. 09/11/2006 Circular No - 352 56.4 KB English
Reconnection of disconnected AG connections 09/11/2006 Circular No - 351 38.4 KB English
Recovery of security deposit equivalent to 30 days Consumption from industrial consumers revived under Revival Package announced by the State Government. 09/11/2006 Circular No - 350 50.1 KB English
Modification in “Meter Reading Record” (Jodhpur Discom A-10) revised vide Order No.Comml./JDP/334. 02/11/2006 Circular No - 349 102.8 KB English
Regarding applicability of tariff to be levied on electric connection taken under Community Kitchens being set up by the State Government under Mid Day Meal Programme 31/10/2006 Circular No - 348 60 KB English
Reconnection of disconnected Agriculture Consumers in Barmer, Jalore, Pali & Jodhpur District Circle. 07/10/2006 Circular No - 347 54.9 KB English
Release of NDS connections to Commercial Entities  27/09/2006 Circular No - 346 46.8 KB English
Reconnection of disconnected Agriculture Consumers in Barmer, Jalore, Pali & Jodhpur District Circle. 16/09/2006 Circular No - 345 101.4 KB English
Use of 3-Phase Static Meters (10-60 Amps.) for domestic, non-domestic & Small Industrial Category connections having 7.5 KW & above sanctioned connected load. 16/09/2006 Circular No - 344 41.7 KB English
Release of NDS category connections to various Organizations/Commercial Entities requiring Bulk connections at various locations in the area of Jodhpur Discom. 15/09/2006 Circular No - 343 86.7 KB English
Rates for compounding of offences under Section-152 of The Electricity Act-2003 against “Dishonest Abstraction Of Electricity” (Theft of Electricity). 15/09/2006 Circular No - 342 183.5 KB English
Element of Electricity duty included in the charges prescribed for various categories under"compromising / settlement charges scheme" for theft of electricity 15/09/2006 Circular No - 341 43.2 KB English
Vigilance checking of Agriculture Consumers under Flat Rate Category. 04/09/2006 Circular No - 340 45 KB English
Reconnection 01/09/2006 Circular No - 339 77 KB English
Clarification regarding applicability of tariff to be levied on electric connection taken under Community Kitchen being set up by the Govt. Mid Day Meal Programme in the State. 01/09/2006 Circular No - 338 54.6 KB English
Installation of meters for flat rate consumer. 01/09/2006 Circular No - 337 136.5 KB English
Action against a person for unauthorized use of Electricity & other offences under Sections 126, 127, 135 to 152 and Compounding of offence under Section-152 of the Electricity Act-2003. 01/09/2006 Circular No - 336 1.4 MB English
Rebate of 7.5% to be allowed to the consumers under Bulk Supply of Mixed Load (Schedule ML/LT-7) For supply on HT. 05/08/2006 Circular No - 335 100.7 KB English
Revision in “Meter Reading Record” (Jodhpur Discom A-10) for recording readings of Maximum Demand. 04/08/2006 Circular No - 334 84.7 KB English
Allowing grace period for payment of energy bills by the consumers. 27/07/2006 Circular No - 333 49.7 KB English
Inordinate delay in allowing credits/relief/concessions to the consumers. 11/07/2006 Circular No - 332 79.2 KB English
Removal of connections on dedicated feeders 05/06/2006 Circular No - 331 45.3 KB English
Charging consumers in case of Magnetic Temper. 28/05/2006 Circular No - 330 52.3 KB English
Authorization given to checking Officers to make a complaint in writing or lodge FIR on behalf of Jodhpur Discom 25/05/2006 Circular No - 329 118.6 KB English
Release of domestic connections in villages. 18/05/2006 Circular No - 328 53.9 KB English
Violation of provisions of Rule-87 of Indian Electricity Rules,1956 (Now Electricity Rules- 2005), thereby causing danger to human life & damages to costly apparatus installed by Department of Telecommunication. 17/05/2006 Circular No - 327 58.4 KB English
Adequate publicity of schedule outage period. 10/05/2006 Circular No - 326 44.5 KB English
Accepting payment of electricity bills of AG consumers on Ad hoc basis 03/05/2006 Circular No - 325 91.4 KB English
Charging of supervision charges @ 15% from the Rajasthan Housing Board. 03/05/2006 Circular No - 324 51.1 KB English
Amnesty Scheme for all categories of consumers realization of outstanding dues thereof. 15/04/2006 Circular No - 323 46.7 KB English
Charges to be recovered on reconnection. 12/04/2006 Circular No - 322 114.5 KB English
Charging of overhead and supervision charges. 12/04/2006 Circular No - 321 87.3 KB English
Concession in billing of hail affected village consumers for Feb and March 2006 07/04/2006 Circular No - 320 50.7 KB English
Sharing cost of shifting of existing electric lines. 01/04/2006 Circular No - 319 41.3 KB English
Assessment of civil liability in case of theft of electricity detected under Section 135 of the electricity act 31/03/2006 Circular No - 318 91.3 KB English
Adjustment of Ad hoc amount paid in advance for increase in load/ demand by the Industrial categories of consumers. 31/03/2006 Circular No - 317 49 KB English
excemption in Electricity Duty 31/03/2006 Circular No - 316 88.6 KB English
“Amnesty Scheme” for all categories of consumers – realization of outstanding dues thereof. 31/03/2006 Circular No - 315 46.7 KB English
Clarification in respect of recovery of various charges while accepting Application Form for NDS Connection. 29/03/2006 Circular No - 314 47.2 KB English
Clarification regarding recovery of security for CT PT Sets & its rent. 20/03/2006 Circular No - 313 30.4 KB English
Clarification regarding registering theft cases in Settlement Committee/Forum 20/03/2006 Circular No - 312 54 KB English
Authorization given to checking Officers to make a complaint in writing or lodge FIR on behalf of Jodhpur Discom 17/03/2006 Circular No - 311 45.9 KB English
“Amnesty Scheme” for all categories of consumers- realisation of outstanding dues thereof 09/03/2006 Circular No - 310 207.1 KB English
Segregation of Industrial load from rural and other load 03/03/2006 Circular No - 309 37.7 KB English
Release of connection in Police Lines/ Colonies of Police Personnel 16/02/2006 Circular No - 308 142.7 KB English
Organizing camp in Kachchi basties of urban areas 16/02/2006 Circular No - 307 61.5 KB English
Redressal of grievances of consumers 16/02/2006 Circular No - 306 73.4 KB English
Clarification regarding redressal of consumer grievancesthrough Forum or Settlement committee and permission of advocates therein. 25/01/2006 Circular No - 305 70 KB English
Modification of Comml.JDP/303 26/12/2005 Circular No - 304 72.4 KB English
installation of meters 01/12/2005 Circular No - 303 80 KB English
Conversion of hara chara special category, nursery category and rural category farm house Ag connections to general category 05/12/2005 Circular No - 302 83.2 KB English
Burnt meter vigilance ofAG connections 01/12/2005 Circular No - 301 80.7 KB English
Compliance of the directions of Raj. State Pollution Control Board to disconnect the electric supply for consumers for non-compliance of Section 31(A) fo Air Act-1981 & section 33(A) Water (Pre-vention & Control of Pollution) Act-1974. 24/11/2005 Circular No - 300 65 KB English
Regarding installation of sub meters for Iron & Steel Re-Rolling Mills. 24/11/2005 Circular No - 299 58.7 KB English
Accepting payment of electricity bills of AG consumers on Ad hoc basis 21/11/2005 Circular No - 298 85 KB English
Capacitor installation for Ag consumers 14/11/2005 Circular No - 297 58.1 KB English
Accepting payment of electricity bills of AG consumers on Ad hoc basis 14/11/2005 Circular No - 296 83.3 KB English
Determination under Section 126 and Appeal under Section 127 of Electricity Act 2003 14/11/2005 Circular No - 295 153.3 KB English
Failure of power transformers-expediting failure report, enquiry report by field officers. 07/11/2005 Circular No - 294 64.4 KB English
Excemption in Electricity Duty 07/11/2005 Circular No - 293 62.3 KB English
Relief to domestic and agriculture consumers. 24/10/2005 Circular No - 292 89.3 KB English
Internal Audit of decisions/settlements reached in Settlement Committee(s) 07/10/2005 Circular No - 291 66.6 KB English
Amendment in sub clause 16(F) of Terms & Conditions of Supply -2004 23/09/2005 Circular No - 290 70.9 KB English
Charging 50% of energy charges plus full fixed charges of “Domestic Service (Schedule DS/LT-1) instead of 50% of “Non Domestic Service (Schedule NDS/LT-2 or NDS/HT-2)” from GOSHALA’s connections. 23/09/2005 Circular No - 289 61.6 KB English
Paying attention to the representations made by consumers for redressal of grievances with the Ombudsman appointed by RERC. 23/09/2005 Circular No - 288 83.2 KB English
Insisting for production of “No Objection Certificate” 21/09/2005 Circular No - 287 54.2 KB English
Favvara/Boond Boond Irrigation method 20/09/2005 Circular No - 286 78.9 KB English
Accepting payment of electricity bills of AG consumers on Ad hoc basis 15/09/2005 Circular No - 285 74.7 KB English
Amnesty Scheme for realization of outstanding dues from Domestic, Non-Domestic, Agricultural, Industrial consumers, Govt. department and Local Bodies. 25/07/2005 Circular No - 284 57 KB English
Testing/Checking of connections under Small Industrial category having sanctioned connected load from 15 HP to 25 HP and NDS/Mixed load categories having sanctioned connected load form 18.65 KW to 25 KW. 08/07/2005 Circular No - 283 65.4 KB English
Recovery of minimum charges during unexpired period of agreement in the case of large Industrial consumers. 30/06/2005 Circular No - 282 67.8 KB English
Charges to be taken from PDC Consumers 28/06/2005 Circular No - 281 53.6 KB English
Change of category from SIP to MIP on eventualities arisen when maximum demand exceeds 25 HP (18.65 KW) on three occasions in a financial year. 25/06/2005 Circular No - 280 56 KB English
Assessment in case of stopped / stolen / lost or burnt Meter. 25/06/2005 Circular No - 279 58.9 KB English
Removing meter and service lines after two months from the date of disconnection-Clause 46(9) of TCOS-2004 24/06/2005 Circular No - 278 59.7 KB English
Amendment in Item(d) denoting “Payment” under Tariff (Schedule AG/FR/LT-4)” of “Tariff for Supply of Electricity-2004” 24/06/2005 Circular No - 277 57.5 KB English
Action against a person for unauthorised use of electricity and other offences under Sections 126, 127, 135 to 151 and compounding of offence under Section 152 of the Electricity Act-2003 21/06/2005 Circular No - 276 59.5 KB English
Modification of Comml.JDP/201 14/06/2005 Circular No - 275 118.9 KB English
Determination of incentive in Tariff to Large Industrial Consumers for the year 2004-2005 under previous / new incentive scheme. 04/06/2005 Circular No - 274 114.2 KB English
Recovery of Ad-hoc charges from the consumers involved in the act of “Theft of Electricity” 20/05/2005 Circular No - 273 136.6 KB English
Action against a person for unauthorised use of electricity & other offences under Section 126, 127, 135 to 151 and compounding of offence under section-152 of the Electricity Act-2003. 20/05/2005 Circular No - 272 123.3 KB English
Taking load data through MRI in respect of Large Industrial Consumers 13/05/2005 Circular No - 271 61.8 KB English
Amnesty Scheme for realization of outstanding dues from Domestic, Non-Domestic, Agricultural, Industrial consumers, Govt. department and Local Bodies. 12/05/2005 Circular No - 270 77.9 KB English
Power Rate of DL and AG connections in villages having population more than 5000 07/05/2005 Circular No - 269 74.7 KB English
Corrigendum of Comml.JDP/264 28/04/2005 Circular No - 268 74.4 KB English
Instructions for billing 27/04/2005 Circular No - 267 81.4 KB English
Procedure to be followed while entertaining and disposing the cases by consumers Dues Settlement Committee. 26/04/2005 Circular No - 266 64.2 KB English
Rules framed by Central Government under Electricity Act-2003 in respect of Intimation of Accidents (Form and Time of service of Notice) Rules, 2004. 23/04/2005 Circular No - 265 51.8 KB English
Exemption in Electricity Duty to the units declared eligible Under Investment Promotion Scheme, 2003. 13/04/2005 Circular No - 264 64.4 KB English
Conversion of Flat Rate consumers into Metered Supply consumers under agriculture category. 06/04/2005 Circular No - 263 55.3 KB English
Security for Industrial consumers opting fortnightly billing. 30/03/2005 Circular No - 262 59.6 KB English
determination of tariff for retail supply of electricity 22/03/2005 Circular No - 261 52.6 KB English
determination of tariff for retail supply of electricity 22/03/2005 Circular No - 260 56 KB English
Waival of balance amount of the auctioned industrial units. 22/03/2005 Circular No - 259 58.5 KB English
Disposal of burnt CT/PT Sets. 22/03/2005 Circular No - 258 59.4 KB English
Applicability of Tariff on BSNL Exchanges / Switches including attached offices. 03/03/2005 Circular No - 257 60.6 KB English
Filing of Appeal under section 127 of the Electricity Act-2003, against the final assessment made under section -126 fo the Electricity Act 2003. 21/02/2005 Circular No - 256 70.6 KB English
Change of category from SIP to MIP in eventualities when the maximum demand exceeds 25 KVA on three occasions in a financial year. 19/02/2005 Circular No - 255 61 KB English
Corrigendum of Comml.JDP/241 08/02/2005 Circular No - 254 52.8 KB English
Including the name of Debt Recovery Tribunal (DRT) under the purview of Order Comml./JDP-187 dt. 28-01-04 and Clasue 42(6) of TCOS-2004 07/02/2005 Circular No - 253 122.8 KB English
Applicability of revised tariff on Domestic & Agriculture categories. 07/02/2005 Circular No - 252 55.2 KB English
Disconnection while issuing `No dues' in favour of employee vacating Nigam's building 07/02/2005 Circular No - 251 55.5 KB English
Concession package to be allowed for revival of sick industries. 22/01/2005 Circular No - 250 73.6 KB English
Applicability of the provisions of Clause-47 (2) of the “Terms & Conditions for Supply of Electricity, 2004” (TCOS-2004). 15/01/2005 Circular No - 249 70.9 KB English
Assessment in cases of stopped/lost/stolen/burnt/ defective meter and cases where unauthorized use of electricity or theft of electricity is involved. 10/01/2005 Circular No - 248 155.1 KB English
Clarification with regard to release of domestic Connections in Urban areas 07/01/2005 Circular No - 247 62.7 KB English
Review of Security of Large Industrial/Medium Industries and HT Non Domestic Consumers. 07/01/2005 Circular No - 246 86.9 KB English
Laying of separate feeder for Industrial and Nondomestic Connections situated in Rural Areas for connecting them from continuous supply feeder. 17/12/2004 Circular No - 245 75.3 KB English
Precaution to be taken while entertaining and disposing the cases by the Consumers Dues Settlement Committees under Sec.52 of “Terms and Conditions For Supply of Electricity-2004" 15/12/2004 Circular No - 244 156.5 KB English
Guidelines to be followed for redressal of consumer grievances against notification No.RERC/Sec/Reg.l5 dt. 3-11-2003 15/12/2004 Circular No - 243 58.9 KB English
Instructions for proper maintaining the printed complaint register at various levels 15/12/2004 Circular No - 242 61.3 KB English
Action against a person for unauthorised use of electricity & other offences under Sections 126, 127, 135 to 151 and Compounding of offence under Section-152 of the Electricity Act-2003 15/12/2004 Circular No - 241 290.7 KB English
Waiver of connection charges of Rs.1500.0 in case of new Connection for PDC consumers of domestic category. 15/12/2004 Circular No - 240 50.8 KB English
Concession package to be allowed for revival of Sick Industries-clarification thereof. 05/10/2004 Circular No - 239 70.9 KB English
Concession in minimum billing forAG metered and special consumers 22/09/2004 Circular No - 238 61.7 KB English
Concession package to be allowed for revival of Sick industries. 21/09/2004 Circular No - 237 59.3 KB English
Levy of Electricity Duty on persons generating Electricity- Delegation of powers thereof 21/09/2004 Circular No - 236 68.2 KB English
Delegation of Powers 17/09/2004 Circular No - 235 51.6 KB English
Applicability of tariff to M/S Kalpatru Power Transmission Limited(Non Conventional energy source) for their 07 MW Bio-Mass based Project. 31/08/2004 Circular No - 234 56.2 KB English
Recovery of difference of Stamp Duty in respect of agreement etc. from the consumers. 24/08/2004 Circular No - 233 50.2 KB English
Waival of LPS/DPS against the payment of energy Bills in respect of sub-stations & offices of RRVPNL, RRVUNL & JdVVNL. 24/08/2004 Circular No - 232 56.3 KB English
Instructions for billing 19/08/2004 Circular No - 231 88.1 KB English
Concession package to be allowed for revival of sick industries. 09/08/2004 Circular No - 230 69 KB English
Rate of Electricity Duty 09/08/2004 Circular No - 229 52.7 KB English
Commencement of single window in Jodhpur Discom for entertaining application, release of electric Connection and for billing of such connections. 03/08/2004 Circular No - 228 112.4 KB English
Refund of Transformer back-up charges. 29/07/2004 Circular No - 227 53.5 KB English
Formulation of policy for granting relaxation in supply Voltage at the time of enhancement of contract demand 29/07/2004 Circular No - 226 123.6 KB English
Rate of Electricity Duty 20/07/2004 Circular No - 225 83.4 KB English
Prescribed norms for electrification of colonies developed by private builders and other agencies. 15/07/2004 Circular No - 224 54.2 KB English
Levying/allowing power factor surcharge/ Incentive to sub-metered categories like Domestic, NonDomestic, Bulk Supply for Mixed Load of the main connection under Large Industrial Category. 12/07/2004 Circular No - 223 97.2 KB English
Recovery of cost in case of burnt meter / reconnection etc. 09/07/2004 Circular No - 222 46.1 KB English
Refund / adjustment of cost of energy Meter recovered in lieu of security 21/06/2004 Circular No - 221 53 KB English
Levy of power factor surcharge and allowing incentive in light of "Power Factor Clause" of Tariff for supply of Electricity 2001 17/06/2004 Circular No - 220 62.5 KB English
Incentive scheme for maintaining "Fault Free Feeders: during a month, in Industrial area 17/06/2004 Circular No - 219 57.6 KB English
Replacement of 1-ph and 3-ph Conventional meters by Static meters 16/06/2004 Circular No - 218 47.6 KB English
Recovery of difference of stamp duty in respect of agreement etc from consumers 02/06/2004 Circular No - 217 58.1 KB English
Revision in cost of meter boxes and meter security to be recovered from the consumers 21/05/2004 Circular No - 216 54.8 KB English
Billing of Consumers if the connected load / cntract demand is revised in the middle of the month 21/05/2004 Circular No - 215 60.6 KB English
Prescribing norms for electrification od colonies to be developed by private builders and other agencies 17/05/2004 Circular No - 214 79.7 KB English
Abeyance in Comml.JDP/207 07/05/2004 Circular No - 213 52.6 KB English
Recovery of line dismentalling charges from LIP consumers being permanently disconnected and recovery of cost of releasing  of Service line from consumers seeking reconnection after two months from the date of disconnection 29/04/2004 Circular No - 212 47.5 KB English
Installation of GO switches and Horn Gap fuses for connections of HT consumers 20/04/2004 Circular No - 211 82.2 KB English
Recovery of additional security from the Industrial consumers desiring extension in connceted load/ contract demand 20/04/2004 Circular No - 210 37.5 KB English
Notice period for disconnection of defaulting consumers 20/04/2004 Circular No - 209 42.4 KB English
Applicability of PF surcharge / Incentive as per Tariff provision 20/04/2004 Circular No - 208 47.5 KB English
Cost of meter and meter boxes 20/04/2004 Circular No - 207 70.5 KB English
Requirement of NOC from RIICO for releasing new connections under Industrial and other categories 20/04/2004 Circular No - 206 44.8 KB English
Non clearance of proceedings of Settlement committee meetings 20/04/2004 Circular No - 205 69.8 KB English
Use of HDPE pipe in agricultural pump sets 16/04/2004 Circular No - 204 76.5 KB English
Information about Incharge of the Office and Controlling Officer under Raj. RTI 16/04/2004 Circular No - 203 43.4 KB English
Change of billing of category of recognized educational Institutions from NDS to bulk supply for mixed load 31/03/2004 Circular No - 202 56.9 KB English
Rules and regulations in exercise of powers conferred by Section 180 (1) of Sec 127 of EA 2003 18/03/2004 Circular No - 201 103.7 KB English